ALI AGHAZADEH
* ******* ** ****: 905-***-****
Richmond Hill, ON L4S 2R3 ************@*****.*** Cell: 416-***-****
ELECTRICAL ENGINEER
Over 10 years experience in basic and detailed designs, feasibility studies, providing proposals, vendor evaluations,
management and project breakdown, supervision to construction, inspection of equipment and materials and quality
control activities regarding electrical systems for oil & gas projects and industrial plants
Engineering coordination with other disciplines and able to extract necessary information from P&ID's and mechanical
equipment list and use them in electrical documents
Problem solver and decision maker, self-motivated, responsible manner and reliable
CORE COMPETENCIES
ü Thorough knowledge of international standards such as IEC, IEEE, API, ANSI code
ü Modeling of electrical network and system studies (load flow, motor starting, short circuit)
ü SLD, schematic wiring diagram, substation layout and panel arrangement (MV & LV)
ü Specification, data sheet, equipment sizing, grounding, lighting, cabling, UPS&DC charger
ü Hazardous area classification
Software: Proficient in Auto CAD, ETAP, Dialux, Calculux, MS Office, as well as familiar with PDMS
WORK EXPERIENCE
Senior Electrical Engineer, Team Leader 2008 - 2012
I.G.C. Co (Iran International General Contractor) Tehran, Iran
Managed electrical team to prepare detailed design of below documents for LAVAN Island oil refinery upgrading and
revamping EPC project in Persian Gulf, Iran
Utilized ETAP software for modeling of whole electrical network system ■ Prepared load flow, short circuit current and
motor starting study■ Developed technical documents such as specification, data sheet and calculation ■Designed MV
switchgear and LV MCC single line diagram and substation layout ■ Developed hazardous area classification ■Designed
earthing and lighting layouts of plant and substations ■Designed cable route and trench section ■ Prepared electrical load
list and cable schedule ■ Prepared relay setting study and coordination curve documents ■Prepared materials requisition,
technical bid evaluation documents, man-hour and cost estimates
• Develop the electrical system to ensure safety to personnel during operation and maintenance, reliability of
services, ease of maintenance, convenience of operation, maximum interchangeability of equipment and
parts to be capable for future expansion of loads
• Conducted electrical team to review vendor documents in compliance with project specification, data sheet
and drawings as well as carried out the test of electrical equipments related to 6KV,7MW steam turbine
generator, 6/0.4 KV transformers, UPS & DC charger, HVAC, electrical motors, LV MCC & MV
switchgear, explosion proof materials, LV&MV& control cables, power management and control system
• Optimized cables and transformers sizing by considering the voltage drop and motor starting
• Selected the best location of substations by considering the topology of units and gravity of electrical loads
• Optimized the layout of MV switchgear and LV MCC so that the dimension of substation to be minimized
Page 1
PDF created with pdfFactory Pro trial version www.pdffactory.com
ALI AGHAZADEH
• Selected exact explosion proof equipment by considering the hazardous area zone to save cost in project
• Reviewed instrument load list to calculate and achieve the optimum size for UPS
• Chosen the appropriate equipment and protection device for MV&LV MCC feeders to save cost in project
• Optimized the generator sizing by considering the new and existing loads as well as load extension in future
• Considered interfaces between electrical and instrument panels by selected the best logic
• Prepared documents for extra works based on client new requests including changes to: budget, staffing,
equipment, schedule, and negotiated new terms with client as claim
Senior Electrical Engineer 2006 - 2008
P.E.E.D. Consulting Engineers Co. Tehran, Iran
Hired to review documents which prepared by contractor in crude oil pump station EPC project in Ahwaz, Iran
Reviewed documents such as: technical specification, data sheet, calculations ■ electrical load list, equipment sizing ■
SLD and logic diagram for LV MCC & MV switchgear ■ cable route & trench layout ■ lighting, grounding, HVAC
system and cathodic protection ■ ETAP report for load flow, motor starting & short circuit study
• Reviewed vendor offers in compliance with project specification, data sheet and drawings and made
technical recommendation to ensure project specifications were met sound
• Evaluated the technical proposals of vendors and selected effective bid
• Oversaw the testing of electrical equipment and creative test reports to client
• Organized existing technical information about turbo pumps units and data gathering with contractor to
utilize in ETAP model for achieving best situation in motor starting
Electrical Engineer, Supervisor 1999 - 2005
BALAGAR Construction Co, Tehran, Iran
Supervised to installation, modification and testing of 6/0.4KV Transformers, LV MCC, LV motors, lighting panels and
lighting fixtures, LV distribution panel boards, explosion proof materials, cable tray & ladders, grounding, conduits,
switch boxes, electrical wiring & cabling, receptacles, paging & fire alarm system and other electrical components for
below projects:
• South Pars Gas Field Development Phase One in Persian Gulf, Iran
• Waste Water Treatment project, Varamin, Iran
• Navab Complex Buildings municipal project, Tehran, Iran
EDUCATION
Bachelor of Science in Electrical Power Engineering- Major Power
University of Tabriz, Iran
PROFESSIONAL AFFILIATIONS
Recorded in PEO's official register as a member of (EIT) program and eligible to write (PPE) in Ontario, CANADA
Iranian occupational license for professional engineering (Grade One)
Page 2
PDF created with pdfFactory Pro trial version www.pdffactory.com