David Dennington
714-***-**** ***** Surfset Dr. HB, CA 92648 abmb3k@r.postjobfree.com
Operations Management
Production, Engineering, Lean Manufacturing
Solid track record in increasing productivity and operational efficiency in
the manufacturing arena. Adept at team building, developing logical
solutions and bridging performance issues within the disciplines of the
workplace utilizing organizational skills, communication and time
management skills. Seeking an Operational Management positions bringing 25+
years as follows:
Key Strengths
. Strategic Operations Management
. Quality Assurance
. Lean Manufacturing
. Customer Service
. Cost Reduction, Budgeting and Financial Planning
Professional Profile
Stadco - Los Angeles. CA May 2012 - Current
Manufacturing Manager
Responsible for production, maintenance, quality initiatives. Lean
implementation and shipping for an established Defense and Aerospace
manufacturer of large production and prototype fixtures, tools, molds and
weldments. Ensured that profitability, absorption of labor, safety and
efficient use of raw materials is being enacted to meet planned metrics.
. Implemented 6S program for all work centers which reduced handling and
lost documentation issues.
. Adopted Lean Principles throughout W/C which has increased throughput
by 15%.
. Began cross-training of key positions in manufacturing cells which
lowered OT by 10%.
. Implemented inventory program in Epicor for purchased items, stocking
items and company and customer-owned tooling.
RBC - Allpower, Tecate, Baja Mexico 2008 - January 2012
Plant Manager
Assumed full responsibility for production, quality, engineering,
maintenance, shipping and receiving, import/export for plant located in
Tecate, MX. Oversaw the development of an efficient core team of
professionals to maximize profitability while implementing lean
manufacturing disciplines throughout the manufacturing processes. Insured
that quality, safety and employee discipline plans were enacted to reach
desired measured metrics.
. Developed a skilled workforce and reduced poor performing employees
. Increased standards and regulations in compliance with Mexican work
laws
. Established equipment maintenance program
. Purchased new equipment under tight budgetary requirements
. Kanban and complete inventory and logistics control
. Increased product type for carbon steels, stainless and others
RBC - ITB, Compton, CA 2004 - 2008
Manufacturing Manager
Managed Production, Plant Engineering, Plant Maintenance, Facility
Maintenance, Inventory and Purchasing Disciplines.
. Implemented Lean Manufacturing throughout plant
. Reduced overtime and past due accounts simultaneously
. Established predictive maintenance program
. Cross-functional team responsibility for inventory and engineering
Resume' David Dennington cont.
Pacific Sintered Metals, Los Angeles, CA 2000 - 2004
General Manager
Assumed full responsibility of Production, Maintenance, Facilities,
Engineering and Sales in my first year at PSM. Originally hired as QA
Manager, two week later I was promoted to Plant Manager.
. Implemented Lean Manufacturing Principles to work force
. Reduced past due accounts from 40% to under 8% in 6 months
. Grew automotive business from 5% to 55% in 2 years
. Implemented predictive maintenance program to press room
. Various metals from carbon steels to extensive alloys
NGV Systems, Long Beach, CA 1996 - 2000
VP of Operations
Assumed full responsibility of Production, Maintenance, Facilities,
Engineering, Purchasing, Sales and Accounting shortly after being brought
out from MI as Director of Quality.
. Combined Steel and Aluminum liner production on same Production line
which reduced cycle times by 50%
. Reduced 'flow form' wall thicknesses to decrease weight of liner but
still able to meet tensile and burst requirements
. Assisted in the development of Type IV cylinder for automotive use
. Coordinated Mexican and Venezuelan approval of NGV cylinders
TDM Manufacturing, Auburn Hills, MI 1992 - 1996
Director of Quality
Had full QA System responsibility for 3 plants across the US (Auburn Hills,
Delaware and Rancho Cucamonga) which ranged from vehicle homologation to
vehicle conversions from gasoline to natural gas and electric.
. Implemented Ford Motor Company QVM Program to 2 facilities. First
facilities to be approved for award
. Reduced rework from 25% to less than 2% in 6 months at 2 facilities
. Assisted in being awarded contract for Chrysler VPSI conversion
program
Educational History
Eastern Michigan University, Ypsilanti, MI. Business Management BA
Certified Quality Engineer Washtenaw College, Ypsilanti, MI (CQE)
Dale Carnegie, Dearborn Michigan.