Name / Surname Nichita Liviu
Address (s) Suceava 8, Bl U2 Sc.A, Ap.11, Constanta, Romania
Phone (-lion) Mobile: 004**********
E-mail (s) *******@*****.***
Nationality (es) Romanian
Date of birth 14 July 1967
Male
Skype ID: liviu.nichita
Desired employment / Occupational field : Senior Quality Engineer
Quality Engineer - Quality Department
Professional Experience
My background is specified in the Letter Request, along with Cover Letter
and Annex 1, accompany my CV
01 / 2012 - present
Industrial Quality Engineer - Quality Assurance & Quality Control Engineer
- Technical Director
Quality Assurance Department
Company Name : Sc. Rom Coman SRL
Alimanu village, Constanta County, Romania
This company execute:
- Infrastructure construction projects and design (industrial, urban and
utilities) in the construction of pipelines (Oil & Gas and Water)
-Infrastructure projects for roads, highways and railways
- Projects construction / reconstruction, repairs and upgrades to
buildings, houses, villas, hotels, historical monuments, parks and gardens
of the city.
- Projects irrigation for agricultural crops and orchards parks
I am technical coordinator of the project and I following main
responsibilities:
- Monitoring and verification of software production, suborder list, QC
inspection & delivery.
- Checking and inspection of welded joints quality during technological
process and results control visual examination work in progress and
effective supervision of repair procedures;
- Checking and inspection of welds, so they should be performed in
accordance with procedures;
- Ensure that all welding operations are executed in accordance with all
relevant codes of practice (ASME Code, V, VIII, IX, B31.1, B31.3, AWS D1.1,
Section) and company procedures / practices
The main projects that my team is currently working in this company are:
(ANEXA 1 )
"Replacing the oil pipelines from Depository section Tanks - Park crude -
to oil terminal in Constanta Port ' - Oil & Gas Project
"Restoration of the Mausoleum of Adamclisi and performing works of
antique landscape architecture, artisanal, typical tourist area .
Drilling, collecting, pumping, transmission and distribution systems
water jets and fountains pipelines" - System Water Pipeline Project
For this project I coordinate system industrial
performance for pipeline irrigation, varieties construction of
landscaping,construction of roads paved with stone.
I lead, I organize and coordinate construction sites
workers (35-70) for the construction of houses pumps water pipes, water
supply in tourist areas, civil engineering for water collection tanks made
of concrete and / or metal, development of fish ponds, bridges and
culverts access placed in / on artificial islands off the tourist lakes or
in the sea, projects construction of marine pontoons .
I coordinate civil works for the restoration and
rehabilitation of historic monuments, their stone and marble tiling, teams
of engineers design for parks, teams of workers to artificial planting
works, teams of workers for work of irrigation sprinkler systems in areas
easily accessible / inaccessible water and building water wells with
special effects.
1. "Modernization and repair of roads and railways in Constanta Port .
Rebuilding and modernization of Railways Goods and Commodity Station of
Constanta Port Connections of the sewage pipes from the storage tank .
" - Infrastructural, Steel or Metal Construction Project and Buildings
2. "Construction of Cargo train station building from the oil terminal Sc.
Oil Terminal SA and extension of the railway to port platform" -
Infrastructural, Steel or Metal Construction Project and Buildings
5 . "Cranes to transport iron ore from the warehouse to the port
terminal" - Infrastructural Steel or Metal Construction Project for
Constanta Shipyard Romania
I watched and I organized execution on site in terms of quantity, quality,
and compliance deadlines;
I checked the execution plans and I proposed constructive solutions to
resolve nonconformities identified and technologies;
I studied design details and technical documentation necessary for
construction
For each building individually, I draw up the building;
I have prepared and / or checked attachments, statements of work, work
reports, minutes and other documentation technical nature;
I watched as the supply of materials ordered to make timely and quality
checked existing documents;
I learned and I've seeks enforcement of legislation, technical working
procedures and instructions.
3/2007 - 05/2012
Quality Engineer Specialist - Contract Manager
Quality & Welding Control Department
Company Name : Sc. Sigmaluby SRL
Str. Port Agigea Sud, Constanta, Romania
This company execute:
- Infrastructure construction projects and design (industrial, urban and
utilities) in the construction of Water pipelines
- Civil and industrial construction, construction of bridges and houses.
