Scott T. Harris
Charlotte, NC 28206
301-***-**** ************@*****.***
SUMMARY
Highly motivated hands on Manufacturing Engineer with proven ability to
reduce operational costs and risks. A proven team player with excellent
analytical, and communication skills. Deadline-sensitive contributor that
utilizes broad knowledge base to solve problems and eliminate repeat
issues. Self-directed producer who takes initiative to overcome challenges
while collaborating with multiple levels to achieve results. Highly
proficient in projects pertaining to cycle time analysis, scrap reduction,
and cost reduction. Expertise in:
Tooling Modification/Design Professional Engineer
(Pro-E)
Brazing and Welding AutoCAD
Basic Electrical Trouble Value Stream Mapping
Shooting
Professional EXPERIENCE
Carrier Corporation, Charlotte, NC 2008 - 2009
Manufacturing Engineer
Performed monitoring, trouble shooting, and improved manufacturing lines
which assemble industrial HVAC chillers. Created manufacturing line
layouts, including current and future state drawings utilizing AutoCAD
software. Managed weekend work crews to assist in implementing continuous
improvement, and 6-S projects.
. Co-led project to combine two chiller products onto the same production
line, yielding additional floor space to accommodate new products, in
addition to 100% on-time delivery the following month.
. Assisted in start up of new 410A refrigerant splits product, including
several prototype builds and quality document brainstorming events
resulting in a smooth product start up.
. Awarded Carrier Bravo award for outstanding team work
Dynax America Corporation, Roanoke, VA 2006 - 2008
Manufacturing Engineer
Managed manufacturing line efficiency and productivity for Ford, GM, and
Honda friction, and differential disk lines.
. Reduced bond strength failures, drastically, by implementing machine
improvements which measured overall plate thickness in relations to bond
strength and increased customer satisfaction.
. Reduced defective plates on Ford line 99% by implementing re-design and
modification of tooling.
. Reduced cycle time 10 seconds by analyzing the GM sizing operation and
modify processes.
. Reduced consumption 21% through leading a project to reduce plant wide
compressed air consumption by upgrading all blow off processes to air
knives, and repairing air leaks.
. Redesigned plant wide prototype process ensuring prototype parts were
documented and traceable resulting in ability to trace and correct
prototype failures quickly and effectively.
Scott T. Harris Page Two
EDUCATION
MM, Project Management, Devry University, estimated graduation May 2012
BSME, Virginia Polytechnic Institute and State University (Virginia Tech),
Blacksburg, VA, 2006
SKILLS
AutoCAD / Mechanical Desktop
Professional Engineer (PRO-E)
Microsoft Excel
Microsoft Word
Microsoft PowerPoint
Microsoft Outlook
Mini-TAB
German language skills
ASSOCIATIONS
Member of ASME, 2007 - Present
Member of SAE, 2007 - Present
EMPLOYMENT LOCATION
Willing to relocate
Willing to travel 40%