Post Job Free
Sign in

Project Construction

Location:
United Kingdom
Salary:
5000 USD
Posted:
April 20, 2013

Contact this candidate

Resume:

Name / Surname Nichita Liviu

Address (s) Suceava 8, Bl U2 Sc.A, Ap.11, Constanta, Romania

Phone (-lion) Mobile: 004**********

E-mail (s) *******@*****.***

Nationality (es) Romanian

Date of birth 14 July 1967

Male

Skype ID: liviu.nichita

Desired employment / Occupational field : Senior Quality Engineer

Quality Engineer - Quality Department

Professional Experience

My background is specified in the Letter Request, along with Cover Letter

and Annex 1, accompany my CV

01 / 2012 - present

Industrial Quality Engineer - Quality Assurance & Quality Control Engineer

- Technical Director

Quality Assurance Department

Company Name : Sc. Rom Coman SRL

Alimanu village, Constanta County, Romania

This company execute:

- Infrastructure construction projects and design (industrial, urban and

utilities) in the construction of pipelines (Oil & Gas and Water)

-Infrastructure projects for roads, highways and railways

- Projects construction / reconstruction, repairs and upgrades to

buildings, houses, villas, hotels, historical monuments, parks and gardens

of the city.

- Projects irrigation for agricultural crops and orchards parks

I am technical coordinator of the project and I following main

responsibilities:

- Monitoring and verification of software production, suborder list, QC

inspection & delivery.

- Checking and inspection of welded joints quality during technological

process and results control visual examination work in progress and

effective supervision of repair procedures;

- Checking and inspection of welds, so they should be performed in

accordance with procedures;

- Ensure that all welding operations are executed in accordance with all

relevant codes of practice (ASME Code, V, VIII, IX, B31.1, B31.3, AWS D1.1,

Section) and company procedures / practices

The main projects that my team is currently working in this company are:

(ANEXA 1 )

"Replacing the oil pipelines from Depository section Tanks - Park crude -

to oil terminal in Constanta Port ' - Oil & Gas Project

"Restoration of the Mausoleum of Adamclisi and performing works of

antique landscape architecture, artisanal, typical tourist area .

Drilling, collecting, pumping, transmission and distribution systems

water jets and fountains pipelines" - System Water Pipeline Project

For this project I coordinate system industrial

performance for pipeline irrigation, varieties construction of

landscaping,construction of roads paved with stone.

I lead, I organize and coordinate construction sites

workers (35-70) for the construction of houses pumps water pipes, water

supply in tourist areas, civil engineering for water collection tanks made

of concrete and / or metal, development of fish ponds, bridges and

culverts access placed in / on artificial islands off the tourist lakes or

in the sea, projects construction of marine pontoons .

I coordinate civil works for the restoration and

rehabilitation of historic monuments, their stone and marble tiling, teams

of engineers design for parks, teams of workers to artificial planting

works, teams of workers for work of irrigation sprinkler systems in areas

easily accessible / inaccessible water and building water wells with

special effects.

1. "Modernization and repair of roads and railways in Constanta Port .

Rebuilding and modernization of Railways Goods and Commodity Station of

Constanta Port Connections of the sewage pipes from the storage tank .

" - Infrastructural, Steel or Metal Construction Project and Buildings

2. "Construction of Cargo train station building from the oil terminal Sc.

Oil Terminal SA and extension of the railway to port platform" -

Infrastructural, Steel or Metal Construction Project and Buildings

5 . "Cranes to transport iron ore from the warehouse to the port

terminal" - Infrastructural Steel or Metal Construction Project for

Constanta Shipyard Romania

I watched and I organized execution on site in terms of quantity, quality,

and compliance deadlines;

I checked the execution plans and I proposed constructive solutions to

resolve nonconformities identified and technologies;

I studied design details and technical documentation necessary for

construction

For each building individually, I draw up the building;

I have prepared and / or checked attachments, statements of work, work

reports, minutes and other documentation technical nature;

I watched as the supply of materials ordered to make timely and quality

checked existing documents;

I learned and I've seeks enforcement of legislation, technical working

procedures and instructions.

3/2007 - 05/2012

Quality Engineer Specialist - Contract Manager

Quality & Welding Control Department

Company Name : Sc. Sigmaluby SRL

Str. Port Agigea Sud, Constanta, Romania

This company execute:

- Infrastructure construction projects and design (industrial, urban and

utilities) in the construction of Water pipelines

- Civil and industrial construction, construction of bridges and houses.