-Projects construction / reconstruction, repairs and upgrades to buildings,
houses, villas, hotels
-Controlling, Supervising and Managing in Heavy Civils
- Structural Construction Infrastructures - Bridges, Roads & Highways
- drainage, structures and earthworks
I worked full compliance with ASME, TS 16949, APQP, PPAP, FMEA, API, ASME,
GOST, NFPA, NACE
I coordinated the implementation of ISO 9002 Quality System
I checked works the construction, welding drawings and welding control
daily .
In all executions of projects has been taken into
account:
-Preparing project specifications.
-Performing the necessary engineering calculations to ensure safe practice.
-Ensuring health & safety issues are resolved.
-Liaison with Field and Inspection personnel.
-Evaluation of defects and selection of proper repair techniques.
- Experienced in developing and upgrading Stick, GMAW, GTAW, PTAW, and Arc
welding procedures to be used by production personnel.
- Familiarity with : API 611, API 612, API 1117, ASTM, ASME Section
VIII, IX codes
- Familiarity with : TS 16949, APQP, PPAP, FMEA
- Familiarity with : PCN Rad Interpretation
-To participate in evaluation of CFT documents for SURF contract in the
flexible pipeline discipline.
-To prepare input to the weekly report for the flexible pipeline
discipline.
- To work in compliance with C150/95 (Norms related to quality of steel
welded joints for civil, industrial and agricultural construction), SREN
25817/93 (Arc welded joint in steel), STAS 767/0 - 88 (Steel construction.
General technical quality condition.)
I watched the welding procedures, welding and control
QC department works required for large pipe-lay, HDD (pull line) and DLS
jacket for construction projects. ( OIL & GAS PROJECTS )
" Dzhubga - Lazarevskoye - Sochi gas pipeline " is part of the program
for the construction of Olympic facilities in Sochi Development
The total length of the pipeline is 177 kilometers,
including the larg.Traseul 159.5 km pipeline running under the Black Sea
from the coast (about 4.5 km from the coast), the natural gas distribution
station near Kudepsta Soci.24 inch pipeline will have an annual capacity of
approximately 3.8 billion cubic meters flow.
In early 2009, the company Melrose Resources has initiated a development
program to convert the
"Galata platform to spring from Kavarna 2, Bulgaria " broad field to a
gas storage facility
For these projects, I had responsibilities of organizing work teams and
tracking of work measured by the time, the use of resources and quality .
Romanian Company was awarded the contract for engineering, procurement,
fabrication, transportation, installation and testing offshore pipeline 8.5
km x 6 "Galata platform to spring from Kavarna 2, and 14.5 km x 10" Galata
platform to spring from Kaliakra 2, with associated piggyback liquid lines.
"Komarom gas pipeline " is part of the program for the construction of
Mol Company Development
The total length of the pipeline is 127 kilometers,
including the natural gas distribution station near Budapest .24 inch
pipeline .
For these projects, I had responsibilities of organizing work teams and
tracking of work measured by the time, the use of resources and quality .
Romanian Company was awarded the contract for engineering, procurement,
fabrication, transportation, installation and testing pipeline 6,5 km x 6
" and 18.5 km x 10" .
Main projects that I attended with my team were (ANEXA 1 )
"Works for replacement the railways of tram with the introduction of
new railways and arrangement for the construction at Central Park
Constanta" - Infrastructural Construction Project
" To sweat separators welding works for power station with coal in
RECEL Romania Hot water piping system . " - Resources Natural Energy
Construction Project
"Sun Highway -Constanta - Bucharest Romania - Sector sea -channel
crossing parallel with Sluice . Related works rainwater drainage,
modification and thoroughfare diversion of water pipe, irrigation
canal repair." - Infrastructural & Utility Construction Project and
Steel or Metal Construction Project
"Building, Construction & Installation of gas stations in RO-RO
terminal Agigea South Port container" - Oil & Gas Construction
Project and Steel or Metal Construction Project and Buildings
Main responsibilities:
* I was involved in company management system to provide resource
management to handle administrative matters such as staff costs and
training.
* I have conducted quality audits, both as PMC and EPC contractor
management systems to check the implementation of quality standards and
quality control practices.
* I have led a team of project control engineers, planners, and control of
documents, qualified to analyze and evaluate project costs and performance
against a set schedule with critical milestones. * I have led a team of
engineers specialized in industrial buildings to meet the control
requirements of the project.
