Post Job Free
Sign in

Project Control

Location:
Patna, UP, 221712, India
Salary:
6 lacs
Posted:
April 13, 2013

Contact this candidate

Resume:

Prerna kapoor

[pic]

**, ****** **** ********* *.P-

211003, Mobile: 945-***-****

Email:

*****************@**********.***;

CAREER OBJECTIVE: -

To attain the position in an

organization where my knowledge and energy can be fully utilized by the

organization towards the fulfillment of the organizational goals.

STRENGTH:-

I am well-organized confidant laborious and

hardworking. I believe in teamwork. Learns from mistakes and assimilates

fast. My biggest asset is my ability to deal people.

Experience Highlights

Project Execution

. Listing of instruments used in the plant at different section

along with their operating principle, working range, make, model

etc as a part of probation period project

. Complete RAW Sugar project from installation up to Control loop

testing from DCS

. Working on DCS Upgradation project.

. Attended FAT in I/A DCS up gradation project

. Erection and commissioning of field

instruments, Panel wiring, Control loops testing and all related

Engineering

Other Details

. Having hands on experience in FOXBORO I/A DCS

system, YOKOGAWA DCS Centum CS-3000 and

ALLEN-BRADELY PLC CONTROL LOGIX 5

. Having knowledge of PLC programming (Rockwell) and Graphics

development using SCADA.

. Analysis of DCS and PLC trends (load, speed and level) to find

out the root cause of major breakdowns during running season

. Analysis of various interlock schemes followed at Milling, and

Power Station.

. Analysis of data recorded to position turbine rotor axial using

Dial Gauge as Master Equipment and Bentley vibration probes to

display axial position on DCS

. Checking of Control Oil & Lube Oil line Pressure switches engaged

for safety interlocking to avoid abnormal condition and to ensure

turbine smooth running and prepare a report for future reference

. Estimating the total cost involved for installation and wiring

of field instruments

. Calibration of Field Instruments

. Preparation of Instruments and Control valves Datasheet

. Planning and indenting of materials used on SAP.

. Preparation of calibration reports using MS-Excess.

. Preparation of IO list from project P& ID's.

. Maintenance &Wiring configuration of input & output module

. Familiar with Device Communication Instrument (HART Communicator)

and SMART field instruments DPT, PT transmitters (make ABB,

Rosemount & Yokogawa) for press. level & flow measurements

. Having knowledge of SEDL system panel wiring & field instruments.

. Familiar with bagging system software programming chronous

Richardson's

. Repair and Maintenance of high Pr. And low Pr. Boilers, Power

turbine (7.5MW & 20 MW; condensing cum extraction turbines)

. Monitoring & Controlling of 3-element drum level, boiler fuel

combustion, super heated steam temp., PRDSH control and

monitoring of boiler parameters using DCS CS-3000

. Planning of PM and CM jobs.

. Preparation of instrument calibration reports as per ISO

standards.

. Weekly Training / Discussion sessions on various field

instruments for overall knowledge up-gradation

Employment History

. DCM Shriram Consolidated ltd. (DSCL.- an ISO 9000, ISO 14000,

and OHSAS 18000 certified group ), - Instrumentation Assistant

Engineer in Repair and Maintenance team from July 2008 to 6 Feb

2012

. Presently working as senior executive officer in PCBL Durgapur

(RPG Group).

Familiar With

. Allen Bradley PLC, RSView32, RS View SE, RS Link, Yokogawa

DCS CS3000.

. Having training & familiar with FOXBORO I/A SERIES DCS SYSTEM

. Knowledge about Woodward controller & governing system.

. Analog/Smart Transmitters of Fisher Rose Mount, Emerson and

Yokogawa, Temperature Transmitters, Magnetic & Mass flow meter of

ABB & Micro motion

. Oxygen Analyzer of Yokogawa & Rosemount

. Electronic Ferrule printing machine Model LETAWIN LM-380A

. Auma e-PAC actuator & MOV's

. MIL & Mazda control valve,7400 & 8038 position control unit,

I/P's

Education and Training

TECHNICAL QUALIFICATION:-

Three years DIPLOMA in instrumentation & control

Engineering from I.E.R.T Allahabad with FIRST Division (80%) in the year

2008.

Passed AMIE (SEC-A) Examinations & appearing in Sec-B Examinations in the

branch of Electronics & Communication Engineering under The Institution of

Engineers (India)

ACADEMIC QUALIFICATION:-

Class XII form C.G.I.C Allahabad U.P. in the year 2005

Class X form I.G.I.C Allahabad U.P. in the year 2003.

SUBJECT OF INTEREST:-

COMPUTER APPLICATION

INDUSTRIAL ELECTRONICS.

REASONING

TRAININGS:-

. Four weeks summer training at B.P.C.L during Diploma 2nd year.

. FIVE days Training attended and has successfully completed the course of

I/A Essential,Programming & Advance Maintenance on I/A Series Foxboro

DCS conducted by Invensys India, Chennai

. Two days training on WOODWARD governing systems.

COMPUTER PROFICIENCY: - MS OFFICE-2000 & XP control Yokogawa CS-3000

Distributed system (basics), Internet

AREA OF INTEREST:- Reading, Internet Surfing.

OTHER ACHIEVEMENTS:-

. Participated in dances and skits at DSCL-Ajbapur

. Cultural Additional Captain in collage

. Executive member of college committee

. First winner in sports meet. .

PERSONAL DETAILS: -

FATHER'S NAME : - Mr.

Anil Kapoor

DATE OF BIRTH : - 01

July. 1989

MARITAL STATUS: -

UNMARRIED

SEX : -

FEMALE

NATIONALITY : -

INDIAN

CATEGORY : - GENERAL

DECLARATION

The above information is true to best of my knowledge and believes.

DATE:-

PLACE: -

(PRERNA KAPOOR)



Contact this candidate