CURRICULUM VITAE

Mohammed Azharul Ishaque E-mail: ******@*****.**.**

S/o: Mohammed Mazharul Haque Phone No: 009***********

Visakhapatnam, Andhra Pradesh, India

+91-988*******(M)

+91-891*******

Career Objective

Seeking a position to utilize my skills and experience in Engineering,

Inspection & Quality Department while being resourceful, innovative and

flexible.

Educational Qualifications

. Bachelor of Technology in Mechanical Engineering from Nimra College of

Engineering &Technology affiliated with Jawaharlal Nehru

Technological University, Hyderabad, India

. Intermediate (12th) in Mathematics, Physics and Chemistry from the

Board of Intermediate Education

. Secondary School Certificate (10th) from Central Board of Secondary

Education

Professional Qualifications

. American Welding Society-Certified Welding Inspector (AWS-CWI)

. Seaman's Record Book/CDC issued by Bahamas Maritime Authority

. Helicopter Underwater Escape Training(HUET)

. Standards of Training, Certification & Watch Keeping (STCW-95)

. IMMARBE, Belize Certified Elementary First Aid

. IMMARBE, Belize Certified Personal Safety& Social Responsibilities

. IMMARBE, Belize Certified Personal Survival Techniques

. IMMARBE, Belize Certified Fire Prevention& Fire Fighting

. Non Destructive Testing (NDT) Level-II

. ASNT Certified Ultrasonic Testing (UT) Level II -

Valid up to 13.11.2014

. ASNT Certified Radiographic Testing (RT) Level II - Valid

up to 26.11.2014

. ASNT Certified Penetrant Testing (PT) Level II -

Valid up to 04.11.2014

. ASNT Certified Magnetic Particle Testing (MPT) Level II - Valid up

to 17.11.2014

Technical Skills

. Software : Primavera

(Planning Software), MS Office

. Languages : C language

. CAD/CAM Packages : AUTO CAD

. Operating Systems : Windows

98/2000/XP/vista/7

. Codes : ASME Sec

ll,V,Vlll,lX,B 31.3,31.4,APl 650

Extra-Curricular Activities

. Organized events at school and college level functions like science

Exhibition, annual day celebrations, teachers day, sports meet, etc

. Been vice captain while at school& college

. Participated and won prizes in sports& sea cadet corps (SCC, a part of

Indian navy)

Training

. TWI -Welding Inspection Techniques and Types of Welding process

. CII - Industrial Painting Process and Applications

. ASNT-Non Destructive Testing Methods

Strengths

. Have a balanced, patient approach in times of crisis.

. Quick to adapt to new environment, positive attitude.

. Can easily mingle with people and make friends.

. Flair for new challenges.

Experience

1. SABIC-IBN ZAHR

Designation : Plant Inspector

Employment Type : Permanent Contract

Duration : February 2013 to Present

. Inspection of equipments in the plant

. Reviewing inspection plan for the asset

. Optimizing inspection activities based on risk analysis

. Prioritizing inspection of high probability and high consequence

(i.e. high risk) asset than to those with lower consequences or

risks

. Witnessing NDT activities like DPT, UT, R.T, RFET, IRIS, etc and

reviewing of RT Films whenever films come up for review after

the test

. Inspecting incoming materials of applications

. Reviewing of ITP, welding Procedure Specification (WPS) &

Procedure Qualification Record (PQR) and Witness of Welder

Qualification Test (WQT) according to ASME Sec IX

. Monitoring welder performance and welding activities Ensuring

activities are carried out according to QAP

. Ensuring proper application of welding and repair jobs

. Verification of Welding Report

. Final Visual inspection & Painting DFT Checking as per specified

standards

. Issuing NCR to the contractor found during inspection.

. Reviewing and signing final documentation

2. Tata Consulting Engineers(TCE)

Designation : Inspection Engineer (PMC)

Employment Type : Contract

Duration : September 2012 to February

2013

. Prioritizing and planning inspection of equipments in the plant

. According developing a prioritized inspection plan for the asset

. Assisting the client company to select cost effective and

appropriate maintenance and inspection tasks and techniques

. Suggesting the type and frequency of inspection for the asset

. Optimizing inspection activities based on risk analysis

. Employing RBI to ensure a proactive maintenance regime than a

reactive maintenance regime

. Giving priority of inspection of high probability and high

consequence (i.e. high risk) asset than to those with lower

consequences or risks

. Helping in reducing unplanned outages and repair costs

. Helping in lowering the risk profile of an asset's equipment

. Suggesting NDT activities like DPT, UT, R.T, RFET, IRIS, etc and

reviewing of RT Films whenever films come up for review after

the test

. Ensuring the repair activities are taken up using the relevant

procedure issued by TCE remedial suggestion team

. Inspecting Materials, their Identification as per applicable

codes & checking their Dimensions

. Identification of Pipes& MS Plates as per requirements on site

. Reviewing of Quality Assurance Plan(QAP),welding Procedure

Specification (WPS) & Procedure Qualification Record (PQR) and

Witness of Welder Qualification Test (WQT) according to ASME Sec

IX

. Monitoring welder performance and welding activities to ensure

work is being carried out in accordance with the approved

welding procedure.

