LARRY J. DAVIS
P.O. Box ***
Harvest, Al *****
Cell 256-***-****
*****.*.*@***.***
WORK HISTORY SUMMARY
Over 30 year's experience in nuclear power, DOE, industrial chemical plant
and petroleum pipeline contract support in operations, maintenance and
engineering. During this time I have performed research, validation, and
revision of modification packages, design basis documents, FSAR and the
associated 10CFR50.59 support. I have also developed operations,
engineering, maintenance, and administrative procedures for nuclear power
plants and DOE facilities.
EMPLOYMENT HISTORY
Monticello Nuclear Power Plant
10/10 - Present
My responsibilities include supporting the modification process for
various plant modification packages. The scope of work includes
reviewing prints and as-built information to support the incorporation
of modification details into the associated procedures as a result of the
modification change process. The revision to Operations, Maintenance and
Administrative procedures using Passport to process and track procedure
status.
Dominion Services
03/09 - 5/27/2010
Assigned to the Kewaunee Improved Technical Specifications (ITS) Conversion
Project. My support efforts are primarily focused around the Licensing and
Implementation phases, which include the research, validation and revision
of applicable UFSAR sections, Design Basis Documents (DBD), System
Descriptions, Procedures and related10CFR50.59 support work.
Dominion Services
06/08 - 01/09
Assigned to the Design and Licensing Basis Integrated Review project at
Dominion Services Innsbrook Office. My support efforts primarily consist
of reviewing design and licensing basis documents to support revision of
the UFSAR for the Kewaunee Power Station.
Davis Besse Nuclear Power Station
08/07 - 06/08
Assigned to the Davis Besse Improved Technical Specifications (ITS)
Conversion Project. My support efforts are primarily focused around the
Licensing and Implementation phases, which include the research,
validation and revision of applicable UFSAR sections, Design Basis
Documents (DBD), System Descriptions, Procedures and related10CFR50.59
support work.
Monticello Nuclear Power Plant
11/06 - 07/07
My responsibilities included supporting the modification process for
various plant modification packages. The scope of work included
reviewing calculations, prints and
as-built information to support the incorporation of modification details
into the SAR, DBD and associated procedures as a result of the
modification change process. The revision to Operations, Maintenance and
Administrative procedures used Passport to process and track procedure
status.
Sequoyah Nuclear Plant
10/06 - 11/06
The scope of work was to support the Operations Procedures Group revising
procedures for outage commitments which included the associated 10CFR
50.59 support.
Colonial Pipeline
6/04 - 8/06
The scope of work included the Delivery Control Procedures for local
control of automated facilities and Facility Maintenance Procedures
(electrical, mechanical and I&C procedures).
Edwards Power Station
3/04 - 6/04
The scope of work primarily focused on the Operations Procedure Group
developing operating and administrative procedures for a coal fired power
generating station.
Savannah River Site
6/03 - 2/04
The scope of work directly supported the Operations Procedure Group in the
Tritium Department developing operating procedures for a new facility
scheduled to start operation in 2006. I was awarded an 'L' Clearance but it
was not issued due to the project layoff of Contractor personnel.
Davis-Besse Nuclear Station
3/17/03 - 4/25/03
The scope of work was to consolidate and disposition Operations condition
reports and process the associated procedure change requests. This work
included identifying the changes and processing revisions to the
associated normal, abnormal and alarm response procedures to close out
the existing backlog. The work scope also included10CFR 50.59 support.
Newport Chemical Facility
12/16/02 - 3/14/03
The scope of work was to review construction turnover packages and
identify the required changes in procedures and prints.
Davis-Besse Nuclear Station
8/02 - 11/25/02
The scope of work was to consolidate and disposition Operations condition
reports and process the associated procedure change requests. This work
included identifying the changes and processing revisions to the
associated normal, abnormal and alarm response procedures to close out
the existing backlog. The work scope also included10CFR 50.59 support.
Great Lakes Chemical Corp.
7/01 - 3/02
Assigned to Process Safety Management Group, the scope of work directly
supported the Operations Department in the development and revision of
operating procedures in accordance with the OSHA Process Safety Management
Standard, 29CFR1910.
Colonial Pipeline
4/98 - 6/01
The scope of work included the Delivery Control Procedures for local
control of automated facilities and on Facility Maintenance Procedures
(electrical, mechanical and I&C procedures).
Zion Nuclear Station
1/98 - 3/98
The scope of work was to consolidate and disposition Operations condition
reports, and process the associated procedure change requests. This work
included identifying the changes and processing revisions to the
associated normal, abnormal and alarm response procedures to close out
the existing backlog. The work scope also included10CFR 50.59 support
and closing out commitment backlog items.
Great Lakes Chemical Corp.
11/95 - 12/97
Assigned to Process Safety Management Group, the scope of work directly
supported the Operations Department in the development and revision of
operating procedures in accordance with the OSHA Process Safety Management
Standard, 29CFR1910.
