Raduta Neagu
CHEMICAL ENGINEER - OIL & GAS
[pic]
Date of birth: 14th of October 1964
Marital status: Married
Nationality: Romanian
Address: Romania, Ploiesti Town.
Home phone: +403********
Mobile phone: +407********
Email: abumtf@r.postjobfree.com; abumtf@r.postjobfree.com;
abumtf@r.postjobfree.com
Foreign language: English
Computer: - MS-OFFICE: Word, Excel
- DCS - DELTA V and ABB
EDUCATION AND TRAINING
Academic
1994 "Oil and Gas" University from Ploiesti-Romania. The Faculty of
Oil&Gas Technology and
Petrochemistry
Specialization: Chemical Engineer - Technology of Oil&Gas Processing
and Petrochemistry (Bachelor degree)
Training courses and specializations
2004 "Naftoxim-Lukoil" Burgas Refinery, Bulgaria
Specialization in Oil Processes
EMPLOYMENT HISTORY
August 2012 - March 2013
Nigeria, ILF Engineers - Lagos
Position: Lead Process Engineer (PMT)
Client: SAPETRO (South Atlantic Petroleum Benin SA) Nigeria
Project: S m Field Re-Development, SAPETRO Benin SA, PMC, Nigeria
Key project data: S m Field, which is a defined area within Block-1, is
in water depth range of 27-30 meters, 15 km from Benin Coast and 30 km
from Cotonou Port.
November 2011 - June 2012
UAE, ILF Consulting Engineers - Abu Dhabi
Position: Sr. Process Engineer (PMC)
Contractor: China Petroleum Engineering & Construction Company (CPECC)
Client: PetroChina
Project: Halfaya field Phase 1, Crude Oil Gathering & Central Processing
Facilities, Source Water Plant, Gas Export Pipeline & Gas Receiving
Station, Crude Oil Intermediate Pumping Station, Iraq
June 2008 - October 2010
Nigeria, Pan Ocean Oil Corporation (POOC), Gas Department, Ovade-Ogharefe
Gas/Oil/Water Separation Station and Gas Processing Plant.
Contractor: LEMNA Energy Resources.
Client: POOC.
Position: Gas Plant Operation Engineer / Operation Supervisor
Project phase I: Associated Gases Processing Plant, three stages gas
compressing, gas drying, gas dew point reduction (cryogenic), exported
gas re-compressing, condensate (LPG) separation and stabilization.
Participation at Project development: up-gradation and de-bottlenecking
of existing facilities Gas/Oil/Water Separation Plant, construction of a
new train of separators on Gas/Oil/Water Separation Plant with all
necessary facilities, construction of new Gas Processing Plant with all
necessary facilities, pre-commissioning and commissioning activities.
My activity consists of:
-Verifying of the Project documentation;
-Taking part of HAZOP/HAZID;
-Supervision of sites construction/installation activities;
-Determination and supervision installation of the tie-ins for phase II;
-Checking that all the pipes, systems and equipments are in conformity
with the Project documentation;
-Supervision all pre-commissioning activities; performing of Nitrogen
inertisation and leak tests for all the systems together with constructor
personnel;
-Fallowing punch lists issues and their resolution;
-Testing of DCS and ESD;
-Performing and supervising of run-in test for all dynamic equipments;
-Putting in service of entire Gas Plant Facilities, system by system and
equipment by equipment;
-Performing Gas Plant test performance, gas exporting and stopping the
gas flaring at the Gas/Oil/Water Separation Station;
-Being part of board for interviews for employment, performing on job
training and mentoring of DCS / Field Operators for Gas Plant
Commissioning and Operation;
-Elaboration of Start-up Instructions and Gas Plant Operation Manual.
April - May 2008
Qatar, QAPCO (Qatar Petrochemical Company), Polyethylene Plant.
Contractor: Snamprogetti.
Client: QATOFIN (Qatar Petrochemical Company joined with Total France).
Position: Process Trainer
Type of Plant: LLDPE (Linear Low Density Polyethylene) Plant.
Performing Site Induction Course for Panel Operators and Field Operators
of Linear Low Density Polyethylene Plant.
June - December 2007
-UAE, OGD III Up-stream Project at BAB, Tamama "F" Facilities, Habshan
Site. (Gas/LPG gathering from existing/new installed well heads to the
LPG Plant battery limit).
Constructor: National Petroleum Construction Company.
Client: Abu Dhabi Operating Company.
-UAE, Zacum West Super Complex, Off-shore Facilities: Platforms Tie-Ins /
Brownfield works / De-Bottlenecking / Up-Gradation.
