Post Job Free
Sign in

Project Manager Engineer

Location:
Clinton Township, MI, 48038
Posted:
June 20, 2011

Contact this candidate

Resume:

James R Spaulding

***** ******

Clinton Twp. MI *8038

586-***-****

******@*****.***

CAREER SUMMARY

ARKK Engineering

Engineering Project Manager (Oak Park, Michigan) April 18, 2011 to Present

ARRK Engineering is a supplier of Tire and Wheel Assembly equipment to General

Motors and many Tier 1 suppliers. As a Project Manager I am responsible for following

the development, production and installation of this equipment to the assembly plant.

This responsibility includes interfacing with the tool designers, controls engineers,

customers while tracking project progress and reviewing changes for impact to the

overall cost and timing.

Astra Logistics Corporation

Plant Manager (Greer, South Carolina) April 1, 2010 – April 5, 2011

ASTRA is a Tire and Wheel Assembler to BMW – Spartanburg, SC. This position

allowed me to apply my past 10+ years in Tire and Wheel processing to support the

organization’s vision and values of excellence and professional commitment. As this

was a new facility in March 2010 I was responsible for the start of production from pilot

through regular production. Goals included employee training, coordinate the activities

of direct reports, restate plant organization charts, increase efficiency and accountability

to enable realization of headcount savings. Develop a personal rapport with customers

and suppliers. Maintain clearly defined Position Description for each member of the

plant, Oversee the annual completion of the operation budgets and coordinate the

resources necessary to accomplish the plan. Also provide profit and loss statements for

presentation to company owners.

Reason for leaving – Lay off.

General Motors Corporation

Senior Manufacturing Project Engineer, October 1999 - October 2009

Responsible for and all Tire and Wheel Equipment and Processes for General Motors

Truck Assembly Plants. Duties included plant equipment layout, equipment design,

procurement, installation and maintenance procedure training including the 5S

Discipline. Project budget/cost estimating including installation labor, required

equipment and timing. In plant experience included invention of new patentable tooling

and processes, equipment trouble shooting, equipment install and production startup

support. Presentations of the above to Plant Management for buy in and updates. I

participated in Training team leaders and UAW personnel while observing safety

standards and work rules to achieve corporate goals for quality and lean manufacturing.

Develop site strategic project plans for future product potential. Development of

Statement of Work, Statement of Requirements for new equipment, supplier bid

procurement, production start up support.

Reason for leaving - Lay off.

Chrysler Corp / Stellar Engineering, Sterling Heights Assembly

Manufacturing Engineer, August 1997 - July 1999

I was responsible for electrical component production issues, tool update, equipment

install and maintenance in General Assembly. I developed and conducted operator

training of new or updated equipment / processes. Equipment maintenance

supervision, Team participation for the elimination of Buzz, Squeak and Rattle (BSR) of

interior components.

Reason for leaving - Contract termination

Ford Motor Company /James Tanury Assoc

Homologation Engineer, August 1995 - August 1997

I was responsible for researching latest vehicle safety and emission standards for

exportation of light trucks to South America and Middle East Countries. I also

established Bill of Material and installation/retrofit documents to insure compliance.

Reason for leaving - Contract termination

Buick, Oldsmobile, Cadillac Division, General Motors Corporation

Manufacturing Engineer / Technical Writer, May 1987 - July 1995

Responsible for Electrical Product Assembly Documents (PADS) for small car

production. Production cost studies for new or revised processes. Wire test tooling

design, procurement and install. Vehicle electrical diagnostic procedures for in plant

repair. Vehicle owner's manual illustrations, text for vehicle trouble shooting and

electrical option description.

Reason for leaving - Contract termination

Harold W. Vick Funeral Home

Funeral Director, May 1976 - May 1987

All typical responsibilities of a licensed funeral director.

EDUCATION

Wayne State University, Detroit, Michigan

B.S., Mortuary Science, Minor: Chemistry, December 1976

GPA: 3.0

PROFESSIONAL ACCOMPLISHMENTS

Michigan Board of Mortuary Science License 501005644

US FIRST Team Leader - Team 818, Warren Consolidated Schools, National Rookie

Winner 2001

U.S. Patent Awards

7,471,892 Vision Assisted Hand Tools

7,234,888 Arrangements for Anchoring Items to Automotive Framing Components

6,865,795 Method of Installing a Vehicle Roof Assembly

6,857,914 Battery Post Connector Apparatus

6,805,593 Quick Connect Battery Terminal

6, 638,075 Electric Connection to Windshield/Back Glass

6,585,287 Roof Rail Air Bag Assembly and Method of Installation

6,470,559 Modular Automotive Roof Installation Method

7,836,569 Tire Pressure Monitor Installation Tool

7,931,342 Adhesive Wheel Weight Dispensing Apparatus

Deutsches Patent – und Markenamt

DE 10308283 A1 Elektrische Verbindung mit einer Windschutzscheibe/Heckscheibe

DE 102********* A1 Vorrichtung zum Abgeben von selbstklebenden Wuchtgewichten



Contact this candidate