La Salle Nuclear Station
10/95 - 11/95
The scope of work was to disposition Operations condition reports, and
process the associated procedure change requests. This work included
identifying the changes and processing revisions to the associated
normal, abnormal and alarm response procedures to close out backlog
items. The work scope also included10CFR 50.59 support.
River Bend Nuclear Station
4/95 - 10/95
Assigned to the Electrical Maintenance Procedure Upgrade Project. The
scope of work included research of vendor documentation, station drawings
and applicable regulatory documentation for the development and revision
all types of Electrical Maintenance procedures. The work scope also
included 10CFR50.59 support.
Westinghouse BWR Services
1/95 - 2/95
Completed Westinghouse BWR Refuel Floor Training and Certification.
Savannah River Site
Waste Management Operations Engineer 7/94 - 12/94
The scope of work directly supported the Operations Procedure Group in
the High Level Liquid Waste Processing Facility. Developed/revised High
Level Liquid Waste Processing procedures which included System Operating,
Abnormal Operating and Alarm Response procedures.
Quad Cities Nuclear Station
12/93 - 7/94
Assigned to the Procedure Upgrade Project. The scope of work included
research of documentation, stations drawings and applicable regulatory
documentation for the development and revision all types of Administrative
procedures. The work scope also included 10CFR50.59 support.
River Bend Nuclear Station
8/93 - 12/93
Assigned to the Systems Engineering Group. Developed Motor Operated Valve
Testing Procedures in accordance with the guidelines of NRC Generic Letter
89-10. The scope of work included research of documentation, stations
drawings and applicable regulatory documentation for procedure development
Quad Cities Nuclear Station
2/91 - 5/93
Assigned to the Operations Procedure Upgrade Project. The scope of work
included research of documentation, station drawings and applicable
regulatory documentation for the development and revision of Operation
procedures. The work scope also included 10CFR50.59 support.
Savannah River Site
5/90 - 2/91
The scope of work directly supported the Reactor Training and Procedures
Group. Developed/revised procedures for the 'K' and 'L' reactors which
included System Operating, Abnormal Operating and Alarm Response
procedures.
Waste Isolation Pilot Plant
Procedure Writer 3/90 - 5/90
Facility Operations Department: Developed procedures for the Central
Monitoring Station.
Hatch Nuclear Station
Operations Specialist 10/89 - 3/90
Worked with the Configuration Management Group on a Design Change Close-out
Project. Closed out DCRs dating back to 1978, walked down systems to
verify design change installed, and completed design change packages.
Calvert Cliffs Nuclear Station
Technical Manual Reviewer 8/89 - 10/89
Researched plant documentation and contacted vendors to ensure technical
manuals and vendor drawings reflected the current plant configuration and
provided the most current information for components installed in the
plant. Updated manuals and drawings with cross-referenced applicability
listings.
Savannah River Site
Restart Engineer 11/88 - 8/89
The scope of work directly supported the Operations and Training
Division. Researched DOE Orders and other applicable regulatory
documentation for development of Administrative Procedures for Department
of Energy Site Representatives.
Vogtle Nuclear Station
Operations Specialist 3/88 - 11/88
Assisted in system walkdowns to ensure readiness for Hot Functional Testing
on Unit 2.
Fermi II Nuclear Station
11/86 - 3/88
Assigned to the Operations Procedure Project. The scope of work included
research of documentation, station drawings and applicable regulatory
documentation for the development and revision Operation procedures. The
work scope also included 10CFR50.59 support.
Fort St. Vrain Nuclear Station
7/86 - 10/86
Assigned to the Operations Procedure Project. The scope of work included
research of documentation, station drawings and applicable regulatory
documentation for the development and revision of System Operating,
Surveillance, Abnormal Operating and Alarm Response Procedures.
Clinton Power Station
2/86 - 7/86
Assigned to the Operations Procedure Project. The scope of work included
research of documentation, station drawings and applicable regulatory
documentation for the development and revision of Operation procedures.
Hope Creek Nuclear Station
Operations Specialist 6/85 - 2/86
Assisted with preoperational testing and start-up of Radwaste systems and
components.
Wolf Creek Nuclear Station
Operations Specialist 9/83 - 5/85
Operations Support Group: Scope of work included preparation and
verification of system and equipment tag-outs using Station drawings, to
support start-up testing of all plant systems. Performed monthly tag
audits.
Susquehanna Nuclear Station
Operations Specialist 3/83 - 9/83
Performed system line-ups, system hydro and flush, equipment tagging and
operation of plant equipment and systems.
Palo Verde Nuclear Station
Operations Specialist 9/82 - 3/83
Performed system line-ups, system hydro and flush, equipment tagging and
operation of plant equipment and systems.
Browns Ferry Nuclear Station
Assistant Unit Operator 8/74 - 9/82
Duties included inspection, operation, and surveillance testing of plant
equipment and systems. Worked on refueling crew during fuel receiving,
inspection and core relocation.
1977 - Completed Nuclear Generating Plant Operator Training Program.