Post Job Free

Resume

Sign in

Power Plant Electrical

Location:
Schenectady, NY, 12309
Salary:
80000
Posted:
February 14, 2013

Contact this candidate

Resume:

RAJESH PADMANABHAN

Bachelor of Engineering-Electrical & Electronics

** ** ********* *** ****, NISKAYUNA, NY-12309

Mobile: 518-***-****

Email: aboda1@r.postjobfree.com

CAREER OBJECTIVE:

To constantly upgrade my knowledge, skills and make a difference in

whatever I do with better result.

Core Competency:

> 7.6 years experience in electrical engineering and achieved to

become a Team lead, leading a team of 7 Electrical Engineers &

Designers who work on Detail engineering (MSD team), one lines,

and Cable Interconnect & Proposal drawings.

> Good Working knowledge in HT systems (Up to 132KV) & LT systems

(Up to 440V) Electrical power system design and detail

engineering which includes preparation of KSLD, Performing

design/sizing calculation, Preparation of Technical

specifications for ordering electrical equipments, Vendor

drawing approvals and Commissioning support for smooth run of

the project using SMARTPLANT ELETRICAL/INSTRUMENTATION TOOL,

Auto CAD etc.

> Good in cost control, Ontime delivery, achieving team goals &

showing better results in the project.

> I can challenge Cable Sizing Calculation, Transformer Sizing,

NGT/NGR sizing Calculation, CT/VT sizing calculation, Bus duct/

Bus bar sizing calculation, Battery Sizing Calculation, Short

Circuit calculations, Load flow, voltage drop, transient motor

starting and harmonic studies.

> Good Knowledge in usage of PLM and ERP Tools.

> Good use of standard and codes like IS, IEC, IEEE & ANSI.

> Preparation of Layout drawings which includes Earthing, Cable

tray, Lightning & Lighting system of power plant and substations

with AutoCAD.

> Support Sales Team by doing Proposal documents, DBR & KSLD

drawings for Client Kick of meetings and win orders.

MAJOR SYSTEM/TOOLS HANDLED:

SYSTEM VOLTAGE/ POWER RATING TYPE YEARS OF

EXP.

SUBSTATION UPTO 132KV DOUBLE BUS BAR system 5 years

POWER PLANT UPTO 15 MW THERMAL & WASTE HEAT 5 years

RECOVERY BOILER

POWER PLANT UPTO 600 MW GAS TURBINE 2.5 years

HT & LT SWITCHGEAR 110V TO 33 KV 2 BKR- BUS COUPLER/ RELAY 7.5 years

AND CONTROL PANELS PANELS

HT & LT TRANSFORMERS 400V TO 110 KV OIL FILLED / DRY TYPE 7.5 years

PLC/DCS 24V DC TO 110/230V SIEMENS, ABB, AB, 5 years

HONEYWELL.

SMARTPLANT tool INTERGRAPH SPI/SPEL 3 years

PLM - ENOVIA 3 years

PRIMARY RESPONSIBILITIES:

TATA CONSULTANCY SERVICES: 2.7 years + (From 30.06.2010 to Till present)

ROLE- TEAM LEAD

Working in GE Company as Contractor with H1 B VISA at Schenectady, NY from

15-Jun-2012.

. Preparation of overall single line diagram and electrical distribution

scheme for HT/LT system of 600 MW Gas Turbine Power Plant.

. Design and perform sizing calculation for transformer, Bus duct, CT &

PT, HT & LT cables, battery & battery charger, Lighting, Earthing and

Lightning system

. Preparation of Single line diagram, Schematics drawings, Cable

schedule, Interconnection schedule using SMARTPLANT ELECTRICAL tool.

. Preparation of electrical tender specification for various electrical

equipments

. Technical evaluation of offers submitted by package vendors.

. Review/Approval of vendor GA /schematic drawings for transformer, bus

duct, control panel, relay panel, HT, LT switchgear and motors.

. Good knowledge in PLM process and day to day Job monitoring/control

and schedule using PLM.

. Resolving RFI/PAC Case from site.

. Managing 7 member team by providing technical direction, support and

information to engineers, designers and drafters

THERMAX LIMITED: 2.5 years (From 15.11.2007 to 24.06.2010)

ROLE:ELECTRICAL ENGINEER

. Conceptualization of electrical power distribution network &

preparation of key single line diagram using AutoCAD.

. Prepared electrical design basis report and a good Cost Estimator.

. Preparation of specifications for electrical equipments.

. Preparation of electrical load list & load distribution scheme for

PCC, MCC.

. Preparation of electrical equipment layout for switch yard, substation

& electrical rooms.

. Preparation of cables schedules, motors control schedules,

interconnection schedules & lighting Schedules.

. Design & Detail Engineering of AIS Substation upto 132 KV (part of

power plant).

. Preparation of Instrument List, IO list, IO configuration for PLC/DCS.

. Review /approval of vendor drawings like PLC panel GA, Hookup dwgs,

P&ID etc.

. Preparation of Motor starters Control Schemes.

. Preparation of tender for supply & installation document for power &

grounding, lighting.

. Sending enquiries to vendor using ERP (Oracle based tool)

. Reviewed the offers of different vendor & preparing the technical bid

analysis.

. Review/ approval of vendor drawings/documents.

. Provided Electrical inputs to Civil, Piping, and Process &

Instrumentation Teams.

. Continuous Interaction between Site & Projects Team for necessary

updation in projects.

. Prepared as installed drawings.

. Keeping a detailed and up to date status of orders and preparing

timely reports.

. Erection & Commissioning support through Site visits with projects

team for meeting Clients, Contractor and Vendors.

. Good use of IS, IEEE & IEC Standards

. Successfully commissioned power projects in India - JKWC (7.5 MW),

BRFL-D (4.5 MW), BRFL-T(8 MW) & HKML(12 MW), SML(12 MW), DSPL(8 MW),

BESL(2 x 10 MW ) & Apple Sponge (12 MW).

JSW-SOUTHERN IRON & STEEL COMPANY: 2.5 years (From 04.07.2005 to

15.11.2007) ROLE: ELECTRICAL ENGINEER

. Review of tender/Basic design documents and do the detail

engineering per site conditions..

. Preparation of BOM for Electrical & Instrumentation system of Steel

Plant.

. Preparation of system SLD using various protection relay

schemes.

. Power cables, Bus bar selection & sizing calculation

. Project Cost Estimation

. Preparation of Instrument List, IO list, IO configuration for PLC/DCS

. Review /approval of vendor drawings like PLC panel GA, Hookup dwgs,

P&ID etc.

. Preparation Cable trench Routing drawings, section view drawings

etc.

. Preparation of cable schedule, interconnecting schedule.

. LT Transformer, Battery, CT, VT & Cable sizing calculation etc.

. Preparations of DC load list & sizing calculation for battery,

battery charger.

. Review/approval of drawings of brought out items like LV/MV

breaker, AC & DC Distribution boards.

. Installation, Erection & Commissioning of Electrical system in

550 M3 BLAST FURNACE Project.

. Final documentation/As Built Drawings preparation for the project.

. Good use of AutoCAD & ETAP tools.

ACADEMIC CHRONICLE:

. Bachelor of Engineering - Electrical & Electronics in Anna University

from 2001 to 2005 with 73% score.

. Higher Secondary-Jaycees Mat. Hr Sec School in State Board from 1999

to 2001 with 91% score.

. SSLC - Railway Mixed High School in Anglo-Indian Board from 1998-1999

with 86% score.



Contact this candidate