SUMMARY

Graduate of Drexel University with a B.S. in Commerce

and Engineering. Experience includes Project Management

and Supervision in several industries; sales and

facilities planning in the construction industry;

systems engineering, design, and sales engineering in

the material handling industry; project engineering in

the distribution/fulfillment industry; Materials

Management in the telecommunications industry;

industrial engineering in the specialty steel and safety

equipment industries. Experience with AutoCAD,

Expedition, MSOffice, Lotus Notes, AS400, Navision.

EXPERIENCE

PENFLEX CORPORATION Gilbertsville, PA

2010 - 2011

Production Supervisor

Managed and trained employees in manufacturing

processes, including documentation, machine operation,

machine maintenance, product quality, and packaging.

Trained operators in safety procedures and encouraged

safety awareness. Monitored quality and quantity of

work produced.

AERZEN USA CORPORATION Coatesville, PA

2006 - 2009

Project Manager

Managed projects up to $1,500,000. Responsible for

verifying that capital equipment ordered meets the job

specifications, entering the order into the system,

getting quotes on non standard items, providing

submittals and Operating and Maintenance manuals to the

customer, and providing support during the entire

process and after delivery. Also an internal auditor

for ISO9001 program.

DRAEGER MEDICAL INFANT CARE, INC. Telford, PA

2005 - 2006

Industrial Engineer (through Aerotek CE)

Responsibilities included utilizing a KanBan system to

set-up the manufacturing process, creating cards and

modifying the quantities for each part and operation,

and sizing the storage containers used for each part, as

well as identifying which parts would be supplied on a

per order basis (non-KanBan). Also responsible for

scheduling and setting-up the facilities move to a new

location, including all operations and office

personnel. This involved facilities planning and

layouts, the actual move, and finally clearing out and

closing out the facility for subsequent sale.

LANDMARK BUILDING SYSTEMS, INC., Pottstown, PA

2003 - 2005

Project Manager

Managed all aspects of projects including submittals,

bid packages, sub-contractors, purchasing, record-

keeping using Expedition, and sign-off. Also

responsible for schedules, worksheets, invoicing,

maintaining records (change orders, RFI's,

communications), punch lists and close-out. Additional

duties included site superintendent and general

contractor on selected projects. Interfaced with

Owners, sales professional, engineers, contractors and

others in order to insure an acceptable final product

for the Customer.

LINENS 'N THINGS, INC., Swedesboro, NJ

2001 - 2002

Industrial Engineer - Logistics

Responsible for process and methods improvements in the

D.C. and Store Operations to improve productivity and

quality, increase retail $ per carton, and decrease the

number of non-conveyable cartons entering the D.C. Other

responsibilities include capital and expense budget

monitoring, increase capacities and reduce the overall

operating expense of the entire supply chain network,

and ongoing analyses of departmental processes, layouts

and procedures. Other duties included working with

vendors to improve shipping methods to the D.C.'s,

identify vendor compliance issues, and improve

merchandise flow to the stores. Coordinate capital

projects for all three D.C.'s from determining what is

needed, through vendor selection, quotes, and eventual

purchase and installation.

COMMUNICATIONS TEST DESIGN, INC., West Chester, PA

1999 - 2001

Materials Analyst

Managed and coordinated purchasing, inventory

management, and warehousing activities of all materials

for Engineering and Installation Department (E & I)

installations for multiple branches to ensure meeting

project schedules (including the coordination of

customer supplied equipment). Established procedures

and standards that increased materials available for on-

time delivery from 65% to 97%. Set-up vendor management

programs for selected inventory items both on and off

site. Supervised buyer, warehouse supervisor,

warehousemen, and material handlers.

ROBERT E. LAMB, INC., Norristown, PA

1992 - 1999

Facilities Planning Engineer, Sales and Marketing

(Business Development)

Planned projects ranging from under $10,000 to more than

$4,000,000. Planning functions included: location

analysis and site selection; operational, capacity, and

material handling analyses; site utilization plans; area

and equipment layouts; building definitions; schedules,

design narratives, flow charts, cost estimates, and

economic analysis including first costs and operating

costs. Type of work included renovations to existing

buildings as well as new construction. Developed and

recommended alternative solutions to fit within client's

budget and needs. Developed existing and new business.

Coordinated and managed all aspects of projects

utilizing several engineering disciplines through

project completion.

EASTERN CONVEYOR, Philadelphia, PA

1991 - 1992

Sales Engineer

Sales Engineer with responsibility for territory

development, which included establishing new accounts

and servicing existing accounts. Duties included

concept layout, pricing, proposals and presentations,

contracting service companies, project management, and

system start-ups.

RAPISTAN CORP., Willow Grove, PA

1989 - 1991

Conveyor Systems Engineer, Sr. Designer, Sales Engineer

Selected for the fast track sales training program.

Trained with the company's top sales engineers

throughout the country, backing up on key accounts and

closing on smaller accounts. Worked on projects ranging

from less than $10,000 to more than $2,000,000.

Involved with projects from the concept stage, to

presentations, budget pricing, firm pricing, and

proposals. Project managed orders from pricing to

vendor contact and selection, scheduling, customer

contact, expediting, and system start-ups.

QVC NETWORK, INC., West Chester, PA

1987 - 1988

Sr. Industrial Engineer/Project Engineer/Project Manager

Responsible for increasing productivity by 180% in

several departments by various methods improvements and

automation projects. Directed and coordinated all

projects from the concept stage through completion,

including the purchase of horizontal carousels, narrow

aisle equipment, and conveyor systems. Other duties

included contracting out any work needed to complete the

projects, and purchasing the equipment for the

projects. Other responsibilities included plant

layouts, production reports and analysis work for the

various departments, month end reports for the

Finance/Accounting Department, and preparing both the

departmental and capital budgets with weekly and monthly

follow-ups.

CARPENTER TECHNOLOGY CORP., Reading, PA

1978 - 1986

Industrial Engineer, Metallurgist

Responsible for incentive rates, time and motion,

tooling, and manpower studies; job descriptions, job

classifications, and material handling projects.

Responsible for developing and documenting policies and

suggestions; involved with methods improvements,

department layouts, and special projects as assigned by

management. Extensive and varied lab experience.

Supervised in the Transportation and Cold Rolling

Departments.