* The projects executed, development, management and execution of all
phases of project controls (planning / scheduling and cost analysis), were
important elements which I have reported directly to the Program Manager.
* I participated with a team of experts, engineers and analysts responsible
for the development, management and execution of all phases of the project.
* I have responded directly against the beneficiary of all controls effort
(planning / scheduling, cost, document management and control).
* I always gave statistical reports based on all beneficiaries or clients,
I organized and participated in regular meetings in which I present the
project milestones achievements.
* I prepared status reports, I supervised the preparation of monthly
reports and progress in work on major and intermediate stages of the
project
* I have led technical department who is qualified to examine and evaluate
project costs and performance against an established program, with its
critical stages.
* I managed impact on building design, program changes and deviations,
inconsistencies arise from external factors not calculated.
* I have watched customization project control systems and document control
system to meet specific project requirements ..
I am technical coordinator of the project and I following main
responsibilities:
- checking and quality inspecting welded joints during technical process
and control results; examining visually work in progress and effectively
supervising repair procedures;
- checking and inspecting welds so as they should be performed in
compliance with applicable procedures;
- ensuring that all Welding operations are executed in accordance with all
relevant Codes of Practices (ASME Code,V, VIII, IX Section, AWS) and
Company procedures/practices;
- handling all welding technical queries and investigating all field
welding related problems;
- liaising between the Client Inspection Department on all aspects of
Welding, Heat Treatment, Hardness Testing and Non-Destructive Testing;
- checking the validity of welders' authorizations for welds.
01/2001 - 03/2007
Quality Assurance & Control Engineer Specialist - Technical Contract
Manager
Company Name : Sc. Magic Oil Ltd - Constanta Branch - Romania
Subsidiary Magic Oil Varna - Bulgarien
Company active in the market, aimed at business-selling price of petroleum
products and lubricants, but also have other activities such as
construction of small tanks of diesel and gasoline, with teams of welders
qualified for such work.
This company execute:
- Infrastructure construction projects and design (industrial, urban and
utilities) in the construction of pipelines (Oil & Gas and Water)
- Civil and industrial construction, repair oil tanks and oil pipelines,
construction of bridges and houses.
- Structural Construction Infrastructures - Bridges, Roads & Highways
In all executions of projects has been taken into
account:
-Preparing project specifications.
-Performing the necessary engineering calculations to ensure safe practice.
-Ensuring health & safety issues are resolved.
-Liaison with Field and Inspection personnel.
-Evaluation of defects and selection of proper repair techniques.
- Experienced in developing and upgrading Stick, GMAW, GTAW, PTAW, and Arc
welding procedures to be used by production personnel.
- Familiarity with : API 611, API 612, API 1117, ASTM, ASME Section
VIII, IX codes
- Familiarity with : TS 16949, APQP, PPAP, FMEA
- Familiarity with : PCN Rad Interpretation
-To participate in evaluation of CFT documents for SURF contract in the
flexible pipeline discipline.
-To prepare input to the weekly report for the flexible pipeline
discipline.
- To work in compliance with C150/95 (Norms related to quality of steel
welded joints for civil, industrial and agricultural construction), SREN
25817/93 (Arc welded joint in steel), STAS 767/0 - 88 (Steel construction.
General technical quality condition.)
Main projects that I attended with my team were (ANEXA 1)
"Field System Pipeline In The Terminal Of SC. OIL TERMINAL SA
Refinery" - Oil & Gas Construction Project
Pipeline project, 6'' and 20'',
Pipeline project 6'' and 10''
The total length of the oil & gas pipeline is 125 kilometers
1. "Construction of metal road bridges - Maria Bridge Section 1 -
pillars " - Steel or Metal Construction Project
2. "Residential villas and motels - earthworks, building works shores,
bridges, roads, and utilities system water pipelines in Arad Town,
Ramnicu Valcea Town and Ploiesti Town of Romania and Varna Town of
Bulgaria . " - Buildings Construction Project
"Works for replacement the railways of tram with the introduction of
new railways of Constanta Port" - Infrastructural Steel or Metal
Construction Project
3. " Field System Pipeline In The Terminal Port SC. ROMPETROL SA Oil &
Gas Refinery Midia Navodari Kazakhmunay Gaz Romania " - Oil & Gas
Construction Project
Pipeline project, 6'' and 20'',
Pipeline project 6'' and 10''
The total length of the oil & gas pipeline is 77 kilometers
4. "Construction of metal road bridges - Maria Bridge Section 2 -
pillars " - Steel or Metal Construction Project
I had to check quality of work performed by their
employees and subcontractors to execute projects.