Constructor: National Petroleum Construction Company.
Client: Abu Dhabi Marine-Operating Company
Position: Senior Process Commissioning Engineer
My activity consists of:
-Verifying the Project documentation;
-Checking that all the pipes, systems and equipments are in conformity
with the Project documentation;
-Preparation of Hydro test packs Dossiers, specified check lists and
punch lists;
-Supervision of Pipes hydro tests, Nitrogen inertisation and leak tests
for all the systems performed by constructors' personnel;
-Performing of the test run for the new installed pumps;
-Preparing of Ready for Commissioning Dossiers;
-Preparing of Startup Procedures for new installed equipments/systems:
Flare KOD System, Open Drain System, Closed Drain System and Flare Low
Point Blow Case System.
April - May 2007
Romania, S.C. Petroconsult SRL
Position: Process Training Supervisor
Type of Plant: Fluid Catalyst Cracking
Performing Class training and On the Job Training for a Vietnamese Team
at FCC Unit from Petrotel-Lukoil Refinery Ploiesti.
November 2006 - January 2007
Algeria, New Natural Gas Compression Station from Tin Fouye-Tabankort and
the extensions of the existents Compression Stations from Rhourde Nouss,
Zina, Ouargla and Hassi R'Mel.
Constructor: SARPI. Client: SONATRAC.
Position: Process Commissioning Engineer, ABB Process Solutions &
Services Sp A
Type of Plant: Natural Gas Compression Station (ABB License) which
consists of:
. Two Turbo generators (SOLAR)
. Two Turbo compressors (NUOVO PIGNONE)
. Natural Gas Filters
. Fuel gas system (TORMENE)
. Air utility system
. Water utility system and Fire water system
. Waste water system
My activity consists of:
-Verifying of all the Project documentation;
-Checking that all the pipes, systems and equipments are in conformity
with the Project documentation;
-Performing of Nitrogen inertisation and leak tests for all the systems
together with the constructor personnel;
-Testing of DCS and ESD;
-Putting in service of systems and equipments together with vendors.
August 2005 - September 2006
Nigeria, NNPC, Warri Refinery, FCC Unit
Position: Technician Back-up Operators
Type of Plant: Fluid Catalyst Cracking (KELOGG License) which consists
of:
. Converter System (reactor and regenerator)
. Main Fractionation (fractionation column, top receiver, air coolers,
water coolers, heat exchangers, furnace, separators, steam generator,
centrifugal pumps)
. CO Boiler (high pressure steam, with two fans driven by steam turbine and
with fuel gas and liquid fuel burners)
. Air Blower (Nuovo Pignone, driven by steam turbine)
. Gas Compressor (Nuovo Pignone, two stages, driven by steam turbine)
. Vapors Recovery Unit (two absorptions column, stripper, re-boiler,
separators, air coolers, heat exchangers, centrifugal pumps)
. Gasoline and LPG Fractionation System (debutanizer and depropanizer
columns, receivers, top receivers, air coolers, water coolers, re-
boilers, centrifugal pumps)
. Absorption with Mono-ethanol-amine and Amine Regeneration System (two
absorption columns for LPG and for fuel gas, amine regeneration column,
amine-LPG separators, top receiver, air coolers, re-boilers, pumps)
. Merox LPG (pre-washing with caustic soda column, extraction with caustic
soda column, LPG-soda separator, filter with sand, caustic soda
regeneration system, caustic soda reciprocating circulation pumps)
. Merox gasoline (mixing column, caustic soda - gasoline separator, filter
with sand, caustic soda circulation pumps)
. LPG vaporization system for fuel gas refinery system
My activity consists of:
-Participating at the start-up, normal shut-down and emergency shut-down
of the plant in safe conditions;
-Checking and maintaining of the parameters in normal limits of
functioning in order to obtain quality products;
-Checking all the dynamic equipment running and stand-by;
-Executing the orders received from the Plant Superintendent and
informing him about all the problems occurred during the equipments
performance;
-Supporting of Plant Superintendent and Chief Operators in technical
problems;
-Cooperation relationships with the sectors involved in the activity of
maintenance.