. Ensuring activities are carried out according to QAP

. Checking of welding materials (Electrodes classification, Filler

Wire) and baking of Low Hydrogen Electrodes (Basic electrodes).

. Verification of Welding Report

. Suggesting application of proper painting techniques

. Final Visual inspection & Painting DFT Checking as per specified

standards

. Bring the non conformities to the notice of the

contractor/Client if found during inspection.

. Review final documentation and prepare inspection case sheet of

TCE

3. Lindinger Inspections Pvt. Ltd (TPI).

Designation : Inspection Engineer

Employment Type : Freelance/Retainer ship

Duration : May 2010 to Present

. Witness of Material Identification, Final Dimensional check and

100% UT for Claded Plates.

. Material Identification of Pipes& MS Plates and Final Visual

inspection & DFT check

. Review of Quality Assurance Plan(QAP),welding Procedure

Specification (WPS) & Procedure Qualification Record (PQR) and

Witness of Welder Qualification Test (WQT) according to ASME Sec

IX and reviewing RT Films

. Monitor welder performance and welding activities to ensure work

is being carried out in accordance with the approved welding

procedure.

. Witness of Pipe welding activities according to QAP

. Checking of welding materials (Electrodes classification, Filler

Wire) and baking of Low Hydrogen Electrodes (Basic electrodes).

. Verification of Welding Report

. Ensure the repair activities are taken up using the relevant

procedure

. Inspection of NDT activities like DPT,UT,RT Films

. Issue NCRs if any violation found during inspection.

. Prepare final documentation and inspection case sheet.

4. Hindustan Petroleum Corporation Ltd(HPCL).

Designation : Inspection Engineer

Employment Type : Shut Down Contract

Duration : June 2012 to August2012

. Witness of Material Identification, Final Dimensional check and

100% UT for Plates Pipes

. Review UT results conducted on existing plates/Pipes & confirm

the acceptance

. Inspections of Heat exchanger's, shell & tube bundles

. Witnessing RFET(Eddy Test),IRIS for tubes of heat exchangers

. Advising according to the situation whether retubing is required

as per consultations with Seniors &other department

. Witnessing Shell Test & Tube Tests

. Checking the gaskets, test jigs, blinds & plugging of defective

tubes

. Inspection of replacement of Reactors, Regenerators, Air Pre

Heaters(APH) like replacement of Riser Pipe, Hex-mesh inside the

Risers, Resco Refractory,plenum chambers cleaning/replacement,

nelson studs fixing, J bends, Cyclones replacement, spent

catalyst over over head well(SCOW),platforms replacement,

orifice pipe replacement, stripper trays,etc

. Inspections of Air Fin Coolers, Boilers, Columns.

. Advising relevant replacements if found not acceptable.

. Checking the dimensions, fit ups & issuing welding clearance for

the same

. Review of Quality Assurance Plan(QAP),welding Procedure

Specification (WPS) & Procedure Qualification Record (PQR) and

Witness of Welder Qualification Test (WQT) according to ASME Sec

IX and reviewing RT Films

. Checking of welding materials (Electrodes classification, Filler

Wire) and baking of Low Hydrogen Electrodes (Basic electrodes).

. Monitor welder performance and welding activities to ensure work

is being carried out in accordance with the approved welding

procedure.

. Witness of Pipe welding activities according to QAP

. Doing Weld Visual Inspections after welding & release for

D.PT/R.T

. Witnessing PWHT of spools as per code requirements

. Witnessing Hydro Tests of pipe loops, checking the blinds, new

replacements & vent& drain guages

. Follow up the repair activities using the procedure

. Inspection of NDT activities like DPT,UT,RT Films

. Issue NCRs if any violation found during inspection.

. Prepare final documentation and inspection case sheet.

5. Ion Exchange Engineering India Ltd.

Designation : Inspection/Expediting Engineer

Employment Type : Permanent-Location: Vizag

Project : Pressure Vessels

Duration : December 2011 to June2012

. Ensuring Quality& Timely completion of Vessels.

