Harvi Sethi
Westborough, MA *****(Renter/open to relocation) 508-***-****
**********@*****.***
Internal principal consultant / Innovative, result driven global leader
with 19+ yrs of broad based background in finance & banking, retail,
energy, engineering, manufacturing & supply chain. Have excellent
leadership ability to deal with all levels of organization including C-
level executives & effectively build cross-functional consensus among key
stakeholders to achieve desired results through change management.
Recognized for cost reduction, organic growth, & ability to bring value to
customer through strategy deployment & process/product transformation.
Lean Sensei / TPS -Value, Flow, Pull, Business Process Management
Perfection Innovation Strategies (TRIZ)/ Risk Mgt.
Kaizen / Teach & Mentor Lean, Six
Sigma(1000+) Business Strategy / Planning / Model
Lean & Six Sigma (Certified Master Financial / Simulation Modeling
Black Belt) Balanced Scorecard / KPI, KRI, KCI
Design for Lean & Six Sigma (DMAIC, Report Design
DFSS) IT - Technology Implementation
Transactional / office lean six sigma (ERP/BPM/BRE)
experience Front / Back Office Reorganization
Hoshin Planning/ Change Management (BPO) / SCOR
Enterprise wide Program / Project Mgt. Capacity Planning / P & L
(PMO) responsibility
Global Best Practices / Benchmarking
KEY ACCOMPLISHMENTS
. Reduced overtime 80% & savings of $ 7M by streamlining & automation of
collateral and bond processes
using BPM/BRE at Wells Fargo.
. $ 100M PSCR reduction by optimizing the energy (power) trading mix - real-
time, day-ahead, short-term,
long-term, & structured trading at DTE Energy resulted in $10/household
. Order to Cash 75% cycle time reduction & savings of $ 25M by redesigning
End-to-End processes at Visteon.
EXPERIENCE
Hetke Consulting Inc., MI
Sep.'09- Present
Independent Consultant on various Lean, Six Sigma and Benchmarking
projects.
1 AVERY DENNISON - Retail Information Services, Framingham, MA
Mar.'09 - Aug. '09
Global Enterprise Lean Sigma Champion Consultant /Global Business Processes
/ Operations (reported to sr. vice president operations) - Part of global
resource reduction Sep '09
Led Hoshin Kanri along with C-level executives to develop global continuous
process improvement strategy / implementation & managed 20 projects using
enterprise project mgt. and managed global staff of 10 individuals.
. Increased speed & improved quality among regions by implementing global
measurement system & SOP's/SWI, sharing global best practices and
communize the global processes across Retail Information Services.
Expected savings of $ 10M .
. Achieved global product consistency & reduced the cost by redesigning End-
to-End Global Supply Chain Process (procurement and sourcing) from
decentralized process to hybrid process (Centralized - Global level
& Regional level and decentralized - site level). Expected savings of $
5M.
. Expected Annual savings of $ 15M.
WELLS FARGO - Corporate Trust Services, Columbia, MD
Jul '07 - Feb.'09
Global Vice President / Process Excellence Consultant / Structured Finance
(reported to sr. vice president operations) Worked with C-level executives
to deploy continuous improvement strategy / implementation using Hoshin
Planning & developed "Extended Value Stream mapping" to select, manage, &
track top 40 projects to increase efficiency across Collateral and Bond
processes using enterprise project mgt. Managed global staff of 15.
. Reduced loan accounting rejection-60% & cycle time-50% resulted in $ 6M
savings by redesigning End-to-End process.
. Reduced bond processing rejection at first / second level inspection &
cycle time reduction for processing bonds by 50% leading into savings of
$ 5M.
. Generated savings of $ 1.5M by implementing Measurement System across
entire Corporate Trust Services (RMBS, CMBS, ABS, CDO's) to measure value
added vs. non-value added activities across process & further sharing
Best Practices across client teams.
. Generated 98% automated process & reduction of overtime by 8000 hrs/month
& savings of $ 7M by developing ideal process using BPM (Lombardi
Software), BRE (Pegasystems) & BI for- loan accounting, default, bond
processing,
& loss tracking processes.
. Taught Lean Six Sigma Green/Black belt courses (20 BB, 50 GB, 200+
mentor/coach & conducted 50+ Kaizen)
. Annual savings of approx. $ 19.5M
DTE ENERGY- Energy Trading, Ann Arbor, MI
Jun. '04 - Jul. '07
6 Operating System Manager / Deployment Consultant /Master Black Belt
(reported to vice president operations)
Deployed & implemented Lean & Six Sigma strategy for Energy Trading,
Generation Optimization & Distribution group, tracked/managed 60+ projects
related to revenue growth & efficiency and managed staff of 8 individuals.
. Led to $ 50M revenue boost & optimized Energy (power) Trading Structure
Transaction process.
. Resulted into $ 50M savings by developing/implementing performance center
to monitor equipment reliability that led to better business transactions
of sale/purchase of power.
. Resulted in $ 30M savings/yr by maximizing value of capital expenditure
for long & short-term investment
& analyzed required return, led in more reliability & power transaction.
. Generated $ 25M saving & optimized bidding strategy for buy/sell of power
using classical Design of Experiments in MISO (Power Mkt.).