-Projects construction / reconstruction, repairs and upgrades to buildings,

houses, villas, hotels

-Controlling, Supervising and Managing in Heavy Civils

- Structural Construction Infrastructures - Bridges, Roads & Highways

- drainage, structures and earthworks

I worked full compliance with ASME, TS 16949, APQP, PPAP, FMEA, API, ASME,

GOST, NFPA, NACE

I coordinated the implementation of ISO 9002 Quality System

I checked works the construction, welding drawings and welding control

daily .

In all executions of projects has been taken into

account:

-Preparing project specifications.

-Performing the necessary engineering calculations to ensure safe practice.

-Ensuring health & safety issues are resolved.

-Liaison with Field and Inspection personnel.

-Evaluation of defects and selection of proper repair techniques.

- Experienced in developing and upgrading Stick, GMAW, GTAW, PTAW, and Arc

welding procedures to be used by production personnel.

- Familiarity with : API 611, API 612, API 1117, ASTM, ASME Section

VIII, IX codes

- Familiarity with : TS 16949, APQP, PPAP, FMEA

- Familiarity with : PCN Rad Interpretation

-To participate in evaluation of CFT documents for SURF contract in the

flexible pipeline discipline.

-To prepare input to the weekly report for the flexible pipeline

discipline.

- To work in compliance with C150/95 (Norms related to quality of steel

welded joints for civil, industrial and agricultural construction), SREN

25817/93 (Arc welded joint in steel), STAS 767/0 - 88 (Steel construction.

General technical quality condition.)

I watched the welding procedures, welding and control

QC department works required for large pipe-lay, HDD (pull line) and DLS

jacket for construction projects. ( OIL & GAS PROJECTS )

" Dzhubga - Lazarevskoye - Sochi gas pipeline " is part of the program

for the construction of Olympic facilities in Sochi Development

The total length of the pipeline is 177 kilometers,

including the larg.Traseul 159.5 km pipeline running under the Black Sea

from the coast (about 4.5 km from the coast), the natural gas distribution

station near Kudepsta Soci.24 inch pipeline will have an annual capacity of

approximately 3.8 billion cubic meters flow.

In early 2009, the company Melrose Resources has initiated a development

program to convert the

"Galata platform to spring from Kavarna 2, Bulgaria " broad field to a

gas storage facility

For these projects, I had responsibilities of organizing work teams and

tracking of work measured by the time, the use of resources and quality .

Romanian Company was awarded the contract for engineering, procurement,

fabrication, transportation, installation and testing offshore pipeline 8.5

km x 6 "Galata platform to spring from Kavarna 2, and 14.5 km x 10" Galata

platform to spring from Kaliakra 2, with associated piggyback liquid lines.

"Komarom gas pipeline " is part of the program for the construction of

Mol Company Development

The total length of the pipeline is 127 kilometers,

including the natural gas distribution station near Budapest .24 inch

pipeline .

For these projects, I had responsibilities of organizing work teams and

tracking of work measured by the time, the use of resources and quality .

Romanian Company was awarded the contract for engineering, procurement,

fabrication, transportation, installation and testing pipeline 6,5 km x 6

" and 18.5 km x 10" .

Main projects that I attended with my team were (ANEXA 1 )

"Works for replacement the railways of tram with the introduction of

new railways and arrangement for the construction at Central Park

Constanta" - Infrastructural Construction Project

" To sweat separators welding works for power station with coal in

RECEL Romania Hot water piping system . " - Resources Natural Energy

Construction Project

"Sun Highway -Constanta - Bucharest Romania - Sector sea -channel

crossing parallel with Sluice . Related works rainwater drainage,

modification and thoroughfare diversion of water pipe, irrigation

canal repair." - Infrastructural & Utility Construction Project and

Steel or Metal Construction Project

"Building, Construction & Installation of gas stations in RO-RO

terminal Agigea South Port container" - Oil & Gas Construction

Project and Steel or Metal Construction Project and Buildings

Main responsibilities:

* I was involved in company management system to provide resource

management to handle administrative matters such as staff costs and

training.

* I have conducted quality audits, both as PMC and EPC contractor

management systems to check the implementation of quality standards and

quality control practices.

