MUHAMMAD ASAD (BE MECHANICAL) EXPERIENCE: * YEARS
PLANNING AND PROJECT CONTROL ENGINEER
. Certified in Primavera 6.7 from Chicago Training Institute, Abu Dhabi,
United Arab Emirates.
. Certified in Spoolgen from Intergraph Middle East, Abu Dhabi, United
Arab Emirates.
. Certified in IMIST (International Minimum Industry Safety Training)
from OPITO, Abu Dhabi, United Arab Emirates.
CURRENT LOCATION: ABU DHABI, UAE
Cell # +971-**-***-****, +923*********.
E-mail: abmigw@r.postjobfree.com
CAREER OBJECTIVE
. Mechanical/Industrial Manufacturing Engineer with an ability to
analyze Complex Engineering problems, evaluate and recommend
alternatives and communicate the recommendation effectively.
. Eager to acquire a challenging position in the esteemed organization
as a professional engineer equipped with strong technical &
interpersonal skills and an overriding commitment to safety and
environmental responsibility.
. To associate with an industry that is rapidly expanding and support it
with all the professional skill & knowledge, thereby become partners
of success and to play the assigned role with an aim to go further
professionally.
BRIEF JOB HISTORY
Period Employer/Contractor Client / Location Owner Project Position on
Project Designation Jan 14 to Present DESCON Engineering, Abu Dhabi,
UAE BOROUGE BOROUGE EPC PO Flare Recovery Project, Ruwais, UAE, $ 90M
Planning/
Spoolgen
Engineer Assistant
Engineer Nov 13-Dec 13 DESCON Engineering, Abu Dhabi, UAE JV of
Tecnimont & Samsung ONSHORE BOROUGE Polyolefin expansion project -
3A,Ruwais,UAE, US $ 64M Planning
Engineer Assistant
Engineer July 12-Oct-13 DESCON Engineering, Abu Dhabi,UAE ENI Saipem,
Italy
ONSHORE AL-HOSN GAS Shah Gas Development (SGD ) Hameem, UAE Planning
Engineer Assistant Engineer Jan 12-June 12 SEFEC Engineering
Futehally Chemicals
UNILEVER PROJECTS NSD Building Extension and Spray Drying Tower, PAK
Assistant Planning Engineer Trainee Engineer
BRIEF JOB PROFILE:
Oil and Gas, Petrochemicals and Construction experience at various levels
primarily focused on, Cost Estimation & Control, Project Planning &
Control, Project Management, Field Engineering, Equipment's Installation
& Structural Engineering. Involved in various clients on Project like
GASCO, BOROUGE, JGC, Samsung, TECNIMONT, ENI SAIPEM, AL-HOSN GAS.
Cost Estimation and Control:
. Experience with strong academic background in Cost Estimation and
Control, Fully understand the estimating classifications as per AACEI,
Cost Estimating methods, Direct, Indirect, Fixed, Variable & Semi-
Variable costs.
. Experience in performing, monitoring, and reviewing cost engineering
functions, which include cost estimating, cost control, and cost
analysis
. Hands on experience with crew composite rate calculations and Direct
and Indirect costs associated with labor and supervision.
. Experience in estimating the cost of manpower, budget preparation, and
staffing analysis, cost tracking and monitoring.
. Preparation of Project Controls plans and detailed internal manpower
utilization plans for discipline or specialty activities.
. Experience in developing unit hour and pricing data for a specific
discipline or other specialty, including estimating parameters,
factors, indices, productivity and craft distribution reference data,
etc
. Knowledge of engineering, procurement, contracts, construction, and
startup work processes.
. Familiar with Capital contracts, Project delivery methods &
Contracting arrangements.
. Close monitoring of direct and indirect costs of project and timely
raising flags for items exceeding budget.
Project Planning & Scheduling:
. Preparation and analysis of daily, weekly and monthly status reports,
graphical reports, project S-Curve.
. Preparation of baseline schedule, latest forecast plans using
Primavera P6
. Resources loading to Schedule as per Company Norms & experience.
. Fully understand the progress measurement methods (i.e. weighted
average, incremental milestone (Phylum based)). etc
. Fully understand Project planning & scheduling, Critical Path, Total
Float, Free Float, Negative Float, crashing & fast tracking etc.
. Planning, Resource & Cost Estimation of Construction (EPC) Projects.
. Man-hours estimation of EPC projects and craft wise composite man-
hours breakup.
. Fully understand the WBS & OBS, Cost Center, Standard man-hour, and
Project Budgeted Man-hour discipline wise.
. Comparison of Plan Productivity versus Actual Productivity.
