PRADEEP DAULATRAO DESAI
SONIGARA CLASSIC, 'B' Wing, Flat no. 27, Ekata Nagar, Akurdi, Pune -
411035, Maharashtra.
Ph:957-***-****, 830-***-****; Email: *******.*****.****@*****.***,
************@*****.**.**
[pic]
ENGINEERING PROFESSIONAL - design
Offering 10 Yrs. of experience; seeking challenging assignments Oil & Gas
industry and Chemical Industry.
[pic]
SUMMARY OF SKILLS
< Familiar with Equipment design calculations in PV Elite software.
< Familiar with Equipment design calculations in Microprotol software.
< Familiar with Storage tank (API 650) design calculations in Excel sheet.
< Proficiency in checking GA & Detail Drawings.
< Familiar with ASME Sec VIII Div 1 & Div 2.
< Familiar with ASME, ASTM, API 650.
< Familiar with IS 875 code for wind calculation.
< Familiar with IS 1893 code for seismic calculation.
< Familiar with ASME sec II for material specification.
< Familiar with EIL, Toyo, Saudi Armco, UOP, ONGC, Flour and Firecon
standard.
[pic]
PROFESSIONAL EXPERIENCE
1 NEILSOFT LIMITED, PUNE.
AUG 11 - WORKING
DESIGN ENGINEER
Working in Mechanical Static Design Department in IPP Group and have
experiences related to Designing of Storage Tanks as per API 650 and
Designing of Pressure Vessels as per ASME Sec VIII Div. 1.
PROJECTS:-
1) Extended Basic Engineering for Lube Oil Additives Plant, Lanxess India.
We are handling total 30 Nos. of Mechanical Static equipments. We are
doing Engineering for this project. Process Engineering is done by
Triplan, Germany. We are doing design of Static equipments like Pressure
Vessels, Storage tanks, Reactor, Heat Exchangers and Filters.
Equipment's Handled:
1) Reactors : 2 Nos.
2) Pressure Vessels : 20 Nos.
3) Storage Tank : 2 Nos.
4) Filters : 4 Nos.
< Preparation of Mechanical Design Basis.
< Preparation of Technical specifications for Pressure Vessel, Storage
tank, Reactor and Column.
< Design strength calculation for Pressure Vessel, Reactor, Column and
Storage tank as per ASME and API Code.
< Preparation of Mechanical data sheets and GA Drawings as per Process data
sheet and design calculation.
< Coordination with inter departments for required inputs.
< Preparation of Material requisition.
< Evaluation of vendor offers.
< Preparation of Tender bid evaluation
< Vendor print review.
2) Viscose Staple Fiber Plant at Patalganga, Maharastra. (LENZING MODI
FIBER INDIA PVT. LTD).
Equipment's Handled:
1) Storage Tank : 9 Nos.
< Design & Engineering: Static equipment design calculation of Storage
Tanks as per international codes API 650 in excel sheet and designing
of vessel in PV Elite.
< Preparation of Mechanical datasheets based on process data sheets and
Design calculation. Submit MDS for customer approval.
< Coordinate with draftsman for Tank and Vessel GA Drawing.
< Co-ordinate with inter Departments like Process, piping and Structural.
< Submit Tank and Vessel GA Drawing for Customer Approval.
< Preparation of Material requisition of Tank and Vessel for Customer
approval.
3) LanXess, Nagada
Equipment's Handled:
1) Heat Exchangers : 12 Nos.
< Preparation of Material requisition of Heat Exchanger for vendor
offer.
< Check vendor offer and prepare TBA.
< After placement of order review vendor drawings and design
calculation.
< Give approval on vendor drawings.
< Coordinating activities with Customers, Equipment vendors etc. for
resolving technical issues.
[pic]
PL ENGINEERNG, LIMITED (A PUNJ LLOYD COMPANY) GURGAON
NOV 07 - JULY 11
DESIGN ENGINEER
Working in Mechanical Static Department and have experience of jobs
related to Designing and Detailed Engineering which include Preparation
of Mechanical Data Sheets, Material Requisition, Vendor offer review,
Prepare Technical Queries related vendor offer, Prepare Technical Bid
Analysis, Prepare Purchase requisition, Review Vendor Drawings etc. for
Mechanical Static Equipments such as Pressure Vessels, Columns, Heat
Exchangers, Storage tanks & Filters etc.
< Design & Engineering: Static equipment design including Vessels, Heat
Exchangers, Columns, Storage Tanks, Filters etc. as per national /
international codes ASME, DIN.
< Preparation of Material requisition & Material Take Off for vendor
offer.
< Prepare TBA for vendor offers.
< Prepare PR after placement of order.
< Preparation of Mechanical datasheets based on process data sheets,
Design basis, Job specification, Applicable standards and applicable
P&ID.
< Review the vendor drawings as per PR.
< Resolution of technical issues with Client and vendors.
< Project Coordinating activities with Clients, Customers, Equipment
vendors etc,
< Experience in pre-bid engineering of Static Equipment like Man-hour
estimation, Preparation of MR and Evaluate Vendor offer.