. Witness of Plate UT/MPT for shell plate, flanges & Dishends

. Checking the profile of ASTM516 Gr70 & IS2062 plates after

rolling and bending as per approved drawings

. Checking the bevel angles of plate edges

. Witness test for WPS/WPQ as per QAP

. Dimensional check for crown plate & petals after forming &

before taking to further fabrication

. Witness DP test on all butt weld joints

. Dimensional check of spherical vessel in two half before SR

. Witness Stress Relieving of spherical vessel in two halves

. Dimensional check of SS bottom strainer plate

. Review of RT films

. Dimensional check up of spherical vessel after complete

fabrication.

. Witness Hydro test of complete vessel

. Review of all documents as per QAP as per ASME Sec ll,V,Vlll,lX

. Appraise sub contractor of non conformities/deadline for

completion of Vessels

6. Cairn Energy India Ltd.

Designation : QA/QC Inspection Engineer

Employment Type : Contract (3 months)

Project : Onshore Oil & Gas Exploration

and Pressure

-Vessels & Pipelines

Onshore

Duration : September 2011 to December 2011

. Surveillance inspection of daily field activities and bringing

all critical issues, if any, to the notice of appropriate

authority.

. Doing joint walk around with construction quality before piping

hydro testing and inspection of supports, valve directions,

insulation, painting, corrosion coupon access fittings etc at

appropriate times.

. Performing line verification with P&ID, Isometrics before piping

hydro testing.

. Inspection of equipments (Internal & External) and pumps as per

specifications and standards.

. Verification of Construction punch list status before mechanical

clearance certification.

. Reviewing Technical Queries and review for acceptance

. Reviewing of PSV & PRV calibration certificates

. Verification of As-built drawings on field and its approval.

. Giving final clearance for accepting insulation works, painting

and corrosion coupon access fittings.

. Taking of Dossiers on behalf of operation's team and also

radiographic films and all other documents from construction

QA/QC Engineer.

. Monitoring & close out of all non conformities observed during

various construction stages / at site work.

. Follow up of all project and inspection related activities to

ensure that same being completed in time

. Review of all Inspection reports for work done at site

. Evaluation of Vendors and categorizing the Vendors based on

their Quality performance

. Providing day to day QA/QC inputs to all team members in

operations

6. East India Petroleum Ltd.

Designation : QA/QC Engineer (Client)

Employment Type : Permanent

Project : Storage Tanks, Pipelines

Duration : September 2010 to September 2011

Shop Fabrication:

. Witnessing UT for checking the thickness of plates for

fabrication

. Monitoring the cutting of the MS plates as per dimensions given

in the approved drawing

. Checking the bevel angles of plate edges

. Checking the profile of MS plates after rolling and bending as

per approved drawings

. Monitoring the cutting of Flanges & Blind Flanges for Manholes

and Gauge vents

. Monitoring the cutting of Pipes spools and joining them to

Tees/Reducers/Elbows according to the approved drawings.

. Checking the Quality of Welds using TIG/SMAW, ensuring proper

current,pre heat temperature, inter pass temperature, job

executed by qualified welders.

. Checking for any weld defects like undercuts, porosity, lack of

side wall fusion, slag inclusion arc strikes, mechanical damage,

etc and ensure their repair.

. Witnessing DPT on butt welds& R.F pads as per QAP

. Request 10 %Radiographic Test for completed spools& review the

films

. Ensuring proper handling and storage of pre fabricated and

fabricated plates

Site Fabrication/Erection:

. Surveillance and Monitoring of Fit-up, Long Seam and Circ Seam

welding of Shells for Tanks &Pressure Vessels

. Surveillance and Monitoring for Fit-up, Welding and back

chipping of Nozzles with reinforcement pads to Shells for Tanks&

Pressure Vessels as per the Orientation and drawings.

. Surveillance and Monitoring for Fit-up of Pipe to Flange,

Internal & External arrangements as per the drawings of

pipelines for Tanks.

. Witness of Performance test (Seat leak & Hydro test and the

Vacuum test)

. Witnessing of Hydro Test and review of documents like RT, DPT

reports, WPS, PQR & WPQT (Contractor VS-Engineers).

. Witnessing of Tensile, Bend, Hardness and Chemical tests as for

Inter Granular Structure checking of the Plate in case if test

certificates not available.

. Checking the Orientation of Inlet/Outlet Pipes, Manholes on

Shell and Roof, Bottom Drains and Recirculation Nozzle, Breather

Valves, Radar Gauges, Automatic Float Gauge, etc.

. Surveillance and Monitoring for Fit-up of Floating roof for

Tanks

. Surveillance and Monitoring for Fit-up of Sprinkler systems for

Tanks including water jet nozzles, splash plates, etc

. Witnessing the UT/D.P.T on weld joints as specified in QAP

. Monitoring the Laying out of Fire water lines and Foam Lines

. Checking the quality of painting

. Maintaining the proper sequence of paint application i.e.

