. As Technical Lead, within four months after taking over project that had
stalled for two years at 10% completion, took project to 60% completion
through building a consensus within the design team and helped facilitate
the completion of the working prototype through technical direction. (ATK
- 0.50 cal Core Feed)
. As Technical Lead, took initiative and leadership in defining areas of
technical issues and helped with manufacturing process changes that
resulted in an accurate end-product (ready for manufacture) compared to
print. (ATK - Cold Heading Green (lead free) M855LF Penetrator)
. Within nine months redesigned existing $3 Million machining operation
operating at 35% efficiency for three years to consistently operating
85%+ (on average) and 98% peak efficiency. (Alemite)
. Reduced labor cost by $350,000 a year and decreased downtime by 90%
through redesign of mechanical components to extend component lifetime.
(Alemite)
. Improved process from 60% to 80% while decreasing scrap by 70% through
fixture redesigns and streamlining workflow. (Kingston Timers)
Skill Set
Project Management Mechanics of Materials Innovative
Government Contracts Cold Header Tool Design Analytical
Military Standards Vision Systems Creative Problem Solver
SAE Aircraft Standards Hydraulics & Pneumatics Team Oriented
Specialty alloys (Monel, Computer Programming World Class Customer
Inconel..) Service
Professional Experience
11/2007 to Present - ATK Armament Systems, Independence, MO
The world's largest manufacturer of military ammunition and integrated
medium-caliber gun systems.
Project Engineer II, Research and Development (Design), Government
Clearance
Selected Accomplishments:
. Within three (3) weeks, fixed two month long vision system problem with
not catching rejects and giving false rejects with a savings of $600K in
good product loss.
. Successfully brought in $1.2M new government business by writing a
government proposal for Broad Agency Announcement requests for aluminum
5.56mm case proposal.
. Saved significant amount of time (from 48 hours to 4 hours) in FEA stress
analysis of metal components through finding a customized metal forming
FEA analysis software.
. One of six person team to write quality procedures of Engineering Stage
Gate Lean Enterprise System to obtain ISO9001 certification for the
Research and Development department.
Technical Lead - Project: 0.50 cal Core Feeding
. Led review meeting for project to the executive board and managers,
conducted meetings assigned tasks and deadlines.
. Worked closely with manufacturing and management to develop system
requirements.
Technical Lead - Project: Cold Heading Green (lead free) M855LF Penetrator
. Wrote statement of work for work required and expected deliverables by
suppliers. Worked with purchasing and Supply Chain Manager and led
meetings with suppliers and established goals and action items.
. Helped to ensure successful prototype sample lot of full geometric
compliance with existing print using formed penetrators. Developed
customized alloy optimized for performance and manufacturability.
Test Coordinator for 7.62mm lead free ammunition project - Wrote test work
instructions, scheduled and monitored testing, analyzed data and wrote
formal reports in easy to understand format with recommendations.
5/98 to 11/2007 - Alemite Corporation (Lincoln), Johnson City, TN
Premier company for automotive lubrication and fluid handling systems
world-wide.
3/01 to 11/2007 - Senior Research and Development Engineer (Design)
. Project management on new product designs. For example: suitability of
aircraft grease fittings to meet government specifications.
. Personally responsible for $125K cost reductions by eliminating
unnecessary parts and making material changes.
. Interacted with customers on daily basis to answer questions and
provide product support.
. Project responsibilities from initial product conception, budgeting,
prototyping, testing through working with manufacturing to ensure new
products or product redesigns are easily manufactured.
. Eliminated $100K operating costs in washing parts by replacing with oil
bath.
. Solved customer needs for customized vent fitting applications for
axles.
. Reduced costs of hydraulic pump by replacing component materials that
led to reducing lead time by ~ 80%.
. Identified and removed unnecessary accessory components to hydraulic
pump assembly, which further reduced costs by $180K per year.
. Redesigned established product to achieve a non-drip nozzle for
automated oil dispensing, which resulted in resolution of customer
issues with customer feedback of "one thing that was well redesigned"
and "met our needs."
. Designed innovative portable pneumatic grease gun with applications
including hazardous location use.
. Equipped hydraulic hose reel for European sales, which are anticipated
to increase the market by 30%.
. Invented a leak proof zerk fitting and designed improvements to a
hydraulic track tensioning fitting.
5/98 to 3/01 - Senior Manufacturing Engineer
. Well versed in Six Sigma, Lean Manufacturing and Kiazan.
. Vision Inspection Systems
. Project Manager: Vision System Assembly Machine Improvement ($200K
budget).
. Designed numerous computer-testing systems including electrical
schematics and programming of data acquisition systems.
. Designed automated vent fitting test system including electrical
schematics, which reduced set up times by one hour and eliminated the
need for technician.
. Successfully programmed and designed automated vision inspection system
including statistics with a test rate of 435 milliseconds with 16
measurement inspections.
4/97 to 5/98 - Manufacturing Engineer
Sturdy Corporation, Wilmington, NC
Automotive and marine manufacturer of intake manifold runner control, OEM
automotive governors and IMRC with ~200 employees.
< QS900 internal auditor, wrote process FMEAs, process instructions and
taught ergonomic classes.
12/95 to 4/97 - Electrical Motor Manufacturing Engineer
Kingston Timer, Smithville, TN
Washing machine and dryer timers manufacturing company with ~500
employees.
. Responsible for bringing one million-dollar switch automation machine
online.
. Developed 250,000K automated parts washer.
11/90 to 12/95 - Process Engineer
Robert Shaw, Cookeville, TN
Industrial and automotive manufacturer of thermostats, throttle position
sensors, industrial level sensors and accelerometers with ~1000 employees.
. Head engineer for industrial controls department, and engineer for
throttle position sensor.
. Designed and programmed automated computer test equipment and data
acquisition systems.
Education
MBA, 2003 (GPA 3.6), King College, Bristol, TN
MS Mechanical Engineering Courses 1993 - 1994, Tennessee Tech,
Cookeville, TN
BS Aerospace Engineering 1990, University of Tennessee, Knoxville, TN,
EIT 1990 Number: 13411
Computer Proficiency
Software: Generic CADD AutoCAD 2007 MS-Project Manager
Solidworks 2007 Cosmos Pro E Cadd
Software
Programming Siemans PLC Labview
programming
Languages: Cognex Checkpoint CNC