ALI TAHA AL-NASERI
**** ******* *******, ***********, **
647-***-**** • *********@*****.***
ca.linkedin.com/pub/ali-taha-al-naseri/19/b82/2b/
Design and Project Coordinator in Oakville, ON
Highlights of Qualifications and Essential Skills
• B.Sc. Architectural Engineering. International experience with high profile companies.
• Over 15 years of comprehensive architectural design and engineering experience in different
regions around the world (Middle East and Far East).
• Architectural / Engineering interdisciplinary.
• Constructed one project with 2 Pearl Green building – equivalent to Silver LEED rating.
• Experienced with green buildings and sustainable design and construction requirements.
• Proficient in AutoCAD 2D and 3D (Architectural desktop), and 3D Sketch-up.
• Microsoft office: Word, Excel and Power point-Fluent. Microsoft project planner - good.
• Proficient in Adobe Photoshop, Page maker and Illustrator.
• Experienced with Primavera and Aconex project controlling documents.
• Confirmed leadership, communication, presentation, and analytical skills.
• Detail oriented and able to work under pressure to meet tight deadlines.
• Conducted courses for AutoCAD and Adobe Photoshop for Projacs - Abu Dhabi 2008 - 2010.
• Organized the design and presentation for a Competition of showroom design in 2003.
• Won the competition to design Nottingham University in Kuala Lumpur - 2000.
• Established a descriptive painting for the transforming tunnel in Adhaim dam project
published for Baghdad International Fair size 3.00 X 0.90 M (1994-1995)
EXPERIENCE RECORD
JLA International Engineering JV. with WSP - Abu Dhabi – U.A.E. 2011 to 2013
Position: Resident Engineer – Architect
Project: Construction of 448 Villas in Sila’a – West region (USD 185M) the project included 2
construction types for Villas (Conventional and Pre-cast). 2 Pearl Green building – equivalent to
Silver LEED rating.
• Led design and supervision team to ensure that contractor was fulfilled with quality control
plan of the project.
• Reviewed and approved all architectural and civil submittals with full coordination with all
disciplines.
• Implemented staff appraisals as part of career development for employee’s performance in
relation to organizational criteria and objectives.
• Prompt responded on all RFI's and proposed solutions on technical issues influencing design.
• Attended project coordination and owner/contractor/architect/engineer meetings as
scheduled.
• Kept daily log of job site progress, conditions, concerns, submittals logs, and keep healthy
environment to deal with Staff.
• Achievements: Handled both Managerial position as resident engineer and technical position
as project Architect with perfect and appreciated performance.
• Reviewed about extra 1200 shop drawings related to the conflict between the design
drawings and site condition and saved at least six months of construction period with no cost
impact to the client.
Page 1 of 3
Ali Taha Al-Naseri 647-***-**** *********@*****.***
Abu Dhabi General Services ( Musanada ) 2010 to 2011
Position: Design manager – Design and Development - Buildings services
• Managed and reviewed all consultants’ submittals of projects from design stages till tender
stage, in line with time schedule, project budget, RFP and client’s requirements.
• Verified compliance with the city design guidelines (for Architectural, Interior design and
Landscape packages) in full coordination with other disciplines.
• Reviewed and enhanced projects facades details and specifications for the main projects:
curtain walls, cladding facades and other special elevations features.
• Followed up with the consultants to enhance the designs for optimum budget for the project.
List of projects handled:
• Equestrian club project – Abu Dhabi. RW Armstrong (USD 110M).
• Academy of Judicial studies – Abu Dhabi. ECCO Engineers (2B+G+14).
• National rehabilitation centre – Abu Dhabi. HKS Architects.
• Proposed design alternatives for Teachers housing for ADEC - west region – Abu Dhabi.
• Several housing projects for Emirati citizens – Abu Dhabi.
Commodore contracting company-Abu Dhabi 2009 to 2010
Position : Project technical coordinator
Project : IPIC Headquarter project -Abu Dhabi . 2B+G+M+35 office tower and facilities building
(USD 235M)
• Directed technical team to produce shop drawings, issued RFI’s, transmitted submittals.