I had to check welds according to ASME, ISO 9001, ISO
9002, TS 16949, APQP, PPAP, FMEA.
Responsibilities have included issues such as:
* Monitoring, recording, and change the batch number of products completed
* Distribution of quality documents such as registration process
inspection, etc.
* Maintain all records of inspection and release of non-compliance reports
non-compliance
* Ensure that all approvals for the execution of projects or products have
been inspected properly to control inspection plans / reports.
* Ensure that any additional information requested by internal clients are
properly recorded and were presented in a timely manner (eg, SPC data).
* Ensuring that all destructive tests are performed according to internal
and customer specifications.
* Maintain a clean and tidy workspace.
* As an engineer and manager QA / QC I was responsible for overall project
management and I kept in touch with representatives acting in support of
PMC.
* I have provided reports and project audits
* I have solved any problems QA / QC related when it was necessary
* Ensuring customer quality requirements are met
* Provide effective technical support to the project team on all aspects of
QA / QC
* I monitored, I watched, I coordinated and controlled I QA / QC for the
supply of materials, prefabrication and construction for all phases of
project implementation
* I was responsible for preparing, reviewing and developing quality
management plan contract, inspection and test plans, strategy and overall
quality, in collaboration with the project manager and project managers.
* I was personally responsible for QA / QC (including discipline
inspection, welding and NDT) and check that the right skills and staff to
fulfill their duties on the activity identified in the contract.
* I was responsible for supervising and coordinating the company's plan to
provide inspection and testing at manufacturer's facilities.
* I was involved in company management system to provide resource
management to handle administrative matters such as staff costs and
training.
* I have conducted quality audits, both as PMC and EPC contractor
management systems to check the implementation of quality standards and
quality control practices
10/1998 - 03/2007
Quality Control Center - Technical Branch Manager
Company Name : Sc. Approved Construct SA
Romania Branch - Constanta, Arad
Hungarian Branch - Komarom ( Ungaria )
This company execute:
- Infrastructure construction projects and design (industrial, urban and
utilities) in the construction of pipelines (Oil & Gas and Water)
- Civil and industrial construction, repair oil tanks and oil pipelines,
construction of bridges and houses.
-Projects construction / reconstruction, repairs and upgrades to buildings,
houses, villas, hotels
-Controlling, Supervising and Managing in Heavy Civils
- Structural Construction Infrastructures - Bridges, Roads & Highways
- drainage, structures and earthworks
The main projects were major repair tanks and pipes, replacement of the
floating works of reservoirs, works on fixed roof tanks.
Manufacturing projects were made for large companies in Romania, such as
refineries SC OIL TERMINAL SA and SC. ROMPETROL Midia SA
In all executions of projects has been taken into
account:
-Preparing project specifications.
-Performing the necessary engineering calculations to ensure safe practice.
-Ensuring health & safety issues are resolved.
-Liaison with Field and Inspection personnel.
-Evaluation of defects and selection of proper repair techniques.
- Experienced in developing and upgrading Stick, GMAW, GTAW, PTAW, and Arc
welding procedures to be used by production personnel.
- Familiarity with : API 611, API 612, API 1117, ASTM, ASME Section
VIII, IX codes
- Familiarity with : TS 16949, APQP, PPAP, FMEA
- Familiarity with : PCN Rad Interpretation .
- To work in compliance with C150/95 (Norms related to quality of steel
welded joints for civil, industrial and agricultural construction), SREN
25817/93 (Arc welded joint in steel), STAS 767/0 - 88 (Steel construction.
General technical quality condition.)
