Post Job Free

Resume

Sign in

Plant Engineer

Location:
United States
Salary:
1000 usd/day
Posted:
June 25, 2016

Contact this candidate

Resume:

Raduta Neagu

CHEMICAL ENGINEER - OIL & GAS

[pic]

Date of birth: 14th of October 1964

Marital status: Married

Nationality: Romanian

Address: Romania, Ploiesti Town.

Home phone: +403********

Mobile phone: +407********

Email: abumtf@r.postjobfree.com; abumtf@r.postjobfree.com;

abumtf@r.postjobfree.com

Foreign language: English

Computer: - MS-OFFICE: Word, Excel

- DCS - DELTA V and ABB

EDUCATION AND TRAINING

Academic

1994 "Oil and Gas" University from Ploiesti-Romania. The Faculty of

Oil&Gas Technology and

Petrochemistry

Specialization: Chemical Engineer - Technology of Oil&Gas Processing

and Petrochemistry (Bachelor degree)

Training courses and specializations

2004 "Naftoxim-Lukoil" Burgas Refinery, Bulgaria

Specialization in Oil Processes

EMPLOYMENT HISTORY

August 2012 - March 2013

Nigeria, ILF Engineers - Lagos

Position: Lead Process Engineer (PMT)

Client: SAPETRO (South Atlantic Petroleum Benin SA) Nigeria

Project: S m Field Re-Development, SAPETRO Benin SA, PMC, Nigeria

Key project data: S m Field, which is a defined area within Block-1, is

in water depth range of 27-30 meters, 15 km from Benin Coast and 30 km

from Cotonou Port.

November 2011 - June 2012

UAE, ILF Consulting Engineers - Abu Dhabi

Position: Sr. Process Engineer (PMC)

Contractor: China Petroleum Engineering & Construction Company (CPECC)

Client: PetroChina

Project: Halfaya field Phase 1, Crude Oil Gathering & Central Processing

Facilities, Source Water Plant, Gas Export Pipeline & Gas Receiving

Station, Crude Oil Intermediate Pumping Station, Iraq

June 2008 - October 2010

Nigeria, Pan Ocean Oil Corporation (POOC), Gas Department, Ovade-Ogharefe

Gas/Oil/Water Separation Station and Gas Processing Plant.

Contractor: LEMNA Energy Resources.

Client: POOC.

Position: Gas Plant Operation Engineer / Operation Supervisor

Project phase I: Associated Gases Processing Plant, three stages gas

compressing, gas drying, gas dew point reduction (cryogenic), exported

gas re-compressing, condensate (LPG) separation and stabilization.

Participation at Project development: up-gradation and de-bottlenecking

of existing facilities Gas/Oil/Water Separation Plant, construction of a

new train of separators on Gas/Oil/Water Separation Plant with all

necessary facilities, construction of new Gas Processing Plant with all

necessary facilities, pre-commissioning and commissioning activities.

My activity consists of:

-Verifying of the Project documentation;

-Taking part of HAZOP/HAZID;

-Supervision of sites construction/installation activities;

-Determination and supervision installation of the tie-ins for phase II;

-Checking that all the pipes, systems and equipments are in conformity

with the Project documentation;

-Supervision all pre-commissioning activities; performing of Nitrogen

inertisation and leak tests for all the systems together with constructor

personnel;

-Fallowing punch lists issues and their resolution;

-Testing of DCS and ESD;

-Performing and supervising of run-in test for all dynamic equipments;

-Putting in service of entire Gas Plant Facilities, system by system and

equipment by equipment;

-Performing Gas Plant test performance, gas exporting and stopping the

gas flaring at the Gas/Oil/Water Separation Station;

-Being part of board for interviews for employment, performing on job

training and mentoring of DCS / Field Operators for Gas Plant

Commissioning and Operation;

-Elaboration of Start-up Instructions and Gas Plant Operation Manual.

April - May 2008

Qatar, QAPCO (Qatar Petrochemical Company), Polyethylene Plant.

Contractor: Snamprogetti.

Client: QATOFIN (Qatar Petrochemical Company joined with Total France).

Position: Process Trainer

Type of Plant: LLDPE (Linear Low Density Polyethylene) Plant.

Performing Site Induction Course for Panel Operators and Field Operators

of Linear Low Density Polyethylene Plant.

June - December 2007

-UAE, OGD III Up-stream Project at BAB, Tamama "F" Facilities, Habshan

Site. (Gas/LPG gathering from existing/new installed well heads to the

LPG Plant battery limit).

Constructor: National Petroleum Construction Company.

Client: Abu Dhabi Operating Company.