• Full coordination with all disciplines and issued the consolidated and coordinated drawings for
the project – from the project started till the finished 20th floor.
• Directed all subcontractors and suppliers technical submittals complying with project details.
CAP Emirates Architects- Abu Dhabi 2008 to 2009
Position: Projects Manager
• Led architectural and engineering team for the preparation of complete design package for all
deliverables, submissions, and disciplines coordination.
• Directed all submittals required for authority approvals for the handled projects.
• Administrated the cost control study and time schedule outline and figured out expectations.
List of projects handled:
• Apex complex in Abu Dhabi exhibitions center: (4B+G+M+24) two towers (Hotel tower +
Office tower). G.F.A. 54,958 sq.M. - B.U.A.84,000 sq.M (USD 115M)
• ADTC extension (JV with PTW Architects): (4B+G+4P+26) two towers (Serviced apartment
tower + Office tower). G.F.A. 70,000 sq.M. - B.U.A. 125,000 sq.M (USD 215M).
Hill International (Overseas) Ltd. Abu Dhabi 2004 to 2008
Position: Senior architect - Project management and Supervision
• Managed and reviewed all developers and consultants’ deliverables and verify compliance
with master planning criteria (Plat plans, density matrix and utility matrix) and design
regulations.
Page 2 of 3
Ali Taha Al-Naseri 647-***-**** *********@*****.***
• Reviewed and approved contractors’ materials submittals and shop drawings in compliance
with contract documents and drawings as well as local construction regulations.
• Experienced with a wide variety of finishing materials: granite floors, granite wall cladding,
curtain walls, aluminum cladding elevations, glazed roof and skylight, roll carpet floors, raised
floors, epoxy paintings, review the interior design and supervising F.F.&E.
• Reviewed and settled all contractors’ claims for variations and extensions of time.
List of some projects handled:
1. Shams project - Al REEM Island development (JV with QPI) Abu Dhabi - Gateway project (75
floors tower), Central Park (8.3 ha) and Third party developers’ coordination team for Sorouh
real estate (lead prestigious real state).
2. Capital towers project – Dubai, contains: 35 floors five star hotel building with full public
facilities. And 40 floors office building.
3. (G+3) New library for Petroleum Institute - Abu Dhabi(USD 28M)15000 M2
4. Habshan residential project for GASCO ( USD 30M ), F.F.& E. (USD 3M).
Al Falasi & Partners Architects and Engineers. DUBAI 2001 to 2004
Position: Chief Architect
• Led architectural and engineering team for the preparation of complete design package for all
deliverables, submissions, and disciplines coordination.
• Directed all submittals required for authority approvals for the handled projects.
• Experience with Dubai municipality and media free zone regulations.
• Organized the design and presentation for a Competition of showroom design in 2003.
List of projects handled:
• 3B+G+M+23 Commercial Podium and Residential tower -Dubai (35000 sq.M.). Land mark
complex.
• Several projects of commercial villas in Dubai.
• B + G + 14 Residential building in Media free zone.
• B + G + 5 Commercial & residential building in Port Saeed-Dubai (51 500 ft2.)
• Bridgestone Showroom in Sheikh Zayed road - Al Qoz 3rd - Dubai (115,000 ft2)
Kumpulan Akitek SDN BHD – Kuala Lumpur, Malaysia 1997 to 2001
Position: Design Architect
• Led design and technical team for Wisma Putra project (Ministry of Foreign Affairs) -USD 40M.
• Awarded Competition for Design of Nottingham University- 2000 (USD 60M).
• Led design team for DPMM H.Q. project in Kuala Lumpur (Office building).
• Several Residential Projects in Kuala Lumpur.
FAO General Establishment –Iraq 1990 to 1997
Project Architect / Planning and Technical Supervision Engineer
• Design Construction Methods and Proposals for Concrete Works in the diverting tunnel.
• Construction of 11 Blocks of Industrial Complex and Administration building at Taji-Baghdad
(M80 USD).
Portfolio and references Available upon request
Page 3 of 3