Post Job Free
Sign in

Project Manager Engineer

Location:
Torrance, CA, 90503
Posted:
August 13, 2011

Contact this candidate

Resume:

DONALD DESCAMPS

**** ******* **., ***. ***, Torrance CA 90503

480-***-****

**************@*****.***

Summary

A seasoned Project and Operations Manager with International Manufacturing

and Continuous Improvement experience along with strong business acumen.

Possess strong and deep Continuous Improvement skills that include Six

Sigma, TPM, Lean Manufacturing, and many other methods. Able to apply

these skills in any organization to increase the Value and Cash Flow of the

organization.

Professional Experience

OSI Systems - Rapiscan Systems: Sr. Manufacturing Engineer

2008-Present

Generator Lab Manager 2009-

Present

Torrance, CA

Sr. Manufacturing Engineer responsible for production plan, BOM, drawing

accuracy, production efficiency, yields, implementation of lean

methodologies, and project manager for NPI and EOL products. Generator Lab

Manager responsible for personnel, planning, procurement, yields, and

quality issues.

. Manage Generator Lab P&L, Staffing, Supply Chain, Production,

Planning, NPI, and EOL

. Increased inventory turns of both raw material and FG while increasing

service level

. Standardized all processes, doubled productivity and output

. Increased yields by 30%, reduced labor costs by 50%

. Developed model to predict required labor-hours within 0.1% based on

demand mix

. Manage department budget; reduced year over year budget by 20% in

first year

. Saved over >$500,000 annually on warranty replacement costs

. Perform employee evaluations, set goals, and provide feedback

. Train employees and lead the implementation of lean methodologies, six

sigma, and TPM

. Implemented standard work, along with KPIs

. Mapped the flow, eliminated waste, and implemented a pull system with

single piece flow

. Reduced floor space and WIP required using single piece flow

. Set up kanban systems and continually identify Kaizen opportunities

. Implement statistical controls to identify defects and improve quality

. Lead cross functional teams for New Product Implementation and End of

Life

. Lead teams to deliver new products from engineering to customer on

time

. Work with suppliers from UK, Malaysia, and China

. Implemented safety program and material recycling program

. Review all Engineering documentation to identify errors or make

corrections

. Develop Lean methods and models for other departments to manage

processes

Advanced Micro Devices (AMD): Lean Program Manager

2007 - 2008

Austin, TX; Singapore, Malaysia, China

Lean management consultant to various organizations throughout AMD.

Develop Lean training material, lead kaizen workshops, and coach change

agents in order to create a Lean Culture at AMD.

. Implemented Lean in Asian manufacturing supply chain - $6B

. Coached and trained Singapore, Malaysia, and China Lean offices

. Reduced over $60 million in labor and holding costs

. Reduced Die-Prep lead-time by 50% and WIP ~$300K

. Eliminated Testing WIP by >$5M

. Introduced KPIs to improve lead-time, inventory, and efficiency

. Applied Lean to new product ramp plans

. Partnered with Plant management on lean implementation

. Eliminated bottlenecks, unnecessary operations, and excess material

. Implemented process to match supply and demand

. Increased inventory turns through inventory optimization

. Identified and eliminated data integrity issues through cross-

functional group

PepsiCo - Gatorade: Project Manager

2002 - 2007

Atlanta, GA; Phoenix, AZ

Performed project management activities for new equipment, products, and

processes. Filled various supervisory and TPM leadership roles, and worked

with both local and corporate organizations to meet all financial

objectives. The plants ran 24/7 year round, and included Regional

Distribution Warehouses.

. Focused Improvement (FI), 7-Step, and Rapid Changeover (RCO) Leader

. Project manager for Reverse Osmosis skid $1M, Motor Control Center

$800K, Flex I/Os, packaging equipment $500K, Cap Sorter $200K,

Filler/Capper Drives $300K, and new product launches $500K,

. Project Manager for capital projects worth >$2.5 Million

. Worked on multiple water conservation projects; Reduce or eliminated

usage, and utility costs

. Installed LEDS which increased plant efficiency by 10%

. Reduced changeover times by 66%

. Wrote capital requests, worked with contractors, and applied early

management principles to projects

. Drove the new equipment installation for the redesigned 64oz bottle

. Supply Planning and Integration Award in 2006 for the 64oz redesign

project

. Designed process line for the multi-flavored packaging

. Added multi-packaging capabilities to existing lines

. Labeler Specialist Supervisor, Production Supervisor, and Maintenance

Supervisor

. Performed maintenance planning and work prioritization

. Collaborated with Quality Assurance, maintenance, vendors, R&D,

production, and other departments

Indalex Mideast Aluminum: Process Improvement Engineer

2000 - 2001

Mountaintop, PA

Rolled out TPM and 5S methods to the plant. Worked with operations manager

and plant manager to train employees and schedule workshops.

. Lead implementation of Lean Manufacturing to reduce non-value added

tasks

. Introduced 5S, Total Productive Manufacturing, and continuous flow

techniques to processes

. Increased mill packaging efficiency through improvement projects and

Kaizen Blitzes

. Lead cross-functional team in anodizing to improve quality and

productivity

. Leveraged Statistical Process Control methods to eliminate all rework

on gold anodized aluminum

. Eliminated anodizing waste treatment bottlenecks without spending

money on new equipment

. Oversaw training for finish/polishing department of 6 employees

. Increased productivity on various parts by a factor of 25

Lockheed Martin Corporation: Process Engineer

1998 -2000

Fort Worth, TX

Worked as a Process Engineer on F-16, F-22, and F-35 Lightning II programs.

Maintained SPC applications, led Kaizen workshops, and implemented Lean

manufacturing methods.

. Drove statistical process control measurements for the F-16 and F-22

military planes

. Eliminated fastener rework on the F-16 leading vertical edge using Six

Sigma methods

. Mapped process flows, used Toyota Production System Tools, and

directed cross-functional teams

. Reduced part delivery lead-times by 85% and returned $26,000 of

inventory to stock

. Reduced Inlet Fuselage cycle time by 33% using 5S

. Eliminated waste using Systems Manufacturing Company Tools software

for line analysis

. Drove Lean Manufacturing thru kaizen events and 6S (5S + Safety)

. Identified, documented and mapped cost savings to be incorporated into

F-35 Lightning II

. Member of team that received the Industry Week's 1998 Top 10 Plant

Award and 2000 Shingo Prize Winner

EDUCATION

Arizona State University: Master of Business Administration, 1998

Arizona State University: Bachelor of Science, Chemical Engineering

Emphasis, Semiconductor Processing, 1996

SKILLS

Project Management SPC, DOE Training Supervisor

Maintenance Supervisor

Continuous Flow Lean manufacturing Kanban, Kaizen Inventory &

WIP Reduction TPM, 5S, AM, FI, PM Six Sigma

Centerlining Cost Management DFM, FMEA, EM Supply

Chain Mgt. Ops Planning Production Supervisor



Contact this candidate