EDUCATIONAL ATTAINMENT:
Bachelors (BE) in Mechanical/Industrial Manufacturing Engineering
Jan 2008 - Dec 2011
NED University of Engineering and Technology, Karachi, Pakistan
PROFESSONAL EXPERIENCE:
Employer: DESCON Engineering, Abu Dhabi, UAE (www.descon.com)
Duration: Jan-2014 to Present
Project: EPC PO Flare Recovery Project.
Client: Borouge.
Position: Planning Engineer
Project Description
. EPC Project scope includes designing, engineering, procurement and
construction. Scope includes 1 lac dia inches of Pipe Fabrication and
Site Erection with 400 Tons of Steel Structure and 350 Tons of
Equipments Erection (Columns, Exchangers, Vessels, Compressors with
Skid mounted pumps and filters along with supporting Civil and
Electrical and Instrumentation works.
Responsibilities
. Preparation and analysis of daily, weekly and monthly status reports,
graphical reports, project S-Curve.
. Preparation of baseline schedule, latest forecast plans using
Primavera P6.
. Cost analysis of different work items to check the feasibility of sub
contracting.
. Preparation of Manpower and equipment deployment charts and manpower
histograms.
. Manage Budget, cost analysis / control and Project schedule
. Supervision of BOQ preparation and material takeoff from design
drawings such as anchor bolts, embedded plates etc.
. Plan and verify the resources like Manpower, Construction Equipments,
Materials and scheduled activities in order to ensure the sequence of
construction activities moves smoothly without jeopardize.
. Preparation of material approval requests (MAR's) to the client.
. Prepare& monitor deployment of resources, manpower, equipment &
materials. Review all layouts, Structure& equipment drawings,
Preparation of BOQ, materials management & control, priority lists,
fabrication& erection feasibility.
. Periodic review of project budget, store inventory and financial
analytical study to control over procurement of materials, consumables
and other fixed assets items.
. Ensuring construction work complies with all engineering standards,
codes, specifications and design instruction.
. Resources loading to Schedule as per Company Norms & experience.
. Performing Earned Value Analysis (EVM) & preparation of KPI's for
performance measurement.
Employer: DESCON Engineering, Abu Dhabi, UAE (www.descon.com)
Duration: Nov-2013 to Dec, 13.
Project: Polyolefin expansion (P3A) Project.
Client: Joint Venture of Tecnimont. & Samsung (TSJ)
Position: Planning Engineer
Project Description
. Descon Scope includes construction of PE4 & PE5 Polymerization Area,
Process Common Area, Main Pipe Rack Area. Steel Structure Scope
includes 12800 Ton structure erection. Equipments Scope includes the
erection of 1300 static and rotary equipments mainly 20 compressors,
48 Silos, Gas Phase Reactors, Loop Reactors, Palletizers and their
internals and 670K ID of Piping. Joint Venture of Samsung & Tecnimont.
Responsibilities
. Preparation and analysis of daily, weekly and monthly status reports,
graphical reports, project S-Curve.
. Preparation of baseline schedule, latest forecast plans using
Primavera P6.
. Resources loading to Schedule as per Company Norms & experience.
. Data analysis on ongoing projects and its comparison for use in future
bids.
. Coordination between project site team and other business support
departments.
. Preparation and monitoring of project budget on quarterly basis.
. Cost analysis of different work items to check the feasibility of sub
contracting.
. Progress monitoring on daily, weekly and monthly basis.
. Performing Earned Value Analysis (EVM) & preparation of KPI's for
performance measurement.
. Prepare and monitor project launching plans during mobilization.
. Preparation of Manpower and equipment deployment charts and manpower
histograms.
. Monitoring of activities on critical path and sending regular feedback
to management for necessary actions.
. Track and monitor work progress thru company systems and standard
procedures.
. Dealing with consultants, clients and subcontractors on project
related issues.
. Close coordination with procurement department for timely delivery of
materials and consumables.
. Periodic review of project budget, store inventory and financial
analytical study to control over procurement of materials, consumables
and other fixed assets items.
. Manage Budget, cost analysis / control and Project schedule
. Plan and verify the resources like Manpower, Construction Equipments,
Materials and scheduled activities in order to ensure the sequence of
construction activities moves smoothly without jeopardize.
Employer: DESCON Engineering, Abu Dhabi, UAE
(www.descon.com)
Duration: July, 12 to Oct, 13
Project: SGD - Shah Gas Development Project.
Client: Al-Hosn Gas.
Position: Planning Engineer
Project Description:
. Scope includes construction of four areas (7.4million man hours) with
fabrication& erection of about 500,000dia inches of piping, 13000 tons
of steel structure, 6500 tons of equipment erection along with
supporting civil& E&I works.
Responsibilities:
. Preparation of change orders for extra work and or for items not
included in bid package.