PROJECTS:-
1) SRU BINA:- In this Project I have done Basket Filter, Cartridge Filter
& Carbon Filter.
< Prepare Filters Mechanical data sheets.
< Prepare Technical part of Material Requisition (MR)
< Technical review and evaluation of Vendors bids.
< Prepare the Purchase requisition after acceptance of successful
Vendor/Bidder.
< Review and approve vendor document as per relevant Job Specifications,
applicable codes and standards.
< Coordinate with other Engineering disciplines for any mechanical
engineering inputs for other discipline engineering works.
< Provide engineering support as and when required for site
construction/erection works.
2) DCU :- In this project I have handled Vessels.
< Design of Pressure Vessels on PVELITE software.
< Prepare Equipment Mechanical data sheets.
< Prepare Technical part of Material Requisition (MR)
< Technical review and evaluation of Vendors bids.
< Co-ordinate with inter department for vendor drawing review.
3) Moto sprit quality up-gradation BARAUNI :- In this project I have
handled Vessels.
< Design of Pressure Vessels on PVELITE software.
< Prepare Equipment Mechanical data sheets.
< Prepare Technical part of Material Requisition (MR)
< Technical review and evaluation of Vendors bids.
< Co-ordinate with inter department for vendor drawing review.
PROPOSALS:
< Prepare deliverable list for static equipments.
< Prepare Pre-bid and Post-bid man hour estimation.
< Design the Pressure vessels on PVELITE & Heat exchangers on
MICROPROTOL.
< Co-ordinate with inter discipline like Process, Piping &
Instrumentation.
< Prepare MR's & MTO's for static deliverables.
< Review the vendor offer.
1) Dragon Oil 2) Msq Barauni 3) Strategic Gas Transmission Project 4)
Manifa Pipeline Saudi Arabia 5) Oil Terminal Hamriah Free Zone
Sharjah 6) Guru Gobind Singh Refinery (Hydrogen Generation Unit) 7) Bhogat
Gas Terminal 8) Habshan Flare Recovery Project 9) Hpcl Pipeline (Raman
Mandi To Bhathinda & Raman Mandi To Bahadurgarh) 10) Strategic Storage Of
Crude Oil Project 11) Dragon Oil Platform Replacement 12) Sweet Fuel Gas
Supply To Dukhan Consumers 13) North Tapti Gas Field Devalopment (Off-
Shore) 14) Polysilicon Haldia 15) B-22 (Platform) Off-Shore 16)
Propane/Butane/Lpg Import Export Terminal 17) Rewais Sulphur Expansion
Project 18) YANBU Export refinery project, Saudi Arebia.
In above proposals I have done following Equipments.
< Pressure vessels design in PVELITE more than 20 Nos.
< Heat Exchangers design in Microprotol more than 10 Nos.
< Sphere design in PVELITE, 3 Nos. as per ASME Sec VIII Div-2.
< Filters, More than 10 Nos.
< Columns design in PVELITE, 5 Nos.
[pic]
THERMAX LTD, PUNE (ENVIRO DIVISION)
APRIL 03 - OCT 07
DESIGN ENGINEER
Design of Bag filters as per Order Data sheet. Prepare G.A. Drawing for
customer approval. After getting approval from customer release the detail
(Manufacturing) drawings as per scope of supply. Those detail drawings in
customer scope these drawings submit to customer for their manufacturing
action & those drawings in Thermax scope these detail drawings release for
manufacturing action.
< Prepare Part Catalogs for Filter Bags.
< Prepare Part Catalogs for I. D. fans.
< Review the Fan vendor drawings as per project specification & Part
Catalog.
< Prepare drawings like cage, venturi as per filter element.
< Prepare GA drawing of Bag filter for Customer approval. After getting
approval from Customer prepare detail drawing.
< Release the GA drawing & Detail drawings for manufacturing.
< Prepare spark arrestor drawing for Boiler bagfilter.
< Calculate the Dead load & Wind load.
< Design the Support structure (Leg) on Staad-pro by using dead load &
wind load.
< Prepare P & ID for Bagfilter with all accessories & Instruments.
[pic]
EDUCATIONAL & PROFESSIONAL DEVELOPMENTS
Indian Institution of Industrial Engineering (BE), Undergoing from 2009
Board Mumbai
PG Diploma in Boiler & Process Equipment Design, 2007
VIT Pune
DME, 2002
Government Polytechnic, Belgaum, Board Bangalore
Class X, 1996
Hirnyakeshi Vidhyalay, Ningudage, Tal: Ajara, Dist: Kolhapur, Board Pune
COMPUTER KNOWLEDGE
< PVELITE-2008
< Microprotol
< AutoCAD
< Knowledge of other software like, Microsoft Excel & Word.
< SAP in MM
[pic]
Date of Birth: Jan 31, 1980 References:
Available on request.
Passport No.: J1387771 Date of
Expiry : 01/08/2020