Michael Faustino
Project Controls Engineer at Fluor
abn0ch@r.postjobfree.com
Summary
More than 10 years of progressive experiences in a field of
Civil/Structural/Architectural, Mechanical, HVAC, Piping, and E&I for
various construction companies.
Experienced as Project Engineer, Steel Detailer, Field Engineer, Mechanical
- Structural Supervisor, and Project Controls - Planning, Scheduling,
Quantity Surveying, and Estimating using combine experiences gained from
previous projects such as progress evaluation, invoice processing, material
take-offs for Electrical and instrumentation, Piping System, Mechanical
Equipment, HVAC, and Civil/Structural/Architectural. More so, the
application of Unit Rates to Re-measurable Contracts, progress updating in
P6, narrative reporting, and Progress Measurement System Development and
Implementation. Also, it includes generating progress report utilizing the
functions of excel spreadsheet (i.e. if, sumproduct, sumif, pivot table,
vlookup, hlookup, bar chart, s-curve and manpower histogram and other
advance formula to control and monitor the physical construction progress).
Gained valuable experience in a variety of Civil/Structural/Architectural,
Piping Systems including CS, SS, FRP, GRE & GRV together with the
Electrical Distribution (HV, MV & LV).
Working in a Multi Disciplinary QS / Estimating group provided valuable
support and learned how to develop and verify rates using different
references such as RS Means Cost Data, Richardson, Timberline, and NECA.
Experience
Project Controls Engineer (Progress and Change Management) at Fluor Mideast
Ltd.
October 2011 -Present (1 year 2 months)
1.Consolidate report of EPC contractor daily, weekly and monthly. 2.Review
and verification of Physical Construction Progress at site. 3.Review and
evaluation of monthly submittal of P6 schedule. 4.Provide the PMT/PMC
management an extracted schedule from P6 to PDF per construction areas.
5.Verifying actual quantity base reporting submitted by EPC contractor.
6.Establishing production outputs pricing the crew against contract rates
and discussing same with EPC contractor to establish New Unit Rates
-Subject to Client approval. 7.Consolidating progress measurement system
by area/unit/discipline wise. 8.Development and Implementation of Progress
Measurement System (Excel Spreadsheet) 9.Development of Manpower Histogram
and Construction Progress S-Curves. 10.Provide the PMT/PMC management
Physical Construction Progress per area,unit, building and discipline to
give them indication which items are being overrun and underrun.
Quantity Surveyor -Electrical at Daewoo Engineering
March 2011 -July 2011 (5 months)
1.Preparation of daily, weekly and monthly progress.
2.Prepare quantity take-off (Lighting, Fire Alarm, Telephone, Lan, PA/GA
System, Electrical Distribution
(HV, MV & LV) and verifications of completed items.
3.Update data (cable schedule and others) using vlookup & hlookup, create
report by pivot table and if
functions in excel spreadsheet as necessary.
4.Daily consolidation of BOQ made by contractor.
Quantity Surveyor/Estimator at Fluor Arabia Ltd.
July 2008 -July 2010 (2 years 1 month)
1. Developing a Method Statement. 2.Establishing production output pricing
the crew against contract rates and discussing same with contractor to
establish New Unit Rates -Subject to Client approval. 3.Reviewing and
Evaluating Variation Orders submitted by contractors. Capable of rating
new items (labor, Equipment & Material) using different estimating
references such as RSmeans, Richardson, NECA and various references as per
actual experiences in previous projects. Negotiating and agreeing final
measurements with the Contractors and the Client. 4.Advise Planners to
schedule impact cause by variation order estimates (addition, deletion or
modification). 5.Responsible for coordinating quantities take-off for all
works in Petrochemical Project. This includes quantity take-off for
piping, equipment, resources, piping insulation, steel work, architectural
finishes, HVAC etc 6.Ensures the proper application of the applicable
Method of Measurement (MOM). Studying Contract specifications and
procedures and identifying additional work not accounted for in the BOQ
and MOM.
7. Reviewing and evaluating progress measurement to certify the
correctness of invoice.
Field Engineer / Mechanical-Structural Supervisor / Quantity Surveyor at
Atlantic Gulf and Pacific Office of MANILA (AG&P)
February 2007 -June 2008 (1 year 5 months)
1.Identifies construction work activities.
2.Estimate duration for each activity.
3.Identifies relationships between activities.
4.Determines appropriate work sequence.
5.Prepare schedules and generate to P3 and monitor schedules.
6.Identifies variances and recommends corrective actions.
7.Assists in the preparation of progress reports.
8.Determines engineering scope requirements to support the estimating and
cost control planning.
9.Performs quantity take-off (pipes spools, valves, fittings, flanges,
pipe specialties, instruments and pipe
supports) and verifications.
10.Develop and applies unit rates for cost estimates.
11.Assists in cost reporting and forecasting.
12.Prepare budget in accordance with code accounts.
13.Evaluates cost impact of change.
14.Performs cost and commitment tracking. 15.Performs home office man-hour
and control system. 16.Liaises with the controller on interpretation of
accounting data.
Steel Detailer at Atlantic Gulf and Pacific Office of MANILA (AG&P)
April 2006 -January 2007 (10 months)
1.Prepare model structure as per client design drawings to Tekla
Structures 11.2. 2.Analyze and performs connection details as per
Engineering and Client standard drawings. 3.Prepares erection and
fabrication drawings in AutoCAD both 2d and 3d presentation. 4.Prepares
necessary revisions cause by design complications. 5.Accommodates
questions from production staffs regarding issued drawings during
fabrication and erection. 6.Prepare Piping Isometric drawing.
Project Engineer at GRV Contracts Corporation
October 2004 -March 2006 (1 year 6 months)
Maynilad Water Services, Inc. & Manila Water Company, Inc Various Projects
(Installation of Underground Water Pipes)
1.Prepares project plans (PERT/CPM & P3), work method statements, project
programmed, s-curve, manpower & equipment schedule and material registers.
2.Organization of project resources such as labor, materials, sub-
contractors and equipment. 3.Assisting the project manager in managing the
construction site. 4.Preparation of site investigation report for
confirmation of shop/fabrication drawings. 5.Direct supervision of weld
fabrication of pipe bend to insure that the quality of works will be
maintained and it will conform to approved fabrication drawings.
6.Controlling and monitoring project performance in accordance with the
requirements and directives of the project manager.
Project Engineer at AVI Construction Corporation
July 2003 -September 2004 (1 year 3 months)
Maynilad Water Services, Inc. & Manila Water Company, Inc Various Piping
Works Projects
1.Preparation of progress measurement by daily, weekly and monthly.
2.Prepare bid documents and study awarded contract for execution.
3.Consolidate quantities submitted by field engineers. 4.Prepare progress
payment certificate for submittals at client. 5.Verify the in & out of
billing collectibles. 6.Certify the progress billing made by sub-
contractor.
Project Engineer at Cybernetics Construction Corporation
May 2002 -June 2003 (1 year 2 months)
Maynilad Water Services, Inc. & Manila Water Company, Inc Various Road
Restoration Works Projects
1.Prepare daily log for activities and usage of manpower, materials and
equipment. 2.Prepare progress report in preparation of monthly billing
submittals.
Skills & Expertise
Project Controls Earned Value Management Quantity Surveying Estimating
Change Management Planning Scheduling Primavera P3-P6 Progress Measurement
System Development Excel Spreadsheet -pivot table, if, sumif, sumproduct,
vlookup, hlookup Steel Detailing (Tekla Structures & Autocad)
Education
Tarlac State University
Bachelor's degree, Civil Engineering, 1996 -2002