* I have led a team of project control engineers, planners, and control of

documents, qualified to analyze and evaluate project costs and performance

against a set schedule with critical milestones. * I have led a team of

engineers specialized in industrial buildings to meet the control

requirements of the project.

* The projects executed, development, management and execution of all

phases of project controls (planning / scheduling and cost analysis), were

important elements which I have reported directly to the Program Manager.

* I participated with a team of experts, engineers and analysts responsible

for the development, management and execution of all phases of the project.

* I have responded directly against the beneficiary of all controls effort

(planning / scheduling, cost, document management and control).

* I always gave statistical reports based on all beneficiaries or clients,

I organized and participated in regular meetings in which I present the

project milestones achievements.

* I prepared status reports, I supervised the preparation of monthly

reports and progress in work on major and intermediate stages of the

project

* I have led technical department who is qualified to examine and evaluate

project costs and performance against an established program, with its

critical stages.

* I managed impact on building design, program changes and deviations,

inconsistencies arise from external factors not calculated.

* I have watched customization project control systems and document control

system to meet specific project requirements ..

I am technical coordinator of the project and I following main

responsibilities:

- checking and quality inspecting welded joints during technical process

and control results; examining visually work in progress and effectively

supervising repair procedures;

- checking and inspecting welds so as they should be performed in

compliance with applicable procedures;

- ensuring that all Welding operations are executed in accordance with all

relevant Codes of Practices (ASME Code,V, VIII, IX Section, AWS) and

Company procedures/practices;

- handling all welding technical queries and investigating all field

welding related problems;

- liaising between the Client Inspection Department on all aspects of

Welding, Heat Treatment, Hardness Testing and Non-Destructive Testing;

- checking the validity of welders' authorizations for welds.

01/2001 - 03/2007

Quality Assurance & Control Engineer Specialist - Technical Contract

Manager

Company Name : Sc. Magic Oil Ltd - Constanta Branch - Romania

Subsidiary Magic Oil Varna - Bulgarien

Company active in the market, aimed at business-selling price of petroleum

products and lubricants, but also have other activities such as

construction of small tanks of diesel and gasoline, with teams of welders

qualified for such work.

This company execute:

- Infrastructure construction projects and design (industrial, urban and

utilities) in the construction of pipelines (Oil & Gas and Water)

- Civil and industrial construction, repair oil tanks and oil pipelines,

construction of bridges and houses.

- Structural Construction Infrastructures - Bridges, Roads & Highways

In all executions of projects has been taken into

account:

-Preparing project specifications.

-Performing the necessary engineering calculations to ensure safe practice.

-Ensuring health & safety issues are resolved.

-Liaison with Field and Inspection personnel.

-Evaluation of defects and selection of proper repair techniques.

- Experienced in developing and upgrading Stick, GMAW, GTAW, PTAW, and Arc

welding procedures to be used by production personnel.

- Familiarity with : API 611, API 612, API 1117, ASTM, ASME Section

VIII, IX codes

- Familiarity with : TS 16949, APQP, PPAP, FMEA

- Familiarity with : PCN Rad Interpretation

-To participate in evaluation of CFT documents for SURF contract in the

flexible pipeline discipline.

-To prepare input to the weekly report for the flexible pipeline

discipline.

- To work in compliance with C150/95 (Norms related to quality of steel

welded joints for civil, industrial and agricultural construction), SREN

25817/93 (Arc welded joint in steel), STAS 767/0 - 88 (Steel construction.

General technical quality condition.)

Main projects that I attended with my team were (ANEXA 1)

"Field System Pipeline In The Terminal Of SC. OIL TERMINAL SA

Refinery" - Oil & Gas Construction Project

Pipeline project, 6'' and 20'',

Pipeline project 6'' and 10''

The total length of the oil & gas pipeline is 125 kilometers

1. "Construction of metal road bridges - Maria Bridge Section 1 -

pillars " - Steel or Metal Construction Project

2. "Residential villas and motels - earthworks, building works shores,

bridges, roads, and utilities system water pipelines in Arad Town,

Ramnicu Valcea Town and Ploiesti Town of Romania and Varna Town of

Bulgaria . " - Buildings Construction Project

"Works for replacement the railways of tram with the introduction of

new railways of Constanta Port" - Infrastructural Steel or Metal

Construction Project

3. " Field System Pipeline In The Terminal Port SC. ROMPETROL SA Oil &

Gas Refinery Midia Navodari Kazakhmunay Gaz Romania " - Oil & Gas

Construction Project

Pipeline project, 6'' and 20'',

Pipeline project 6'' and 10''

The total length of the oil & gas pipeline is 77 kilometers

4. "Construction of metal road bridges - Maria Bridge Section 2 -

pillars " - Steel or Metal Construction Project

I had to check quality of work performed by their

employees and subcontractors to execute projects.

