Mr: Boukra Djelloul Sayah Omar
E-Mail: ********@*****.**
Mobile: +213-***-***-***
Executive Summary
< A competent professional with over 02 years of extensive experience in
Quality Assurance,
Welding & Fabrication Materials Management and Vendor Management.
< Currently worked with SAIPEM Sca, as QA/QC INSPECTION Mechanical Works
"Steel Structure" 23/09/2010
< Loading Arm installation BLNG, Loading Arm Structure,
< Deft at conducting impact test for production test coupons for low
temperature service vessels as code requirements.
< Prepare,Witnessing and monitoring of mechanical testing of test specimen
< Familiar with international codes like ASME, API 1104, B31.3, Sec IX,
ASTM, ANSI, API, AISC and with Institute Algeria Petroleum Standards.
< Monitoring the Monthly QA statistics, Train-1, Train-2, Train-3
-auditing. Hassi Berkine Groupement (Annadarko&Sonatrach)
UniversityDecember2003:
Secondary school: (Sig) Mascara New High school, Algeria Bilingual
scientific, "science transitory" stream
University: Oran University of sciences and Technology (U.S.T.O)
Mechanical Engineering Faculty,
Department of Mines and Metallurgy: Engineer Diploma in Metallurgy
(U.S.T.O)
Project: Completion and Construction of Floating Roof Storage Tank,
With Cathodique, Protection and Exploitation.
Volume: V = 50.000m3
Diameter: D = 67,08m
Height: H = 17,02m
Tsks:
The successful responsible for quality related activities across a broad
range of services and activities, including, but not limited to the
following:
* Problem Solving, Failure Analysis, Corrective Action & Preventative
Action activities with internal and external manufacturing.
*Drive a problem solving culture using chemical, physical and process
metallurgy knowledge.
*Assume manufacturing responsibility for corrosion, heat treatment, and
metal joining processes.
*Drive process improvements projects through project management skills and
metallurgy knowledge
*advises manufacturing on engineering and process development projects.
*Conducts engineering and technical studies, and performs a wide variety
of technical work which will lead to new or improved products, product
lines and processes under marketing, cost, time and regulatory
construction.
* Compiles project plans and coordinates project team meetings to ensure
timely resolution of technical and process related problems.
*Communicates regular updates on project status to the project team and
sponsor.
*Plans and conducts engineering research and manufacturing engineering
projects with other manufacturing groups. Will monitor and control progress
of engineering projects to ensure sound application of metallurgy
principles are used and design intent is being achieved
*Provide metallurgy oversight, support and consultancy to manufacturing and
design functions on design for process validation, design for manufacture,
material selection, mach inability and process development.
*Participate in key monitoring processes which include: Supplier Audits,
Supplier Corrective Actions and Defective Material Reports.
* Oversee the creation and participate in Risk Documents.
Areas of Exposure
Inspection:
o To advise on repair techniques, materials selection, welding procedures,
inspection and testing requirements.
o To check condition of safety relief valves, prescribes repairs, as
required and witness relief pressure setting, including hot setting where
needed.
o To review project FEED proposals and design documents regarding material
selection and mechanical integrity, perform shop and field inspections
and review QA/QC documents, method statements etc. during project
execution.
Quality Assurance/ Quality Checks:
o Checking the Approved Quality & Inspection plan along with checking the
approved drawings, governing standards and specifications.
o Coordinating with Quality Inspectors and QC team.
o Preparing the site query/ concessions reports depend upon the jobs, and
get approval from client
o Contacting the internal auditing, coordination with external third party
auditing.
Materials Management:
. Ability to Work Well & Hard Under Pressure.
. Good Communication Skills with Different Personality Types:
Comfortable and Effective Communicating With both Superiors and Staff.
. Accustomed To Being In Positions Of Responsibility, Self Motivated And
Willing To Set Goals And Work To Achieve Them, Never Assume, The Other
Person Is Responsible.
. I Can Inspect On The Material Of Any Product And Make Sure That The
Product Is Satisfying The Standard Condition.
I am very sociable and I do have the ability to work with a multicultural
team and I do believe that I can be very productive, responsive and
communicative when it comes to building up a relationship. My hobbies are
various: Reading, sport and travelling. I am used to work in hot areas.
Professional Experience
SAIPEM Contracting Algeria
since Sept 2010
QC Inspector Mechanical Works- Steel Structure-
Pr sents Project in LPG, LPDH Hassi Messaoud, EXTRACTION DES LIOUIDES DES
GAZ ASSOCIES HASSI MESSAOUD
ET SEPARATION D'HUILE LDHP ZCINA, ALGERIE, ENC 08 1046Z
*Daily update the project status, Daily Inspection reports, Have complete
control of welding and painting activities at BLNG site projects &
Maintenance Implementation of ITP and PQP
*To identify areas of concern and propose dedicated inspection procedures
to follow-up their resolution to improve Plants integrity. To comply with
all company Health, Safety and Environment as well as Work Permit, policies
and procedures
*To advise on repair techniques, materials selection, erection procedures,
inspection and testing requirements
*To supervise and participates of preliminary interpretations carried out
by subordinates
*Monitoring the Monthly QC Steel Structure Inspector and Pylons Electrical
Inspector activities
*Prepare Project Quality Plan, and ITP based on Work Scope.
*Prepare QCP, QSP
*Witness The Hydro Test. And punch List and Commissioning activities.