. Reduced 50% cost in Generation optimization area using DFLS in
collaboration with McKinsey & Co.
. Optimized natural gas distribution process(call center/customer service)
led to 99% time commitment.
. Trained 50+ leaders, 60+ Black Belts, 200+ Green Belts, mentored/coached
1000+ individuals & conducted 70+ Kaizen for various Lean & Six Sigma
projects.
. Annual utility bill reduction by approx. $10/ household.
VISTEON CORP.(Formerly Ford Motor) Corporate Strategy / Business
Development / M&A,MI 1997 - 2004
7 Corporate Strategy Deployment Leader / Black Belt - Finance, HR, Customer
Service (reported to director corporate operations)Led Lean Six Sigma
deployment, project selection for Corporate Strategy / Planning, Finance,
Communication, Taxation, Government Affairs, Human Resources & Customer
Business Group (CBG).
. Reduced number of defects by 80% that resulted in savings of $ 4.5M (soft
savings/cost avoidance)
& improved the internal communication system process using Lean/DMAIC.
. Resulted in savings of $8 mil by increasing return on investment
incentives from state & federal government. Increased incentives from 1%
to 5%.
. Resulted in savings of $ 15M by optimizing link between Customer Business
Groups (CBG) & Order to Cash.
. Managed & led Corporate "HOSHIN" breakthrough team.
. Annual savings of approx. $ 23M.
Global Corporate Strategy, Business Development, M&A Mgr (reported to
director strategy)
Worked with senior management & board of directors to
develop Corporate Strategy Process & Scenario Planning
Studies to support Visteon's business model.
. Led team along with investment bank & research institutions. Responsible
for developing strategic intelligence, competitive profile, financial
analysis & scenario planning studies for global business opportunities.
This supported negotiation process for sell/buy/swap portfolio.
. Generated revenue of $ 2.8M by constructing business vision, strategy,
planning, & forming Telematics
& Multimedia group.
. Directed Visteon towards development of hybrid vehicle components by
constructing a business vision
& strategy for Visteon's participation in hybrid electric vehicle.
. Led team to develop process/strategy to grow sales revenue of non-
automotive related businesses including electronics.
. Developed Technology Implementation Plan to support selection &
commercialization process of new technologies based on prioritization of
business plan initiatives & future investment matrix. Commercialization
process directed funds towards high growth technologies.
. Led formation of engineering development centers outside US & reduced
engineering cost by $ 50M by working with senior management to develop
business plan for divisions, regions to support Visteon Corporate
Strategy for low cost engineering centers.
. Annual savings of approx. $ 50M
FORD MOTOR COMPANY Exterior Systems Design Engineering- Dearborn, MI
1989 - 1997
Senior Product Design Engineer - Exterior Systems and Electronics (reported
to manager design)
Developed & implemented design for bumper technologies enhancing vehicle
performance across product lines.
. Generated savings of $ 30M by developing knowledge based eng. (KBE) for
front-end system.
. Increased occupant safety by redesigning front-end system to support 40%
offset crash.
. Resulted in savings of $ 33M by designing & developing prototype of steel
inserted blow molded front-end system to support intelligent
transportation systems.
. Annual savings of approx. $ 63M.
Sr. Manufacturing Engineer (reported to manager manufacturing)
. Resulted in inventory savings of $ 5B by decreasing Order to Delivery
(OTD) cycle time for vehicle across all assembly plants by improving End-
to-End process with inside & outside suppliers to support vehicle
sequence at Wixom Assembly Plant.
. Optimized vehicle assembly sequences process using discrete manufacturing
simulation & presented results to senior management.
. Annual savings of $ 5B across all the assembly plants worldwide.
EDUCATION:
MS Industrial and Systems Engineering University of Michigan, MI.
MBA Finance / Operations Research
University of Delhi - India
BS Manufacturing / Production Engineering
Birla Institute of Technology- India
PROFESSIONAL DEVELOPMENT / CERTIFICATIONS:
A3, continuous flow, learning to see, seeing the whole,
creating level pull, material flow - Lean Enterprise, 2009
Lean Training
Wells Fargo, MD 2008
Project Management Training
Wells Fargo, MD 2007
Lean Training/Cube innovation/Institute of Lean Innovation
DTE Energy, MI. 2005
Certified Lean Six Sigma Master Black Belt - Int'l Quality
Fed (IQF) Ford/Visteon MI. 2003-04
Certified Lean Six Sigma Black Belt - Six Sigma Academy
Ford/Visteon MI. 2001-04
Quality Training Ford Motor, MI. 2000
Lean Transformation Training
Ford Motor, MI.
1999
PATENTS, HONOR & PUBLICATIONS:
Patent: Light Truck Tailgate Assembly -1999 (Patent # 5,947,540) - Ford.
Patent: Steel Inserted Blow Molded Bumper System - 1997 (Patent #
5,658,027)- Ford.
Nominated for Ford Technology award for developing a "Knowledge Based
System for bumpers" 1996.
Publication: Simulation of Transient Conjugate Heat Transfer to Improve
"Door Trim Mfg" 1994.
Teaching Assistant-Taught Engineering Statistics classes at
University of Michigan-Dearborn 1988-1989.