I had to check welds according to ASME, ISO 9001, ISO

9002, TS 16949, APQP, PPAP, FMEA.

Responsibilities have included issues such as:

* Monitoring, recording, and change the batch number of products completed

* Distribution of quality documents such as registration process

inspection, etc.

* Maintain all records of inspection and release of non-compliance reports

non-compliance

* Ensure that all approvals for the execution of projects or products have

been inspected properly to control inspection plans / reports.

* Ensure that any additional information requested by internal clients are

properly recorded and were presented in a timely manner (eg, SPC data).

* Ensuring that all destructive tests are performed according to internal

and customer specifications.

* Maintain a clean and tidy workspace.

* As an engineer and manager QA / QC I was responsible for overall project

management and I kept in touch with representatives acting in support of

PMC.

* I have provided reports and project audits

* I have solved any problems QA / QC related when it was necessary

* Ensuring customer quality requirements are met

* Provide effective technical support to the project team on all aspects of

QA / QC

* I monitored, I watched, I coordinated and controlled I QA / QC for the

supply of materials, prefabrication and construction for all phases of

project implementation

* I was responsible for preparing, reviewing and developing quality

management plan contract, inspection and test plans, strategy and overall

quality, in collaboration with the project manager and project managers.

* I was personally responsible for QA / QC (including discipline

inspection, welding and NDT) and check that the right skills and staff to

fulfill their duties on the activity identified in the contract.

* I was responsible for supervising and coordinating the company's plan to

provide inspection and testing at manufacturer's facilities.

* I was involved in company management system to provide resource

management to handle administrative matters such as staff costs and

training.

* I have conducted quality audits, both as PMC and EPC contractor

management systems to check the implementation of quality standards and

quality control practices

10/1998 - 03/2007

Quality Control Center - Technical Branch Manager

Company Name : Sc. Approved Construct SA

Romania Branch - Constanta, Arad

Hungarian Branch - Komarom ( Ungaria )

This company execute:

- Infrastructure construction projects and design (industrial, urban and

utilities) in the construction of pipelines (Oil & Gas and Water)

- Civil and industrial construction, repair oil tanks and oil pipelines,

construction of bridges and houses.

-Projects construction / reconstruction, repairs and upgrades to buildings,

houses, villas, hotels

-Controlling, Supervising and Managing in Heavy Civils

- Structural Construction Infrastructures - Bridges, Roads & Highways

- drainage, structures and earthworks

The main projects were major repair tanks and pipes, replacement of the

floating works of reservoirs, works on fixed roof tanks.

Manufacturing projects were made for large companies in Romania, such as

refineries SC OIL TERMINAL SA and SC. ROMPETROL Midia SA

In all executions of projects has been taken into

account:

-Preparing project specifications.

-Performing the necessary engineering calculations to ensure safe practice.

-Ensuring health & safety issues are resolved.

-Liaison with Field and Inspection personnel.

-Evaluation of defects and selection of proper repair techniques.

- Experienced in developing and upgrading Stick, GMAW, GTAW, PTAW, and Arc

welding procedures to be used by production personnel.

- Familiarity with : API 611, API 612, API 1117, ASTM, ASME Section

VIII, IX codes

- Familiarity with : TS 16949, APQP, PPAP, FMEA

- Familiarity with : PCN Rad Interpretation .

- To work in compliance with C150/95 (Norms related to quality of steel

welded joints for civil, industrial and agricultural construction), SREN

25817/93 (Arc welded joint in steel), STAS 767/0 - 88 (Steel construction.

General technical quality condition.)