Main projects that I attended with my team were: (ANEXA 1)
"Field System Pipeline In The Terminal Of SC. OIL TERMINAL SA Refinery
- Port Constanta . " - Oil & Gas Construction Project
Pipeline project, 6'' and 20'',
Pipeline project 6'' and 10''
The total length of the oil & gas pipeline is 44 kilometers
1. " Field System Pipeline In The Terminal Port SC. ROMPETROL SA Oil &
Gas Refinery Midia Navodari Kazakhmunay Gaz Romania - Terminal Port
Navodari " - Oil & Gas Construction Project
Pipeline project, 6'' and 20'',
Pipeline project 6'' and 10''
The total length of the oil & gas pipeline is 47 kilometers
"The Mary Bridge section 2 - the Danube - Black Sea" -
Infrastructural Steel or Metal Construction Project
" The Construction of coal and coke terminal platform port of
Constanta Port for Sc. Minmetal SA Company Romania ". - Resources
Natural Energy Construction Project
Responsibilities :
*To ensure that flexible pipelines are designed in accordance to
statutory regulations and guidelines
* To control and validate scope of work for the flexible pipeline
discipline in Detail engineering
* To coordinate the mechanical and piping activity with the rest of the
project.
* To respect HSE including work environment rules and ensure that they
are respected at all times, reporting any irregularities.
* To participate in evaluation of CFT documents for SURF contract in the
flexible pipeline discipline.
* To prepare input to the weekly report for the flexible pipeline
discipline.
* Co-ordinate activities with other disciplines.
* To prepare the documentation necessary to implement modification
requests
* Co-ordinate the flexible pipeline studies
*To support Engineering, Procurement, Contracts and Construction
departments in resolving Quality related issues.
*To participate in NDT examinations.
*To report any quality problems to the QA/QC Head and Project
Construction Manager.
*To inspect and check test plans and Follow-up execution of ITP'S.
*In case of any non conformity in construction and pre-commissioning
activities, to report to QA/QC Head and request a Non Conformance
Report.
*Follow-up the clearance of the NCR'S issued.
*To compile the welding books and weld maps per customer requirements.
*To review all welding procedures to assure that they are in compliance
with the customer requirements.
*To coordinate customer review of all welding documents .
* Familiarity with Engineering and Quality practices and procedures
including APQP, PPAP, blueprint reading, GD&T, use of measuring
instruments, checking aids / fixtures, computer applications, mechanical
testing, and customer and ISO-TS 16949 requirements
*To work in compliance with ASME Sec IX 2004 Edition + Addenda, ASME B
31.1 Ed. 2004, ASME B 31.3 Ed. 2002, API 1104 Ed. 2000, API 5L., AWS D1.1
Work areas: Fabshop - Carbon Steel (ASTM 106 Gr. B), Stainless Steel,
LTCS (A333 Gr. 6 to A350 LF2), LTCS NACE Pipes, NACE, Low alloy.
06/1995 - 10/1998
Quality Assurance Engineer - Quality Specialist - Welding Resources
Manager - Quality Technical Manager
Quality Assurance Service
Department
Company Name : Sc. Talpac SRL
Str Hanes Gheorghe nr.1 Constanta, Romania
This company execute:
- Infrastructure construction projects and design (industrial, urban and
utilities) in the construction of pipelines (Oil & Gas and Water)
- Civil and industrial construction, repair oil tanks and oil pipelines,
construction of bridges and houses.
-Controlling, Supervising and Managing in Heavy Civils
- Structural Construction Infrastructures - Bridges, Roads & Highways
- drainage, structures and earthworks
Main responsibilities
The follow-up work on projects.
Control of welding and welders, inspection and testing for certified
welders.
Observance of the standards of workers such as: ASME, TS 16949, APQP, PPAP,
FMEA, API, ASME, GOST, NFPA, NACE and ISO 9002 quality standards.
Site organization and all production processes.
Project Manager for all work.
Human Resources manager and staff
-Preparing project specifications.
-Performing the necessary engineering calculations to ensure safe practice.
-Ensuring health & safety issues are resolved.
-Liaison with Field and Inspection personnel.
-Evaluation of defects and selection of proper repair techniques.
- Experienced in developing and upgrading Stick, GMAW, GTAW, PTAW, and Arc
welding procedures to be used by production personnel.
- Familiarity with : API 611, API 612, API 1117, ASTM, ASME Section
VIII, IX codes
- Familiarity with : TS 16949, APQP, PPAP, FMEA
- Familiarity with : PCN Rad Interpretation
-To participate in evaluation of CFT documents for SURF contract in the
flexible pipeline discipline.
-To prepare input to the weekly report for the flexible pipeline
discipline.
