Post Job Free
Sign in

Project Testing

Location:
12640
Posted:
August 15, 2011

Contact this candidate

Resume:

Page */*

CURRICULUM VITAE

Name : Ir. HERRY KRISTIYONO

Place/Date of Birth : Jakarta, February 19, 1971

Nationality : Indonesia

Education : University Graduated

Qualification : UT PCN 3.1: 3.2:3.8: 3.9

PCN No. 307317

UT ASNT All Configuration And MT/PT level II ASNT

Phone No. : +62-21-727****

Email Address : *****.**********@*****.***

PROFESSIONAL TRAINING AND SEMINAR ATTENDED:

1. May 16 - 20, 2011: Attendance for CSWIP 3.1 of TWI at JOGYAKARTA

Conducted by PT. Beyond Indonesia

2. June 2009 : Certification for Ultrasonic testing By MINDT for

PCN Level II

3.1: 3.2: 3.8 and 3.9

3. 2008 : Certification for Ultrasonic Testing By

Oceannering International.

Practice for API RP2X TKY Joint.

4. August 2005 : Recertification of Magnetic Particle Testing Level II

in according ASNT Document SNT-TC-!A 1996 Edition Conducting

by PT. Test Tech Pte Ltd.

5. October 2005 : Recertification of Dye Penetrant Testing Level

II in according ASNT,s recommended practice No. SNT-TC-!A 1996

Edition Conducting by Hendra Wijaya ASNT Level III Cert No.

148766.

6. May 2005 : Attended NDT UT TKY/ All Configuration Level

II SNT-TC -1A conducted by Institute for research and

Development of Material and Technical Product and The Ministry

of Man Power (B4T) in Bandung., Passed the Examination.

7. April 2001 : Attended NDT UT P-P Level II SNT-TC -1A

conducted by Institute for research and Development of Material

and Technical Product and The Ministry of Man Power (B4T) in

Bandung., Passed the Examination.

Page 2/5

8. August 2001 : Attended in house Ultrasonic Testing Gauging

on Marine Services, Conducted by PT. Lekom Maras.

8. September 2001 : Attended in house MT/PT on Marine Services,

Conducted by PT. Graha Cipta Utama.

9. September 2000 : Attended in Management Development Program at

PPM Institute Of Management, Subject : The Effective of

Leadership.

WORKING EXPERIENCE:

1. Company : OCEANEERING

Period : Sept 2006 - present 2011

Position : NDT Technician Level II

2. Company : PT MEGATEK KONSINDO

Period : Aug 2005 - Nov 2006

Position : NDT Technician Level II

3. Company : PT GRAHA CIPTA UTAMA

Period : May 2001 - Aug 2005

Position : NDT Technician Level II

4. Company : PT.HITCHI POWER SYSTEM INDONESIA

Period : 1995 - 2001

Position : Section Head of Material Control,

Progress Control and quality Control

PROJECT ASSIGMENT:

September 2006 - presentl 2011 : PT. Oceanering International

For Sonamet Lobito, Angola.

Conducting :

Visual Inspection, Ultrasonic Testing, Magnetic

Particle Tecting, Penetrant Testing

Page 3/5

KIND OF PROJECT:

KIZOMBA MANIFUL AND STRUCTURE.

ACERGY AND PENTOCELLI PROJECT.

KAMERON MANIFUL

BP PROJECT

Bp Angola Block 18/31

Cameron Project : Module and Suction Pile

ACERGY/TOTAL

PAZFLOR SURP JUMPER

SUCTION PILE OF FAZFLOR FPSO

DSME/TOTAL

FMC/TOTAL

PAZFLOR SUBSEA

ExxonMobil : Turntable (Turret)

Chevron : Takula Jacket: Tambua landana

Plare,

Barge Bumper, Boat landing.

Mafumeira Jacket, Mafumeira Main Deck

Acergy : Gas Gathering for Block 15 and

Stringer,

British Petroleum : Riser Tower, any Counter Weight

Total/DCME : FazPlor FPSO ( Mooring Protection,

FMC Boatlanding, Riser Protection)

June 2006 - september 2006 : PT. Kali Raya Sari

Handil, East Kalimantan

Nature of work :

Conducting :

Visual inspection, Ultrasonic Testing, Magnetic

Particle Testing and Penetrant Testing for Piping,

Structure and Piling Construction of GTS (Gathering

Transmission Satellite)

Page

4/5

platform on TOTAL INDONESIE- TAMBORA TN10-EPSC 1

PROJECT., STRAITE MAKASAR.

May 2006 : Conducted for Magnetic

Particle Testing to inspect The the equipment of Oil

and Gas at PT. Komaritim, Handil, East Kalimantan.

By PT. Megatek Konsindo

Dec 2006 - June 2006 : PT. Meindo Elang Indah

Handil, East Kalimantan

Nature of work :

Conducting :

Visual Inspection, Ultrasonic Testing, Magnetic

Particle Testing and Penetrant Testing for Piping,

Structure and Piling Construction of GTS (Gathering

Transmission

Satellite) platform on TOTAL INDONESIE- TAMBORA EPSC

1 PROJECT. DELTA MAHAKAM.

July 2005 : Conducted for Ultrasonic

Flaw Detection to inspect The Boiler of PT. RAPP/RPE

Riau Pekan Baru.

By PT. Biro Klasifikasi Indonesia.

Sept 2003 - Sept 2004 : Conducted for Ultrasonic Flaw

Detection and Penetrant Testing to inspect The

Caterpilar Goods for PT. Thiess Contractor

Indonesia., (Sangatta, Kideco, Satui, Senakin, Batu

Hijau Lombok.

By. PT Sanggar Sarana Baja.

July - Aug 2003 : Conducted for Magnetic

Particle Testing to inspect The the equipment of Oil

and Gas at Indramayu (ENSCO 52)

By PT. Lekom Maras.

June 2002 - June 2003 : Conducted for Ultrasonic Flaw

Detection and Penetrant Testing to inspect The

Caterpilar Goods for PT. Kaltim Prima Coal, Sangatta,

East Kalimantan.

By. PT Sanggar Sarana Baja.

April 2002 - June 2002 : Conducted for Ultrasonic Flaw

Detection and Penetrant Testing to inspect The

Caterpilar Goods for PT. INCO, South Sulawesi.

By. PT Emasindo

PAGE 5/5

February 2002 : Conducted for Ultrasonic Flaw

Detection and Penetrant Testing to inspect The

Caterpilar Goods for PT. NewMont Nusatengara,

Lombok, Sumbawa

By. PT Emasindo

May 2001 - Jan 2002 : PT. Graha Cipta Utama, Batam

Island,

Nature of Work.

Conducting UT/MT/PT for piping process, Offshore Pipeline, Pressure

Vessel, Structural Work, Hook Up and Thickness

Gauging on Barge and Super Tanker for various project

ie:

- PT. Nanindah Mutiara Shipyard, Batam

- PT. Jaya Asiatic Shipyard, Batam

- PT. Transalindo Eka Perkasa, Batam

- PT. Pan United Shipyard, Batam



Contact this candidate