Post Job Free
Sign in

Engineer Project

Location:
Chennai, TN, India
Posted:
June 21, 2013

Contact this candidate

Resume:

PRAKASH DEVARASU

Pazhani House, Palissery Post, Thrissur District-680027, Kerala.

Mobile No: +918*********

E-mail: ***********@*****.***

Date of Birth: 10/06/1991

Objective

To explore the areas which would best suit me and to make use of the opportunities

available to develop my own proficiency and help the associated organization to march toward

excellence, thus providing a symbiotic atmosphere in the process of nation building.

Educational Details:

Degree Board/University Year of Passing Percentage

B.E., Karpagam university

(Mechanical 2012 72.25%

Engineer)

Diploma P.G.P Polytechnic

(Mechanical College 2009 77.99%

Engineer)

10th Standard Govt. High School 2006 64.45%

RESEARCH EXPERIENCE

B.E., Project

TITTLE: “Improving a Performance of Worker by Using Work Measurement Techniques ”

Description

The measurement of work finished on hand by hand with methods design. Work

measurement is used to find the time allowed to complete the job by that procedure. Work measurement

is the application of techniques designed to establish the time for a qualified worker to carry out

specified jobs at a defined level of performance. Work measurement techniques fined the time required

to did a job by qualified worker at standard place and using the standard method .Work measurement is

concerned with investigated, reducing or eliminating ineffective time and operation or series of

operations in such a way that the ineffective time is shown up and can be separated out. In practice,

proving existence of the ineffective time is the most difficult task. Work measurement is also used to set

standard times to carry out the work, so that any ineffective time is not included later. Any addition the

standard time would show up as excess time and thus can be brought to attention. Major reason for that

has been the initial focus of the work measurement methods, which essentially targeted only the worker

controllable ineffective times. Elimination of management controllable ineffective time should precede

the elimination of the ineffective time within the control of the workers.

Project Works

• I have done the mini project on “Power Saving System for Lathe” Karpagam University,

Coimbatore-November-2011.

• I have done the project on “Automatic Pneumatic Vice” P.G.P Polytechnic College,

Namakkal-March-2009.

Working Experience

• I have Experience in Design Engineering Trainee at Six Months. November 2012- April 2013.

Co-Curricular Activity

• I did undergo an Industrial Training on South Indian Railway, Tiruchirappali.

Computer Proficiency

Packages

• Pro-E

• CATIA V5

Field of Interest

• Design Engineer (CATIA)

Personal Strength

• Self Confident

• Adaptability

• Efficient Time Management

Hobbies

• Gardening

• Swimming

Declaration

Here, I should declare the above that information’s is true to my best knowledge.

Place: Thirissur PRAKASH D

Date: 29/05/2013



Contact this candidate