** ***** ****** ******, ******* *****
**********@*******.***
Raymond J. Greene
Highly motivated and dependable assistant superintendent with 15 years of combined heavy
Professional
highway and site development experience. Worked with two of the most highly respected
S ummar
companies in the construction industry, Archer Western and Kiewit. Quality field experience
y combined with well-established knowledge of means and methods of productivity on multi-
million dollar projects. Supervised multiple crews at one time with crew sizes ranging from 2-
25 employees, in addition to sub-contractors. Seeking a long-term opportunity with a
successful heavy civil construction company with room for advancement.
December 2007-July 2012 Archer Western Chicago, IL
Relevant
Work
Assistant Superintendent
H istory 1. Supervised employees and sub-contractors on 16 million dollar project, Reagan National
Runway Extension, at Reagan National Airport in Washington, D.C.
2. Work included lightweight, flowable fill concrete, ground improvements, asphalt, drainage, and
concrete
3. Supervised 75-100 employees and sub-contractors on 135 million dollar project, I-75
Rehabilitation–Tift/Cook County, on Interstate 75 in Tifton, Georgia
• Work included twenty miles of interstate concrete removal and replacement,
including the addition of a new lane and barrier wall, new drainage and box
culverts, demolition and replacement of three bridges, asphalt, and earth work
April 1997 – September Kiewit Southern Omaha, NE
2007
Salary Foreman
4. Worked on 35 million dollar project, Alico Road, in Fort Myers, Florida
• Work included the demolition and replacement of north and southbound bridges
on Interstate 75 with new on and off ramps, new drainage and pre-cast box
culverts, excavation, and earth work
Hourly Foreman / MOT Supervisor
5. Worked on hydro-blast bridge overlay replacement of five bridges in Tifton, Georgia
• Work included hydro-blasting four inches of concrete and the replacement of new
concrete and asphalt
6. Worked on 28 million dollar project, I-20 Augusta Rehabilitation, in Augusta, Georgia
• Work included replacing thirteen miles of east and west-bound Interstate 20 and
demolition and shoulder widening while maintaining traffic
Worked on Augusta Bridge Overlay project in Augusta, Georgia
• Work included hydro-blasting and overlaying four bridges
• Due to bridge deterioration, the project was stopped for six weeks and new plans
for bridge removal and replacement were created.
Worked on 6 million dollar project, Warren County Ramp Replacement, in Warren County,
Georgia
•Work included the demolition, replacement, and widening of off and on ramps, east
and west-bound, for three bridges on Interstate 20
July 1999-August 2002: Hourly Foreman
October 1997-July 1999: Operator
April-October 1997: Laborer
Worked on 120 million dollar project, Interstate 26-Mars Hill, in Madison County, North
Carolina
•Work included twenty-six million cubic yards of excavation, two million cubic yards of
undercut excavation, sixty thousand feet of pipe ranging from six to one hundred
twelve inches, fourteen thousand feet of sixty inch pipe, four new bridges, and six
74 Cayde Circle Tifton, Georgia 31794
**********@*******.***
Raymond J. Greene
box culverts
•First foreman position was over an excavation spread, which included 14 D400
articulating trucks, 2 D10 bulldozers, D8 wide-track bulldozer, 2 Hitachi 1100
trackhoes, and 8 CAT-785 dump trucks.
74 Cayde Circle Tifton, Georgia 31794
**********@*******.***
Raymond J. Greene
Additional 1985-1997 Greene’s Satellite Marshall, North
Carolina
Work History
Owner
7. Installed and serviced satellite television systems
1981-1983 Christman and Parsons Spartanburg, South
Carolina
Carpenter’s Helper
8. Worked as a carpenter’s helper in cotton mills and the Community Cash grocery store chain
Training OSHA 30 hour
Excavation/Trenching Competent
Scaffolding Competent Person
MOT Supervisor Course - Expires 02-28-14
GSWCC Level 1A Certified Personnel (blue card) – Expires 05-11-13
References are available on request.
References