Main projects that I attended with my team were: (ANEXA 1)

"Field System Pipeline In The Terminal Of SC. OIL TERMINAL SA Refinery

- Port Constanta . " - Oil & Gas Construction Project

Pipeline project, 6'' and 20'',

Pipeline project 6'' and 10''

The total length of the oil & gas pipeline is 44 kilometers

1. " Field System Pipeline In The Terminal Port SC. ROMPETROL SA Oil &

Gas Refinery Midia Navodari Kazakhmunay Gaz Romania - Terminal Port

Navodari " - Oil & Gas Construction Project

Pipeline project, 6'' and 20'',

Pipeline project 6'' and 10''

The total length of the oil & gas pipeline is 47 kilometers

"The Mary Bridge section 2 - the Danube - Black Sea" -

Infrastructural Steel or Metal Construction Project

" The Construction of coal and coke terminal platform port of

Constanta Port for Sc. Minmetal SA Company Romania ". - Resources

Natural Energy Construction Project

Responsibilities :

*To ensure that flexible pipelines are designed in accordance to

statutory regulations and guidelines

* To control and validate scope of work for the flexible pipeline

discipline in Detail engineering

* To coordinate the mechanical and piping activity with the rest of the

project.

* To respect HSE including work environment rules and ensure that they

are respected at all times, reporting any irregularities.

* To participate in evaluation of CFT documents for SURF contract in the

flexible pipeline discipline.

* To prepare input to the weekly report for the flexible pipeline

discipline.

* Co-ordinate activities with other disciplines.

* To prepare the documentation necessary to implement modification

requests

* Co-ordinate the flexible pipeline studies

*To support Engineering, Procurement, Contracts and Construction

departments in resolving Quality related issues.

*To participate in NDT examinations.

*To report any quality problems to the QA/QC Head and Project

Construction Manager.

*To inspect and check test plans and Follow-up execution of ITP'S.

*In case of any non conformity in construction and pre-commissioning

activities, to report to QA/QC Head and request a Non Conformance

Report.

*Follow-up the clearance of the NCR'S issued.

*To compile the welding books and weld maps per customer requirements.

*To review all welding procedures to assure that they are in compliance

with the customer requirements.

*To coordinate customer review of all welding documents .

* Familiarity with Engineering and Quality practices and procedures

including APQP, PPAP, blueprint reading, GD&T, use of measuring

instruments, checking aids / fixtures, computer applications, mechanical

testing, and customer and ISO-TS 16949 requirements

*To work in compliance with ASME Sec IX 2004 Edition + Addenda, ASME B

31.1 Ed. 2004, ASME B 31.3 Ed. 2002, API 1104 Ed. 2000, API 5L., AWS D1.1

Work areas: Fabshop - Carbon Steel (ASTM 106 Gr. B), Stainless Steel,

LTCS (A333 Gr. 6 to A350 LF2), LTCS NACE Pipes, NACE, Low alloy.

06/1995 - 10/1998

Quality Assurance Engineer - Quality Specialist - Welding Resources

Manager - Quality Technical Manager

Quality Assurance Service

Department

Company Name : Sc. Talpac SRL

Str Hanes Gheorghe nr.1 Constanta, Romania

This company execute:

- Infrastructure construction projects and design (industrial, urban and

utilities) in the construction of pipelines (Oil & Gas and Water)

- Civil and industrial construction, repair oil tanks and oil pipelines,

construction of bridges and houses.

-Controlling, Supervising and Managing in Heavy Civils

- Structural Construction Infrastructures - Bridges, Roads & Highways

- drainage, structures and earthworks

Main responsibilities

The follow-up work on projects.

Control of welding and welders, inspection and testing for certified

welders.

Observance of the standards of workers such as: ASME, TS 16949, APQP, PPAP,

FMEA, API, ASME, GOST, NFPA, NACE and ISO 9002 quality standards.

Site organization and all production processes.

Project Manager for all work.

Human Resources manager and staff

-Preparing project specifications.

-Performing the necessary engineering calculations to ensure safe practice.

-Ensuring health & safety issues are resolved.

-Liaison with Field and Inspection personnel.

-Evaluation of defects and selection of proper repair techniques.

- Experienced in developing and upgrading Stick, GMAW, GTAW, PTAW, and Arc

welding procedures to be used by production personnel.

- Familiarity with : API 611, API 612, API 1117, ASTM, ASME Section

VIII, IX codes

- Familiarity with : TS 16949, APQP, PPAP, FMEA

- Familiarity with : PCN Rad Interpretation

-To participate in evaluation of CFT documents for SURF contract in the

flexible pipeline discipline.

-To prepare input to the weekly report for the flexible pipeline

discipline.

