Mark Anthony Garcia 832-***-**** Home
**** ******* **. ***. **** Houston, Tx. 77034 **************@*****.***
________________________________________________________________
Hands-on experience working with Gas steam Turbines, also worked with conveyor belts
and Windmill Turbines. I am an energetic, creative problem solver and a very reliable
individual seeking fulltime, permanent employment.
CERTIFICATIONS:
HCC Millwrights Apprenticeship Program
8505 Glen Vista St. Houston, Tx. 77061713-***-****)
Siemens Westinghouse Combustion Turbine Qualification
Millwright 16-Hour Health and Safety Training
Rigging Qualification
Hytorc Bolting Technician
Tower Rescue Training (Horse Hollow Project Windmill Turbines)
First Aid and CPR
(SMAW) Welding Training
International Training Center-Las Vegas
6801 Placid St. Las Vegas, NV 702-***-****)
GE Gas Turbine Qualification Program
GE Steam Turbine Training
Association of Reciprocal Safety Council
Reciprocal Courses
Basic Plus
Confined Space
Supplied Air
Respiratory Air
WORK INFORMATION:
04/30/05 – 09/30/05 Atlantic Plant Maintenance
10/31/05 – 12/13/05 Quality Assurance Support Group
12/15/05 – 08/02/06 Siemens Westinghouse
08/08/06 – 11/06/07 Universal Plant Services Inc.
11/08/07 – 02/13/07 Thomason Mechanical Corp.
02/18/07 – 05/14/08 Turbo Care
05/15/08 – 08/20/08 HB Turbo
08/25/08 – 08/20/10 Dresser Rand
REFERENCE:
Mark Compsi 281-***-**** Ray Vera 713-***-****
George Bone 713-***-****
WORK DETAIL:
Atlantic Plant Maintenance- I worked as a mechanic for frame 5 and 7 turbines and I also
did major teardowns.
Siemens Westinghouse- I worked on wind turbines, repair and assembly on the erection
division. I also worked on the Quality Support Group performing hot gas pass projects
on gas turbines.
Universal Plant Service- I performed pump alignments and worked on the conveyor belts
assembly for a new terminal the Houston Intercontinental Airport.
Turbo Care- I performed sandblasting on steam and gas turbines and I also worked at eh
assembly dept. balancing rotors and de-blading and re-blading gas turbines.
H.B. Turbo- I disassembled steam turbines and did sandblasting as well. I also worked
on water, between bearing, and overhang pumps for H.B. Turbo.
Desser Rand- I was at the assembly dept. de-blading and re-blading gas turbines, I also
worked on frame 3, frame 5, and frame 7 compressors. I also assisted in the balance
dept. on gas and steam turbines.