1999-2005
Romania, S.C. Petrotel - Lukoil S.A. Ploiesti -FCC Unit
Position: Plant Superintendent
Type of Plant: Gas Concentration-Merox-Gas fractionation from Fluid
Catalyst Cracking (UOP License) which consists of:
. Gas compressor (Hitachi, two stages, driven by electric driver)
. Gas Concentration (two absorption columns, stripper, re-boiler,
separators, air coolers, water coolers, heat exchangers, centrifugal
pumps)
. UOP Merox LPG (absorption column with amine, pre-washing with caustic
soda column, extraction with caustic soda column, LPG-soda separator,
filter with sand, soda regeneration system, reciprocating soda
circulation pumps)
. UOP Merox gasoline (mixing column, soda-gasoline separator, filter with
sand, soda circulations pumps)
. Gas fractionation (debutanizer, depropanizer and dryer columns, propane-
propylene splitter, air coolers, top receivers, re-boilers, water coolers
and condensators, centrifugal pumps)
My activity consists of:
-Elaboration of the Operation Manual, Procedures, Instructions,
Applications;
-Coordinating production activities, making the unit material balance -
sheet, checking and maintaining of the parameters in normal limits of
functioning in order to obtain quality products;
-Coordinating the start-up, shut-down and emergency shut-down of the
plant in safe conditions;
-Checking of the supplies of raw materials, products, merox-catalyst,
chemicals;
-Responsible with the staff instruction about labor protection, checking
and maintaining of the safety endowments in good shape;
-Cooperation/coordonation relationships with the sectors involved in the
production activity and maintenance;
-Taking part at the technological changes brought to the plant. I was
involved in DCS Implementation (Emerson License). The Units was revamped
in 2004;
-Being part of board for interviews and employment, performing training
and mentoring of Chief/DCS / Field Operators;
-Coordination with the designers or with the catalyst suppliers in order
to obtain superior qualities and efficiencies of the products;
-Taking part at performance tests of the plant;
-Optimization the consumption utilities and catalyst.
1998 -1999
Romania, SC Petrotel - Lukoil SA - Alkylating Plant.
Position: Plant Superintendent
Type of Plant: Alkylating with Hydro-Fluoric Acid Plant (UOP License)
which consists of:
. Preparation of Row Material System (super-fractionation column for C4 cut
and drying of the top cut)
. Reaction System (reactor, separation column, tank with fresh HF,
circulation pumps, fresh acid pumps)
. Acid Regeneration System
. Fractionation System (iso-stripper column, fractionations columns, top
receivers, separators, air cooler, water coolers, heat exchangers,
furnace, re-boilers, pumps)
. De-acidification System for all the products and for residual gases
My activity consists of:
-Elaboration of the Operation Manual, Procedures, Instructions,
Applications;
-Responsible with the staff instruction about labor protection, checking
and maintaining of the safety endowments in good shape;
-Cooperation/coordination relationships with the sectors involved in the
activity of revamping and maintenance.
1994-1998
Romania, S.C Petrotel - Lukoil S.A. - Propane De-asphalting Plant
Position: Process Engineer
Type of Plant: Propane De-asphalting Plant (IPIP Romania License) which
consists of:
. Extraction of oil with liquid propane
. Oil-propane Separation System
. Asphalt-propane Separation System
. Propane recovery and liquefying using a reciprocating compressor in two
steps
. Propane treatment with mono-ethanol-amine
My activity consists of:
-Elaboration of the procedures, instructions, applications;
-Making the unit material balance - sheet, checking and maintaining of
the parameters in normal limits of functioning in order to obtain quality
products;
-Checking of the supplies of row materials;
-Registering the results of laboratory samples;
-Participating at the start-up, normal shut-down and emergency shut-down
of the plant in safe conditions;
-Cooperation relationships with the sectors involved in the activity of
production and maintenance;
-Optimization of the consumption utilities.
1993-1994
Romania, S.C Petrotel - Lukoil S.A. - Propane De-asphalting Plant
Position: Control Room Operator
I participated to pre-commissioning tests and to the first start up of
the Propane De-asphalting Plant.
My activity consists of:
-Participating at the start-up, normal shut-down and emergency shut-down
of the plant in safe conditions;
-Checking and maintaining of the parameters in normal limits of
functioning in order to obtain quality products;
-Checking the supplies of raw materials, products;
-Executing the orders received from the foreman and informing him about
all the issues occurred during the equipments performance;
-Cooperation relationships with the sectors involved in the activity of
production and maintenance.
1985-1993
Romania, UZTEL Ploiesti - Oxygen Factory
Position: Panel Operator
My activity consists of:
-Checking and maintaining of the parameters in normal limits of
functioning in order to obtain quality products;
-Start-up, normal shut-down and emergency shut-down of the plant in safe
conditions;
-Executing the orders received from the foreman and informing him about
all the issues occurred during the equipments performance;
-Cooperation relationships with the sectors involved in the activity of
production and maintenance.