Post Job Free
Sign in

Engineer Project

Location:
United States
Salary:
USD 8000
Posted:
December 21, 2012

Contact this candidate

Resume:

CURRICULUM VITAE

[pic]

Name : Win Nyunt Aung

Nationality : Myanmar (Burmese)

Education : Bachelor of Engineering (Petroleum)

Date of Birth : 10 May 1967

Working Experience : 13+ years

Language : Myanmar, English

Marital Status : Married

Number of dependent : Spouse only

Current Location : Yangon, Myanmar (Burma)

SKILLS / EXPERIENCE:

. Petroleum Engineering (Production & drilling)

. 13 years experiences in oil and gas field (Exploration & Production)

. Computer literacy with knowledge of the following software.

o Well Surveillance: OFM

o Nodal Analysis: Well Flow, Prosper, PipeSim, Pipe Phase

o Microsoft Office: MS Words, Excel, Power Point Packages

SPE member number : 3271034

SPE Activity : Co-Author of SPE paper 144231

Poster Presented at EORC 2011 in KL, Malaysia.

Contact Address : 9-C, A-6, Thu-Dhammar street, Kyaukmyaung, Tamwe Tsp.,

Yangon, Myanmar

Contact Number : +95-973******

Working Experience

Superintendent (Planning and Production) (MPRL E&P Pte.,Ltd., Mann Oil

Field Project (Head Office, Yangon, Myanmar)

August 2009 - Up to now

. Prepare for the budget and work program for every fiscal year for

Project

. Assist to Planning & Production Engineering Manager

. Control and manage all of the oil and gas production operations.

. Issue Work plan, operational plan, HSE

. Implement field operation to be smooth

. Manage expense for each type of operation and to control the

budget/cost

. Invite to tender for new purchase item for materials

. Make technical justification and commercial justification

. Participate with the technical team (Multidiscipline team) as weekly

Technical meeting

. Planning and prepare for water shut off and selective stimulation

techniques for high water cut wells.

. Perform in-depth technical / engineering studies, write guidelines and

policy documents, initiate innovative proposals

. Review existing field monitoring procedures and recommend

modifications that will provide adequate monitoring of Artificial lift

equipped wells

. Provide technical support for operations including work over

operations, well testing, matrix stimulation, water shut off,

perforating and logging

Lead Petroleum Engineer (Field operations) (MPRL E&P Pte.,Ltd., Mann Oil

Field, Myanmar) October 2006 - August 2009

. Particitate morning project multidiscipline meeting and daily

operations meeting

. Manage for work over operations, well servicing, drilling, cementing,

completion operations

. Manage for operations program

. Manage for operating cost track

. Material planning for operations

. Monitor and trouble shoot producing operations and well integrity

. Communicate for all Myanmar Oil and Gas Enterprise's head departments

(Civil, Engineering, Transport, Electrical, etc.) for well site

preparation, Rig move, Rig up & Rig down.

. Control work over operations, well servicing, drilling, cementing,

completion operations.

. Lead / participate on multi-disciplinary teams, provide technical

advice and guidance, and mentor / train younger engineers.

. Provide the design, installation and operation of Artificial Lift (Rod

pumping, Gas lift, Electrical submersible pumps (ESPs etc.)

. Submit for operations program

. Check for operating cost track

. Check material for operations

. Generate field requisition for materials

. Plan to fabricate for equipments

Senior Engineer (Production, Work over Operations & Well intervention)

September 2004 - September 2006

. Coordinate with contractor & client for required service in

operations.

. Check & review pump setting depth & production relations

. Review & comments on well daily report & analyze for reservoir

performance

. Supervising, organizing, blending and mixing Cement / Acid /

Chemicals,

. Familiar with Cement bulking / Acid blending procedures to be followed

for all Cementing and Acid requirement.

. Participate on management team meeting & discuss about new developed

well & producing well's recovery system & require action on wells

(change Completion string design, Remediation & work-over operation-if

any )

Pulling Unit, Work-over / Well Intervention Supervisor & Drilling

Supervisor

February 2001 - August 2004

. Supervise on well servicing / work over operations

- Pump change

- Bailing

- Packer setting (R-3 compression, AD-1 tension) Elder Oil Tool

- Tubing Anchor catcher (Baker)

- Hydraulic Packer operations

- Set & retrieve for bridge plug (Elder Oil Tool)

- Work-over operation

- Drill / mill out Bridge Plug,

- New perforation & Additional perforation, Prepare for

perforation

- PC pump, ESP, Gas lift, rod pump installation

. Discuss with operation crew & management team before & after the job

. Supervise for drilling operation in onshore medium deep well and

deepening operations for existing producers.

Production Measurement Team Leader

October 1997 - February 1999, From February 2000 - January 2001, (Baker

Hughes E&P Solutions)

. Data collecting for production wells & dry wells

. General field study

. Check hourly rate for all wells

. Measure and record for API gravity from all well/ fault block/

formation

. Calculate daily production.

. Pumping unit installation, general inspection and maintenance.

Professional Training and Activities

. Basic Petroleum Geology,

(25 to 29 June 2001) in Myanmar

. Drilling Optimization & Well Planning Course,

(13 - 24 September 2001) in Myanmar.

. Water Flooding & Enhanced Oil Recovery Course

. Well Stimulation Techniques, December 2005.

. Project Management workshop course. (RV Management, Yangon Myanmar)

. Time Management training course. (RV Management, Yangon, Myanmar)

. HAZOP training course. (Crowne Plaza Mutiana, KL, Malaysia), Nov

2006.

. Performance, Predicting production using Nodal Analysis (Concorde, KL,

Malaysia) July 2009.

. Wellview Software Application Training (Pelonton Inc November,

2010.

. Formation Evaluation (GreenZyme (Enzyme EOR) treatment) course, Feb-

2010.

. Formation Damage: Risks and Remedies, June-2010.

. Radial Jetting Project (Field visit to TUHA oil field, XinJiang

province and Shanghai, China)

. SEMJET (Single Entry Multilateral Jetting) studied at Bangkok,

Thailand.

. Coil Tubing Application Training (December 2011)

. Attended to SPE EOR Conference 2011 in KL, Malaysia and presented the

poster presentation for SPE paper 144231 (EEOR Success in Mann Field,

Myanmar.)

. Attended to SPE meeting (Asia Pacific, BANGKOK branch) in September,

2011.

. Attended to SPE meeting (Asia Pacific, Singapore branch) in February

2012.

. Attended to "Maximizing Mature Field Output by Reducing Costs and

Related Production Chemistry" seminar, presented by Mr. William K.

Ott., PE (WCT), at Mann Oil Field, Central basin of Myanmar (Burma),

22-24 August, 2012.



Contact this candidate