-UAE, Zacum West Super Complex, Off-shore Facilities: Platforms Tie-Ins /

Brownfield works / De-Bottlenecking / Up-Gradation.

Constructor: National Petroleum Construction Company.

Client: Abu Dhabi Marine-Operating Company

Position: Senior Process Commissioning Engineer

My activity consists of:

-Verifying the Project documentation;

-Checking that all the pipes, systems and equipments are in conformity

with the Project documentation;

-Preparation of Hydro test packs Dossiers, specified check lists and

punch lists;

-Supervision of Pipes hydro tests, Nitrogen inertisation and leak tests

for all the systems performed by constructors' personnel;

-Performing of the test run for the new installed pumps;

-Preparing of Ready for Commissioning Dossiers;

-Preparing of Startup Procedures for new installed equipments/systems:

Flare KOD System, Open Drain System, Closed Drain System and Flare Low

Point Blow Case System.

April - May 2007

Romania, S.C. Petroconsult SRL

Position: Process Training Supervisor

Type of Plant: Fluid Catalyst Cracking

Performing Class training and On the Job Training for a Vietnamese Team

at FCC Unit from Petrotel-Lukoil Refinery Ploiesti.

November 2006 - January 2007

Algeria, New Natural Gas Compression Station from Tin Fouye-Tabankort and

the extensions of the existents Compression Stations from Rhourde Nouss,

Zina, Ouargla and Hassi R'Mel.

Constructor: SARPI. Client: SONATRAC.

Position: Process Commissioning Engineer, ABB Process Solutions &

Services Sp A

Type of Plant: Natural Gas Compression Station (ABB License) which

consists of:

. Two Turbo generators (SOLAR)

. Two Turbo compressors (NUOVO PIGNONE)

. Natural Gas Filters

. Fuel gas system (TORMENE)

. Air utility system

. Water utility system and Fire water system

. Waste water system

My activity consists of:

-Verifying of all the Project documentation;

-Checking that all the pipes, systems and equipments are in conformity

with the Project documentation;

-Performing of Nitrogen inertisation and leak tests for all the systems

together with the constructor personnel;

-Testing of DCS and ESD;

-Putting in service of systems and equipments together with vendors.

August 2005 - September 2006

Nigeria, NNPC, Warri Refinery, FCC Unit

Position: Technician Back-up Operators

Type of Plant: Fluid Catalyst Cracking (KELOGG License) which consists

of:

. Converter System (reactor and regenerator)

. Main Fractionation (fractionation column, top receiver, air coolers,

water coolers, heat exchangers, furnace, separators, steam generator,

centrifugal pumps)

. CO Boiler (high pressure steam, with two fans driven by steam turbine and

with fuel gas and liquid fuel burners)

. Air Blower (Nuovo Pignone, driven by steam turbine)

. Gas Compressor (Nuovo Pignone, two stages, driven by steam turbine)

. Vapors Recovery Unit (two absorptions column, stripper, re-boiler,

separators, air coolers, heat exchangers, centrifugal pumps)

. Gasoline and LPG Fractionation System (debutanizer and depropanizer

columns, receivers, top receivers, air coolers, water coolers, re-

boilers, centrifugal pumps)

. Absorption with Mono-ethanol-amine and Amine Regeneration System (two

absorption columns for LPG and for fuel gas, amine regeneration column,

amine-LPG separators, top receiver, air coolers, re-boilers, pumps)

. Merox LPG (pre-washing with caustic soda column, extraction with caustic

soda column, LPG-soda separator, filter with sand, caustic soda

regeneration system, caustic soda reciprocating circulation pumps)

. Merox gasoline (mixing column, caustic soda - gasoline separator, filter

with sand, caustic soda circulation pumps)

. LPG vaporization system for fuel gas refinery system

My activity consists of:

-Participating at the start-up, normal shut-down and emergency shut-down

of the plant in safe conditions;

-Checking and maintaining of the parameters in normal limits of

functioning in order to obtain quality products;

-Checking all the dynamic equipment running and stand-by;

-Executing the orders received from the Plant Superintendent and

informing him about all the problems occurred during the equipments

performance;

-Supporting of Plant Superintendent and Chief Operators in technical

problems;

-Cooperation relationships with the sectors involved in the activity of

maintenance.