. Supervision of BOQ preparation and material takeoff from design
drawings such as anchor bolts, embedded plates etc.
. Preparation and submission of technical documents (i.e. method
statements, technical queries, shop drawings etc)
. Review and approval of sub-contractor's technical submittals with
support from Field Engineering.
. Finding solutions to technical conflicts in design drawings and
consulting with client for solutions.
. Ensuring construction work complies with all engineering standards,
codes, specifications and design instruction.
. Preparation of material requirement plan for 3 month activities and
raising Indents for the material.
. Monitoring of material ledgers to determine if quantities remaining in
the estimate are sufficient to complete the project in the field.
. Ensuring the implementation of site instructions (SI's) and Field
Change sheets (FS's) from the client.
. Preparation of material approval requests (MAR's) to the client.
Employer: SEFEC ENGINEERING (www.sefec.com)
Duration: Jan, 12 to June, 12
Project: NSD Building and Spray Drying Tower.
Client: Unilever Company.
Position: Assistant Planning Engineer
Responsibilities:
. Work out project scope, duration, and Work break down structure (WBS)
& Organization break down structure (OBS). Generating monthly & weekly
look ahead plans & targets for execution.
. Monitor key project parameters like labor efficiency based upon
standard/actual man hours.
. Liaison with cost, estimating and procurement departments.
. Prepare& monitor deployment of resources, manpower, equipment &
materials. Review all layouts, Structure& equipment drawings,
Preparation of BOQ, materials management & control, priority lists,
fabrication& erection feasibility.
. Preparation of material approval requests (MAR's) to the client.
. Preparation and submission of technical documents (i.e. method
statements, technical queries, shop drawings etc)
. Progress monitoring on daily, weekly and monthly basis.
. Plan and verify the resources like Manpower, Construction Equipments,
Materials and scheduled activities in order to ensure the sequence of
construction activities moves smoothly without jeopardize.
INTERNSHIPS:
Employer: ETIMAD ENGINEERING (www.pg.com.taleo.net)
Duration: June, 10 to July, 10
Project: PROCTOR AND GAMBLE DRY LAUNDRY UNIT
PROJECT.
Client: Proctor and Gamble.
Position: Internee Engineer
Responsibilities:
During this internship, I got the experience of AUTOCAD DRAWING OF PIPING,
PLANT AREAS OF MSG (MAKING SYNTHETIC GRANUELS), and to calculate of BOQ
(BILL OF QUANTITY), Working in the sharp floor with labors, also draw out
the experience of IMPORTED PACKAGING MACHINES.
Employer: SHELL INVESTMENT COMPANY (www.shell.com.pk)
Duration: June, 10 to July, 10
Project: TAMEER TRAINING PROJECT
Position: Internee Engineer
Responsibilities:
This is the social investment program of Shell Pakistan with the focus
towards enterprise development amongst the youth of Pakistan by
disseminating information and capacity building for developing
entrepreneurial skills. During this internship program, our group performs
multiple tasks:
Conduct a Tameer training workshop in the NED for the younger blood
students. Visit to the different petrol pumps and made a comparison of
shell petrol pumps with the others. Coordinate with different automobile
industries and shops about the usage of Shell Oil. Finally, proposed a
project about the improvement and enhancement of productivity through
multiple alternatives.
CREDENTIALS:
. Registered Engineer in PEC (Pakistan Engineering Council).
. Certified in Primavera Project Planner (P6) from DESCON Project
Management System (DPMS)
. Certified in "DESCON Progress Monitoring System" (DPMS).
. Successful completion of 4 hour training of Contracts Administration
and Claims Management.
. Successful completion of 4 hour training of Team Building and Time
Management.
STRENGTHS:
. Good understanding of PMBOK, Cost Estimation and Control, Budget
Preparation, Cost classifications, etc.
. Cost sensitive to achieve budget targets, save costs and increase
revenues.
. Proactive and long term strategic thinker who senses and resolves the
issues before they give rise effects.
. Self initiator and independent performer, directly reporting to higher
authorities, whose organized endeavors and effective coordination
achieve milestones under minimal supervision.
. Painstaking team leader who enjoys exploring his fecundity and
believing in himself to take tough assignments with alacrity and
positivity, make way through them and celebrate on success.
. Prudent in managing resources and in evaluating situations to minimize
risks by giving attention to details.
. Frontrunner contributor to improve existing & to establish new
management processes for seamless operations.
Personal Details:
. Citizen Ship: PAKISTAN
. Date of Birth: 23rd June, 1989.
. Passport No. AS1870491
. Religion: Islam
. Marital Status Single
Linguistic skills
English, Urdu
*References available upon request.