Primer,MIO,Hi=build

. Collaborating with 3rd Party Inspectiors(Beaureau Veritas) for

maintaining the Universal Standards

Visakhapatnam Port Trust- East India Petroleum Project LPG

Blender Offshore

Project:

. Witnessing Pneumatic test for Packaged Natural Gas Metering

Skids 10 No's and Carrying out Mechanical and Instrumentation

tests as per approved procedure

. Witnessed stage Hydro & Pneumatic inspection tests for Pipe

spools of the Oil Metering Skids of Rating 300# & 150#.

. Witnessing of stage Hydro test of Valves for Gas Metering Skids.

. Document review for all the components like Ball Valves, Globe

Valves, PCV, Pipe fittings, Pressure & Temperature gauges,

Pressure & Temperature Transmitters of Gas Metering Skids.

. Witnessing the functionality and connectivity of the flow

computers installed in the Gas Metering Skid as per the approved

procedure

. Witnessing NDT/DPT on the relevant R.F pads and butt welds

7. Kalathil Brothers Company Pvt. Ltd.

Designation : QC Supervisor -Projects (2007-2008)

QA/QC Engineer-Projects (2008-

2010)

Client : RINL

Employment Type : Permanent

Duration : June 2007 to May 2010.

. Witnessed seat leak & Hydro test for Ball, Globe and Gate of

different sizes 8" to 24" for class 300#, 600# & 900# both

manual & motor operated.

. Inspection of pipe spools during fabrication i.e. fit-up,

welding, dimensional check.

. Witness/Review of Procedure Qualification Record (PQR), Welding

Procedure Specification (WPS) & Welder Qualification Test (WQT)

as per ASME Sec IX.

. Review of Radiographic films of Pipe spools.

. Surveillance and monitoring of piping fabrication and erection

activities/structures for platforms BW-26/33, BW-12/15 & BW-

46/51.

. Witnessed Pressure vessel inspection i.e. fit-up, Circ Seam

welding of Shells and Dish ends.

. Layout Inspection.

. Review of documents, Spool drawing, LHS and fabrication

procedures.

. Witness of NDT inspections (UT, PT, RT & MPT) as per ASME Sec V.

. Hydro testing, Pneumatic testing of pipe spools after

fabrication and erection.

. Witnessed hydro test of Pipes & Fittings at 10 bars at specified

holding time for different sizes and class.

. Line checking and punching during the test pack clearance,

Control final documentation (Test pack) and maintain records.

. Issue NCRs for violation found during inspection or any defects

found during Nondestructive Testing

. Issue of Release note to the Pipe spools once all the Inspection

activities completed as per ITP and found satisfactory.

Offshore:

Inspection during fabrication of Jackets & Pile of the structure includes:

. Welding procedure qualification as per AWS D 1.1.

. Welder Qualification Test (WQT).

. Witness of Tubular fit-up & welding and NDT.

. Witness of Visual & Dimensional check.

. Witness of Hydro test of legs of Jacket.

8. SANS Inspection Technologies

Designation : Project -NDT Supervisor

Employment Type : Trainee

Duration : December2006 to April 2007.

. Overall inspection activities prior, before, during and after

the welding.

. Carry out stage wise inspection in according with approval QAP,

and relevant client specifications and applicable standards.

. Raw material inspection, Inward material inspection receipt and

review of test certificates.

. To carry out various quality checks as per the approved quality

assurance plan.

. Conducting Welder Qualification Test (WQT) according to ASME Sec

IX.

. Control of welding material Electrode, Filler Wire, flux and

baking of Low Hydrogen Electrode.

. Conducting and Interpretation of Dye-Penetrant Test and Magnetic

Particle Test according to ASME SEC-V.

. Radiographic film interpretation and evaluation in compliance

With relevant codes and API 1104.

. Conducting Hydro test of pipes of different sizes and class.

. Ensure all NDT is done before the box up

. Issue of Material Clearance for the box up of the equipment by

successfully.

. Control and prepare final documentation and maintain records.

Personal Information

Name : MOHAMMED AZHARUL

ISHAQUE.

Father's Name : MOHAMMED MAZHARUL HAQUE.

Date of Birth : 30-10-1985.

Gender : Male

Nationality : Indian

Languages Known : English,

Hindi, Urdu, Telugu & Arabic

Passport Number : H0801966

Driving License Number : DLFAP2313592005

Permanent Address : S/o: Mohammed Mazharul

Haque,

D.No-10-7-62, Azeemabad,

Kanithi Road,

Gajuwaka, Vizag, AndhraPradesh, India

Yours Professionally,

M.A.Ishaque



Contact this candidate