1999-2005

Romania, S.C. Petrotel - Lukoil S.A. Ploiesti -FCC Unit

Position: Plant Superintendent

Type of Plant: Gas Concentration-Merox-Gas fractionation from Fluid

Catalyst Cracking (UOP License) which consists of:

. Gas compressor (Hitachi, two stages, driven by electric driver)

. Gas Concentration (two absorption columns, stripper, re-boiler,

separators, air coolers, water coolers, heat exchangers, centrifugal

pumps)

. UOP Merox LPG (absorption column with amine, pre-washing with caustic

soda column, extraction with caustic soda column, LPG-soda separator,

filter with sand, soda regeneration system, reciprocating soda

circulation pumps)

. UOP Merox gasoline (mixing column, soda-gasoline separator, filter with

sand, soda circulations pumps)

. Gas fractionation (debutanizer, depropanizer and dryer columns, propane-

propylene splitter, air coolers, top receivers, re-boilers, water coolers

and condensators, centrifugal pumps)

My activity consists of:

-Elaboration of the Operation Manual, Procedures, Instructions,

Applications;

-Coordinating production activities, making the unit material balance -

sheet, checking and maintaining of the parameters in normal limits of

functioning in order to obtain quality products;

-Coordinating the start-up, shut-down and emergency shut-down of the

plant in safe conditions;

-Checking of the supplies of raw materials, products, merox-catalyst,

chemicals;

-Responsible with the staff instruction about labor protection, checking

and maintaining of the safety endowments in good shape;

-Cooperation/coordonation relationships with the sectors involved in the

production activity and maintenance;

-Taking part at the technological changes brought to the plant. I was

involved in DCS Implementation (Emerson License). The Units was revamped

in 2004;

-Being part of board for interviews and employment, performing training

and mentoring of Chief/DCS / Field Operators;

-Coordination with the designers or with the catalyst suppliers in order

to obtain superior qualities and efficiencies of the products;

-Taking part at performance tests of the plant;

-Optimization the consumption utilities and catalyst.

1998 -1999

Romania, SC Petrotel - Lukoil SA - Alkylating Plant.

Position: Plant Superintendent

Type of Plant: Alkylating with Hydro-Fluoric Acid Plant (UOP License)

which consists of:

. Preparation of Row Material System (super-fractionation column for C4 cut

and drying of the top cut)

. Reaction System (reactor, separation column, tank with fresh HF,

circulation pumps, fresh acid pumps)

. Acid Regeneration System

. Fractionation System (iso-stripper column, fractionations columns, top

receivers, separators, air cooler, water coolers, heat exchangers,

furnace, re-boilers, pumps)

. De-acidification System for all the products and for residual gases

My activity consists of:

-Elaboration of the Operation Manual, Procedures, Instructions,

Applications;

-Responsible with the staff instruction about labor protection, checking

and maintaining of the safety endowments in good shape;

-Cooperation/coordination relationships with the sectors involved in the

activity of revamping and maintenance.

1994-1998

Romania, S.C Petrotel - Lukoil S.A. - Propane De-asphalting Plant

Position: Process Engineer

Type of Plant: Propane De-asphalting Plant (IPIP Romania License) which

consists of:

. Extraction of oil with liquid propane

. Oil-propane Separation System

. Asphalt-propane Separation System

. Propane recovery and liquefying using a reciprocating compressor in two

steps

. Propane treatment with mono-ethanol-amine

My activity consists of:

-Elaboration of the procedures, instructions, applications;

-Making the unit material balance - sheet, checking and maintaining of

the parameters in normal limits of functioning in order to obtain quality

products;

-Checking of the supplies of row materials;

-Registering the results of laboratory samples;

-Participating at the start-up, normal shut-down and emergency shut-down

of the plant in safe conditions;

-Cooperation relationships with the sectors involved in the activity of

production and maintenance;

-Optimization of the consumption utilities.

1993-1994

Romania, S.C Petrotel - Lukoil S.A. - Propane De-asphalting Plant

Position: Control Room Operator

I participated to pre-commissioning tests and to the first start up of

the Propane De-asphalting Plant.

My activity consists of:

-Participating at the start-up, normal shut-down and emergency shut-down

of the plant in safe conditions;

-Checking and maintaining of the parameters in normal limits of

functioning in order to obtain quality products;

-Checking the supplies of raw materials, products;

-Executing the orders received from the foreman and informing him about

all the issues occurred during the equipments performance;

-Cooperation relationships with the sectors involved in the activity of

production and maintenance.

1985-1993

Romania, UZTEL Ploiesti - Oxygen Factory

Position: Panel Operator

My activity consists of:

-Checking and maintaining of the parameters in normal limits of

functioning in order to obtain quality products;

-Start-up, normal shut-down and emergency shut-down of the plant in safe

conditions;

-Executing the orders received from the foreman and informing him about

all the issues occurred during the equipments performance;

-Cooperation relationships with the sectors involved in the activity of

production and maintenance.



Contact this candidate