- To work in compliance with C150/95 (Norms related to quality of steel
welded joints for civil, industrial and agricultural construction), SREN
25817/93 (Arc welded joint in steel), STAS 767/0 - 88 (Steel construction.
General technical quality condition.)
Main projects that I attended with my team were: (ANEXA 1 )
"Field System Pipeline In The Terminal Of SC. OIL TERMINAL SA
Refinery" - Oil & Gas Construction Project
Pipeline project, 6'' and 20'',
Pipeline project 6'' and 10''
The total length of the oil & gas pipeline is 125 kilometers
The "Tank T7 - 50000 mc - transformation of the floating roof in a
fixed roof" - Oil & Gas Construction Project
Responsibilities that I have had for these projects
are:
- Supervision of the construction project from start to finish
- I performed a key role in setting technical specifications and design to
construction and infrastructure
- I planned execution of projects
- I made identifying budget and identification of resources
- I fixed the link between clients, architects and designers, entrepreneurs
and government administrators and regulators
- I set out to create teams, developing goals and objectives for each of
these teams, assigning individual responsibilities
- I have watched and monitored several project accounting functions
including budget proposal, approved budget management to actively
participate and support the offer (e-tendering) process
- I watched the draft and I expenses calculated minimize exposure
- I made sure that construction activities will be carried out in
accordance with predetermined schedule and technical rules in vigor
- I have developed work plans and project execution teams I set up
revisions and program revisions when necessary
- I communicate effectively with designers and contractors responsible for
completing various phases of the project
- I coordinated efforts of all parties involved, including architects,
consultants, contractors and my team
- I monitored the progress of construction activities on a regular and
organized regular meetings of state programs with all sub-teams
- I monitor and maintain strict adherence to the budgetary guidelines,
quality, safety and ethical standards
- I was involved in regular inspection of construction sites, I took the
project document control functions, if complete, identifying elements of
project design and construction likely to give rise to disputes and claims
INTERMEDIAR POSITION FOR WORK HISTORY
January 2007 - May 2012 *Director Executive / Adm.
Company Name : Sc. X - WORK SRL Temporary Work Agency
Company activity field: Temporary agency workers, engages in the port area
(loading / unloading ships, crane wharf, dockers repair
ships, housing repairs and welding ships and ship skeleton or coca,
port operations ) for port operation works only on the set period, with the
contract.
Responsibilities:
* I have led a team of project control engineers, planners, and control of
documents, qualified to analyze and evaluate project costs and performance
against a set schedule with critical milestones.
* I have led a team of engineers specialized in industrial buildings to
meet the control requirements of the project.
* The projects executed, development, management and execution of all
phases of project controls (planning / scheduling and cost analysis), were
important elements which I have reported directly to the Program Manager.
* I participated with a team of experts, engineers and analysts responsible
for the development, management and execution of all phases of the project.
* I have responded directly against the beneficiary of all controls effort
(planning / scheduling, cost, document management and control).
* I always gave statistical reports based on all beneficiaries or clients,
I organized and participated in regular meetings in which I present the
project milestones achievements.
* I prepared status reports, I supervised the preparation of monthly
reports and progress in work on major and intermediate stages of the
project
* I have led technical department who is qualified to examine and evaluate
project costs and performance against an established program, with its
critical stages.
* I managed impact on building design, program changes and deviations,
inconsistencies arise from external factors not calculated.
* I have watched customization project control systems and document control
system to meet specific project requirements ..
Personnel selection and school personnel qualifications
Daily organization of working teams and control of quality work .Part -
Time
June 1994 - June 1995 *Stock BROKER
Company Name : Constanta Maritime and Commodity Stock Exchange,
Company activity field: Market Management and Marketing, International
transport contracts
Negotiating futures contracts, INCOTERMS Responsibilities: WORK
EXCHANGE BROKER
May 1990 - June 1994*Technician - Assistant
Company Name : Ovidius University Constanta,
Company activity field: Education, university education
Responsibilities: Training activities of the laboratory in the Laboratory
of Optical Physics.
October 1987 - May 1990 *AMC Technician,
Company Name PECO-Shell Romania, Constanta
Company activity field: Petrochemical, Oil and Gas
Responsibilities: Control the measurement and control devices LPG filling
stations gas cylinders gas . Repair of transducers
Education
1. OVIDIUS UNIVERSITY - Faculty of