- To work in compliance with C150/95 (Norms related to quality of steel

welded joints for civil, industrial and agricultural construction), SREN

25817/93 (Arc welded joint in steel), STAS 767/0 - 88 (Steel construction.

General technical quality condition.)

Main projects that I attended with my team were: (ANEXA 1 )

"Field System Pipeline In The Terminal Of SC. OIL TERMINAL SA

Refinery" - Oil & Gas Construction Project

Pipeline project, 6'' and 20'',

Pipeline project 6'' and 10''

The total length of the oil & gas pipeline is 125 kilometers

The "Tank T7 - 50000 mc - transformation of the floating roof in a

fixed roof" - Oil & Gas Construction Project

Responsibilities that I have had for these projects

are:

- Supervision of the construction project from start to finish

- I performed a key role in setting technical specifications and design to

construction and infrastructure

- I planned execution of projects

- I made identifying budget and identification of resources

- I fixed the link between clients, architects and designers, entrepreneurs

and government administrators and regulators

- I set out to create teams, developing goals and objectives for each of

these teams, assigning individual responsibilities

- I have watched and monitored several project accounting functions

including budget proposal, approved budget management to actively

participate and support the offer (e-tendering) process

- I watched the draft and I expenses calculated minimize exposure

- I made sure that construction activities will be carried out in

accordance with predetermined schedule and technical rules in vigor

- I have developed work plans and project execution teams I set up

revisions and program revisions when necessary

- I communicate effectively with designers and contractors responsible for

completing various phases of the project

- I coordinated efforts of all parties involved, including architects,

consultants, contractors and my team

- I monitored the progress of construction activities on a regular and

organized regular meetings of state programs with all sub-teams

- I monitor and maintain strict adherence to the budgetary guidelines,

quality, safety and ethical standards

- I was involved in regular inspection of construction sites, I took the

project document control functions, if complete, identifying elements of

project design and construction likely to give rise to disputes and claims

INTERMEDIAR POSITION FOR WORK HISTORY

January 2007 - May 2012 *Director Executive / Adm.

Company Name : Sc. X - WORK SRL Temporary Work Agency

Company activity field: Temporary agency workers, engages in the port area

(loading / unloading ships, crane wharf, dockers repair

ships, housing repairs and welding ships and ship skeleton or coca,

port operations ) for port operation works only on the set period, with the

contract.

Responsibilities:

* I have led a team of project control engineers, planners, and control of

documents, qualified to analyze and evaluate project costs and performance

against a set schedule with critical milestones.

* I have led a team of engineers specialized in industrial buildings to

meet the control requirements of the project.

* The projects executed, development, management and execution of all

phases of project controls (planning / scheduling and cost analysis), were

important elements which I have reported directly to the Program Manager.

* I participated with a team of experts, engineers and analysts responsible

for the development, management and execution of all phases of the project.

* I have responded directly against the beneficiary of all controls effort

(planning / scheduling, cost, document management and control).

* I always gave statistical reports based on all beneficiaries or clients,

I organized and participated in regular meetings in which I present the

project milestones achievements.

* I prepared status reports, I supervised the preparation of monthly

reports and progress in work on major and intermediate stages of the

project

* I have led technical department who is qualified to examine and evaluate

project costs and performance against an established program, with its

critical stages.

* I managed impact on building design, program changes and deviations,

inconsistencies arise from external factors not calculated.

* I have watched customization project control systems and document control

system to meet specific project requirements ..

Personnel selection and school personnel qualifications

Daily organization of working teams and control of quality work .Part -

Time

June 1994 - June 1995 *Stock BROKER

Company Name : Constanta Maritime and Commodity Stock Exchange,

Company activity field: Market Management and Marketing, International

transport contracts

Negotiating futures contracts, INCOTERMS Responsibilities: WORK

EXCHANGE BROKER

May 1990 - June 1994*Technician - Assistant

Company Name : Ovidius University Constanta,

Company activity field: Education, university education

Responsibilities: Training activities of the laboratory in the Laboratory

of Optical Physics.

October 1987 - May 1990 *AMC Technician,

Company Name PECO-Shell Romania, Constanta

Company activity field: Petrochemical, Oil and Gas

Responsibilities: Control the measurement and control devices LPG filling

stations gas cylinders gas . Repair of transducers

Education

1. OVIDIUS UNIVERSITY - Faculty of



Contact this candidate