Name and First name: Feki Wajdi
Nationality: Tunisian
Mobile: +216********
E-mail: *****.****@******.***.**
*****.****@*****.**
Works Experiences
• March 2013:Pireco-Bir Mcherguia Tunisia
Customer: GE
Position : Mechanical supervisor of power plant installation (two gas turbine Frame9E)
• December 2012:Pireco-Feriana Tunisia
Customer: GE Power & Water
Position : Mechanical supervisor and coordination of GE gas turbine 9Eplanned outages for HGP
inspection.
• September 2012:Pireco-Bir Mcherguia Tunisia
Customer: GE Power & Water
Position: Mechanical supervisor and coordination of GE gas turbine 9Eplanned outages for HGP
inspection.
• Mai 2012:Pireco-CPC Rades Tunisia
Customer: GE Power & Water
Position: Mechanical supervisor and coordination of GE gas turbine 9Eplanned outages for majeur
inspection.
• April 2012:Pireco-La GouletteTunisia
Customer: GE Power & Water
Position: Mechanical supervisor and coordination of GE gas turbine 9Eplanned outages Hot gas path
inspection
• November 2011: Pireco-Mohammadia Morocco
Customer: GE Power & Water
Position: Mechanical supervisor and coordination of GE gas turbine 9Eplanned outages Hot gas path
inspection.
• September 2010: Pireco-MLE Algeria
Customer: Saipem
Position: Mechanical Supervisor for gas compressor plant installation.
Mission: Installation of 3 turbo-compressor PGT 25+ and these accessories (Inlet duct, filter house,
exhaust, structure, ventilation duct,, pipe rack, piping)
Installation of the piping on site (gas lines, air instrument, oil, mineral water, synthetic water,
demineralized water, firefighting).
Control NDT, flushing and hydro test.
Control preparation and quality of painting
Preparation of the site needed (personal and material).
Preparation of the planning
Preparation of the site needed (personal and material).
Planning preparation.
Daily report preparation.
Nonconformity report preparation NCM (Not Conformity Materials).
Coordination and the follow-up of the subcontractors on site.
Coordination with all the disciplines (civil, electric, instrumentation)
Coordination with HSE team for work in height, handling and confined spaces.
Coordination with Pre-commissioning and commissioning team.
Coordination with the customer
The follow-up of the punsh-list (issued customer) and to have the solutions to solve them.
• February 2009: Pireco-Mammoura Tunisia
Customer: ENI
Position: Project Coordinator of the CPF installation.
Mission : Coordination with the customer.
Coordination with the various departments (Engineering, purchase, construction)
Construction planning preparation,
the mobilization of the personnel.
Preparation theassembly procedures, erection procedures, handling procedure and the transport
procedures for the large equipment with heavy loads.
The follow-up of the purchases.
Preparation of the site needed (personal and material )
The reception of materials FAT (factory acceptance test), gas compressor, booster compressor, TEG
unit, Flare, 3 phase separator, slug catcher, pig reicerver, fuel gas system in the United States of
Americas and Canada.
The supervision of the assembly of all the process equipment.
• 0ctobre 2007: Pireco- Wed ZAR Tunisia
Customer: ENI
Post: Site manager of the power plant installation.
Mission : Installation of 2 turbines GE-10 and these accessories (Inlet duct, filter house, exhaust,
structure,, ventilation duct,, pipe rack, piping,generator)
Installation of the piping on site (gas lines, air instrument, oil, mineral water, synthetic water,
demineralized water, firefighting).
Material reception of two turbines GE-10 to the head office of NuovoPignioni in Florence.
String test approval of the turbines on NuovoPignioni workshop in Florence.
Installation of the equipment of process: Fuel gas skid, generator.
Control NDT, flushing and hydro test.
Control preparation and quality of painting.
Installation of a water tank of a capacity of 4500m3.
Installation of the transformers .
Preparation of the site needed (personal and material).
Planning preparation
Preparation of the site needed (personal and material).
Daily report preparation.
Nonconformity report preparation (Not Conformity Materials).
Coordination and the follow-up of the subcontractors on site.
Coordination with all the disciplines (civil, electric, instrumentation)
Coordination with HSE team for work in height, handling and confined spaces.
Coordination Pre-commissioning and commissioning team.
Coordination with the customer
The follow-up of the punsh-list (issued customer) and to have the solutions to solve them.
• February 2007: Pireco-Feriana Tunisia
Customer: NuovoPignioni GE
Post: Mechanical Supervisor of gas compressor plant installation.
Mission : Installation of a turbo-compressor PGT 25 and these accessories (Inlet duct, filter house,
exhaust, structure,, ventilation duct,, pipe rack, piping)
Installation of the piping on site (gas lines, air instrument, oil, mineral water, synthetic water,
demineralized water, firefighting).
Control NDT, flushing and hydro test.
Control preparation and quality of painting
Preparation of the site needed (personal and material).
Planning preparation
Preparation of the site needed (personal and material).
Daily report preparation.
Nonconformity report NCM preparation (Not Conformity Materials).
Coordination and the follow-up of the subcontractors on site.
Coordination with all disciplines (civil, electric, instrumentation)
Coordination with HSE team for work in height, handling and confined spaces.
Coordination with Pre-commissioning and commissioning team.
Coordination with the customer
The follow-up of the punsh-list (issued customer) and to have the solutions to solve them.
• March 2006: Pireco-Zarziz Tunisia
Customer: Ecumed-Candax
Post: Mechanical Supervisor for pipe line installation(offshore).
Mission : The supervision of the installation of the pipeline.
The control of the pipeline installation .
The control of the NDT.
The control of the coating of the pipeline.
The control of the the hydro-test of the line.
Coordination with the subcontractors and the customer.
Coordination with HSErelays for handling of the pipe on sea.
• 0ctobre 2004: Pireco- Goulette Tunisia
Customer: GE EUROPE
Post: Mechanical Supervisor of powerplant installation.
Mission : Installation of gas turbine Frame9 E and these accessories (admission, filter house, exhaust,
structure, Shelter, ventilation duct, generator, pipe rack, piping one bases)
Installation of the piping on site (Inlet gas, air instrument, oil, mineral water, synthetic water,
demineralized water, firefighting).
Control NDT, flushing and hydro test.
Control preparation and quality of painting.
Installation of a water tank of a capacity of 5500m3.
Installation of the transformers (the Main, secondary).
Preparation of the site needed (personal and material).
Planning preparation.
Daily report preparation.
Nonconformity report NCM preparation(Not Conformity Materials).
Coordination and the follow-up of the subcontractors on site.
Coordination with all disciplines (civil, electric, instrumentation)
Coordination with HSE team for work in height, handling and confined spaces.
Coordination with Pre-commissioning and commissioning team.
Coordination with the customer
The follow-up of the punsh-list (issued customer) and to have the solutions to solve them.
Education
• Engine Specialist Degree.
Data-processin&languages
• French : Good Skills both written & oral
• English: Good Skills both written & oral
• Arabic: Good Skills both written & oral
• Italian: Convertional
• Data: Microsoft Office, lotus notes, Internet
.