Surveillance of QA/QC activities in the workshop to verify the compliance
Role Description: Execute the inspection and quality control activities on
site collecting the relevant objective proofs ensuring the correct
installation/construction/testing works carried out on mechanical parts
such as vessels, column, thanks, spheres, heat exchanges and air coolers,
skis mounted packages, piping, pipelines and structural steel et
Highlights:
o Approval as a QC inspector
o Witnessed Erection, Allignements Torque Bolts; Painting and Coating QA/QC
Activities.
o Participate Carry out Internal audit as per ISO 9001; 2008. LPG Projects.
Formations Project: 2010
*LIS: Leadership in Safety
*Training Involvement HSE
*Works at Height Training
*Confined Space Training Works (Watching)
Groupement Berkine (Annadarko&Sonatrach)
Nov2008-Sept2009
Engineer Inspection in Centre Petroleum CPF
Role:
*Carrying out the plant shutdown activities, valves inspection as a vendor,
material inspection, pressure vessel, columns and heaters. Valves Testing,
Material Testing,
*Supervising Steel Frame Facilities and Boilers, Controlling and Inspecting
CPF's, Prospecting
* Implementation and scheduling of inspection of steam and gas pressure
apparatuses APG & APV.
*Planning and execution of the inspection program of handling and lifting
devices. APL
* The planning and execution of the inspection program of electrical
appliances
* The planning and execution of the inspection program of safety valves
PSV's.
* The inspection program and follow-up of Cathodic Protection System of
buried works. Steam and gas pressure apparatuses APG & APV...
*Concerning the apparatuses with steam and gas pressure APG & APV, all the
devices were indexed with a maintenance register established for each
apparatus. The Algerian regulation clearly defined the maintenance
procedures and the frequency of inspection of these apparatuses. You must
understand that:
*A gas pressure apparatus contains gas (Air, N2, O2, etc) whose volume in
litres exceeds 5 litres and the product of the pressure in bar by volume in
litres exceeds figure 80.
*Each apparatus, vessel or separator must be opened and inspected
internally and externally after a three-year period. Thus each three (03)
years, we must call upon an organization to witness and approve this
operation by sending inspectors onsite to check our apparatuses (both
internal and external checks).
After each checking operation, they must sign the registers and give you a
copy of the report.
*All these apparatuses are inspected annually in the presence of an
inspector.
*Co-ordination with Quality Team.
Highlights:
o Successfully witnessed hydrostatic test as per approved procedure &
drawings - required pressure & holding time.
o Worked as a QA/QC - Team Leader.
Batirim EX Groupement BATIMITAL
Juin20066-Juin20088
Senior Engineer Supervisor South Zone
Role:
*Reviewing the incoming material test certificates for shell plates
(including Stainless steel Cladded), Nozzle pipes, flanges, elbows, steel
structural shapes and consumable electrodes and filler wire material
certificates from approved material suppliers against actual material
traceability.
*Supervise Workshops Construction (overhead travelling crane)
*Worked as a Third Party Inspection for Tarsi - construction QA/QC
activities.
*Reviewing the incoming material test certificates for shell plates
(including Stainless steel Cladded), steel structural shapes and consumable
electrodes and filler wire material certificates from approved material
suppliers against actual material traceability.
*Supervise Floating Roof Tanks Construction
*Company main contact and coordination person in the south
Highlights:
o Approval as a Vendor Inspector
TARSI EX ENCC Subsidiary Oran ALGERIA
Engineer of Business in Technical-Commercial
Jan 200 5 - Febr2006
Role: Plant Assembly and Frame Maintenance as well as Boiler
In charge of Technical-commercial Service Gestion
Highlights:
o Approved as a TPI
PETROSERVICE Assembly and Industrial Maintenance Company Hassi
Messaoud
QC Engineer of Works
May2004-Nov2005
Role:
*Monitoring daily production and welder performance.
*Attending the meeting to with client.
*Preparing the site query/ concessions reports depend upon the jobs, and
get approval from client, issue the NCR for the fact found, and close CAR.
*Coordinating the meeting with client representative, Vendor project
management and QA/QC department for project execution.
*Carrying the all types of activities related QA/QC like welding
inspection, witnessing destructive testing.
* Works Supervisor
*Assigned to control all radiography control tasks.
*Connection of New Oil wells (Installations of Surface and Connection
Lines) Pipe construction, Material renting out...
*Conducting the inspection of raw materials such as Pipe, Plate, tube and
Pipe fittings.
*Hydro Test done various
Highlights:
Approved as a QA/QC Engineer.
Arabic Spoken: Native Written: Excellent
French Spoken: Fluent Written: Excellent
English Spoken: Average Written: Gd
Computer Skills
. High level of computer skills and use of web based software.
. Microsoft office (Word, Excel, Power Point etc)
. Microsoft outlook
. Documentation Software : EDMS Documentum & DOC PRO
* Good Mastery of Web Information Research, Photoshop
Personal Dossier
Phone : (+213)661.941.327 ou (+213) 662.522.340
E-mail : ********@*****.**
ADRESSE : N 13, Bloc (O) Cit des 173Logements Hai Makame Elchahid Sidi
Bel Abb s 22000 Alegria
EXPERIENCE OIL & GAS 2004-2011
Curriculum Vitae
METALLURGICAL ENGINEER
Construction work, Quality Control, and inspection of mechanical (static
and rotary) equipment, pipelines, structural steel storage tanks, pressure
vessels, oil and gas facilities ...
[pic]
Challenge:
Long experience, looking for new challenges. I believe that I can join in
your company's staff and participate actively and positively in its
development.