BRYAN BROWN
**** *. ******** **., ** Porte Texas 77571
(T) 832-***-**** (C) 832-***-**** (E) **********@****.***
Professional Summary
Planner/Scheduler with more than 30 years of experience planning, developing,
implementing and leading plant shutdowns and turnarounds.
Core Qualifications
Proficient Primavera P6 & SAP Strategic Workflow Planning
● ●
Proficient in Word and Excel Blueprint Reading/Analysis
● ●
● Preventative Maintenance Quality Control
●
● Layout Design & Development Isometric Creation & Interpretation
●
● Project management experience Pipes and fittings expert
●
Experience
04/2011 - Current THE TURNAROUND MANAGEMENT CO Houston, Texas
Scheduler
● Maintained field presence to verify job plan packages.
● Created summary bar charts and logic diagrams.
● Liaised with operations and management to keep them abreast of scheduling
issues and progress.
● Updated project schedule daily to allow team members to track progress.
● Optimized schedule to reflect plan modifications and progress.
● Promoted safety as a value and ensured all work activities met environmental
safety and health requirements.
● Established tool and equipment requirements for site activities.
● Ensured piping projects were executed in compliance with corporate
specifications, processes and procedures.
06/2010 - 02/2011 The Turnaround Management Company Houston, Texas
Planner/Scheduler
● Lead and facilitate the planning process
● Develop and maintain resource loaded critical path method (CPM) project
schedules
● Review schedules from company engineering, procurement, fabrication and
subcontractors and inputs data into the project schedule and provide feedback as
needed
● Progress schedules, analyze performance, conduct critical path analysis,
produce schedule reports and make recommendations for corrective action
measures which mitigate impacts to cost and schedule.
● Develop and update P-6 progress S-Curves for cost and man-hours
● Review subcontractors schedules
12/2007 - 12/2008 BIS TEPSCO ENG Deer Park, Texas
Senior Designer
● Executed the design and cost estimates of all plant piping project activities for the
turnaround project.
● Created comprehensive job plans including all necessary materials and project
time line.
● Designed ISO's for all transition piping pieces .
● Generated Bill of materials (BOM).
● Instrumental in development of the piping engineering packages.
● Identified critical path.
● Utilized scheduling software for all job plans.
12/2004 - 10/2007 Turner Houston, Texas
Maintenance Coordinator; Planner Scheduler; General Foreman
● Led regular stand-up meetings, events and continuous improvement projects
with measurable goals.
● Coordinated closely with quality control regarding products awaiting
dispositions.
● Maintained and enforced a safe and clean working environment at all times.
● Coordinated preventative maintenance on existing and new production
equipment, including routine calibration.
● Established and adjusted work procedures to meet production schedules.
● Supervised production schedules, production quality and on time delivery.
● Completed key projects on time, on budget and with a high level of accuracy .
02/2002 - 01/2005 Certified Technical Services Pasadena, TX
Construction Coordinator
● Organized, prioritized and managed plant maintenance projects to keep
facility safe, efficient and clean.
● Created workforce planning and development models to inform quarterly
scheduling and processes.
● Coordinated ongoing maintenance and housekeeping of the plant.Coordinated
procedures for facility and equipment maintenance or modification, including the
replacement of machines.
● Reviewed processing schedules and production orders concerning inventory
requirements, staffing requirements, work procedures and duty assignments,
considering budgetary limitations and time constraints.
Education
Professional Development
San Jacinto College: Welding Inspection Technology
Lee College: 144 Hrs. supervisory training
Turnaround Management Comapany: 40 hours P3
NCCER: Craft Trainer; Pipe Fitting and Welding
Hellier Technical: Level II PT and VT