Post Job Free
Sign in

Technician Maintenance

Location:
Clearwater, FL
Posted:
October 30, 2024

Contact this candidate

Resume:

Andrew Moden

*******@*******.***

**** ********* **

Alva, Florida 33920

843-***-****

Objective: Obtain a position as an Electronics Technician

Summary:

Seventeen years of experience in Nuclear Operations and Maintenance:

. Four years of experience as an I&C Maintenance Technician in commercial

nuclear power, including two years of teaching I&C skills and systems at

Waterford 3 Nuclear Station.

. Three years of operation and maintenance at the University of Arizona's

Research Reactor

. Ten years of experience as a Navy Electronics Technician.

Areas of Expertise:

Calibration and repair of mechanical, pneumatic and electronic

instrumentation and control systems

Including: Rosemount and Honeywell Pressure transmitters/smart

transmitters, Fisher level transmitters, controllers and AOVs, Barton

pressure transmitters/switches/local indicators, Westinghouse 7300,

ASCO/AVCO solenoids valves, and all basic I&C tech skills.

Competent in the use of Microsoft Word, Excel, Access, and Power Point.

Experience

2010-2012 Instrumentation and Controls Contract Technician

Dates and assignments attached

2008-2010 Waterford 3 Steam Electric Station I&C Instructor

Responsible for initial and continuing training for the Waterford 3 Nuclear

I&C Technicians.

Developed and administered qualification plan to certify I&C contractor

personnel to work independently on nuclear systems consistent with

increasing industry standards

Trained seven new I&C technicians, and twelve contractors to support

refueling outage

2005-2008: University of Arizona Research Reactor

NRC licensed Senior Reactor Operator- Supervised and operated research

reactor and related irradiation facilities for the University and National

Laboratory research projects.

Planned and performed scheduled and corrective maintenance on mechanical,

electrical and instrumentation systems including Rod Control, Nuclear

instrumentation, security, and protective systems.

Design and construction of irradiation facilities and nuclear

instrumentation systems

2001-2005 Navy Nuclear Power Training Unit Charleston, SC.

Conducted classroom, interactive group, and individual instruction covering

all aspects of nuclear plant operation with emphasis on plant

instrumentation and control

Shift Leader for Electronics technicians

1997-2001 USS Batfish (SSN-681) and USS Georgia (SSBN-729)

Reactor Operator, directly responsible for manipulation and control of the

reactor

Scheduled, conducted and supervised electronic technician maintenance

activities

Maintained Electronics shop replacement parts inventory.

1995-1997 Naval Electronics Technician Training

Received training including math, physics, thermodynamics, chemistry,

electrical theory, electronics, instrumentation, and controllers.

Contractor Experience

1/7/2013-Present I&C Supervisor - Brunswick (Progress Energy)

Installation and testing of solenoid valves for rod control system

11/12/2012-12/13/2012 Cyber security team - Brunswick (Progress Energy)

Identification of Critical Digital Assets (CDA)

Classification of CDAs

8/22/2012-11/4/2012 Journeyman Instrument Technician - Sequoyah (TVA)

Diesel generator instrumentation calibration

Westinghouse Eagle digital interface testing

Rosemount level transmitter calibration

4/9/2012-6/3/2012 Senior/Lead I&C Technician - Shaeron Harris (Progress

Energy)

Westinghouse 7300 alignment and testing

Fisher level controller grooming

Honeywell/Rosemount transmitter calibrations

Control relay time response testing

1/30/2012-4/7/2012 I&C Technician -- Brunswick 1 (Progress Energy)

Installation and testing of solenoid valves for rod control system

11/28/2011-1/27/2012 Production I&C Tech - Sanford Plant (FPL)

Operation of GE 7FA combined cycle plant

Maintenance on Ovation DCS systems

4/8/2011-5/16/2011 I&C Contractor - VC Summer Refueling Outage (SCE&G)

Westinghouse 7300 alignment and testing

Honeywell/Rosemount transmitter calibrations

3/1/2011-4/2/2011 I&C Contractor/AOV Technician - Brunswick 2 Refueling

Outage (Progress Energy)

Bettis/Fisher air operated valve actuator refurbishment

Solenoid replacement and retermination

Asssisted with flowscan/viper valve diagnostics

9/28/2010-2/18/2011 I&C Contractor Crystal River 3 Refuel/SG change out/EPU

outage for Progress Energy

Refurbishment of Graver condensate polisher control system

Ultrasonic Leading edge flowmeter installation and testing



Contact this candidate