OBJECTIVE: Seeking Manufacturing Engineering position.
SKILLS:
. Worked side by side with maintenance and tool room personnel in
repair or modify of production equipment.
. Exceed at troubleshooting electrical and mechanical machinery
and improvising temporary and permanent solutions.
. Implemented process and product cost reductions by applying
lean technology techniques.
. Computer and AutoCad literate.
EXPERIENCE:
May 2004/Apr 2009 Production Operator
Royal Technologies - Hudsonville, MI
. Ran injection molding machines and ancillary machines.
. Provided continuous process improvement ideas that were
implemented to save time and money.
Apr 2002/Apr 2003 Manufacturing Engineer RAN Tubular
& Metal Products - Grand Rapids, MI
. Developed machining, forming, and robotic welding processes for
$250,000/ yr. tubular/stamped automotive structural brace
. Provided production support in repairing and maintaining
equipment and ordering of supplies.
Feb. 2000/Nov. 2001 Eng. Account Manager Automatic Spring
Products Corporation - Grand Haven, MI
. Designed springs, quoted new business (costed
materials/coatings/processes), managed prototypes, and resolved
quality issues (corrective actions).
. Reduced prototype delivery timing from two weeks to one week.
. Designed inspection gages that eliminated 200 hours of
production time per year.
Oct 98/Feb 2000 Process Engineer
Track Corp. - Grand Haven, MI
. Reduced assembly costs 28% as Kaizen team member for seat
adjuster.
. Designed PLC based rivet assembly station reducing manpower
from three operators to two per shift saving $35,000 on first
shift annually.
. Designed & implemented new ergonomic pneumatic control arms
that increased build rate from 55 to 90 units per hour saving
$42,000 per year.
. Designed PLC & pneumatic based assembly station that eliminated
one operator per shift and eliminated downstream rejects.
Feb 95/May 98 Manufacturing Engineer
BLD Products Ltd. - Holland, MI
. Launched tooling side of fuel pressure regular line of 46
different parts simultaneously. Coordinated tooling design,
testing and process equipment approval, PPAP sample runs.
. Consolidated springs and stampings on fuel pressure regulator
line saving $82,000 per yr. in part costs.
. Part of team that qualified fuel pressure regulator line one
month ahead of schedule and $400,000 under budget.