Everill E. Johnston
**** ***** ********* ***** - ****** Vista, Arizona 85650
Contact No. 520-***-**** Cell No. 520-***-****
email: *******@***.***
Profile: Superintendent
I am astute; results orientated manager and field engineer with proven
success in managing and building construction projects which include:
Nuclear/Gas Fired and Coal Fired Power Plants, Military Installations, US
Embassies, Copper Mines - [ Smelters, Acid Plants, Mills, Thickeners, Bag
Houses] - Waste Water Treatment Plants, Metal Recycling Plants, Heavy
Civil/Structural Steel, Mechanical Equipment and Process Piping,
Specialized Construction of Clean Room and EMI/RF Shielded Enclosures,
Commercial Buildings and Design/Build Projects. I provide operational
direction and guidance to sub-contractors, QA/QC Inspectors, engineering
teams, project managers, superintendents, and construction personnel. I
have worked extensively on Industrial/Mining/Power and Commercial
construction projects, ranging from 1 million thru 2.5 billion. My
professional experience and positions include: [Project Superintendent for
The ASHTON Co./CRSS & Energy Shielding Co. - Mechanical/Civil Lead Field
Engineer/Field Engineer and QA/QC Engineer for BECHTEL Construction -
Senior Project Manager/Engineer for NU-WAVE Shielding Co. - QA/QC Engineer
for Brown & Root and Henry J. Kaiser - NDE Level II Certifications for QC
Inspector & Technician in NDE Testing that include: VT, UT, PT, MT and RT
examinations & interpretations of welded structures and piping. My core
work experience is well rounded in all areas of SAFETY and CONSTRUCTION.
Core competencies include:
SAFETY Practices & Programs
QA Audits
Quality Management Systems
SAFETY Hazard Analysis
Site/Field Management
Proactive Problem Solver
SAFETY Training & Practices
Site/Field Engineering
Q/C Field Inspection/Testing
Professional Experience
Project Superintendent-Power/Mining/Commercial
2008 to 2011 - The ASHTON Company Inc. - Tucson, Arizona
o Responsible for the implementation of all Safety Programs and Company
Safety Policies/Manual and insured compliance with all industry Safety
Standards including OSHA and MSHA.
o Supervise the building and retrofitting of Gas and Coal Fired Power
Plants, Mining projects that included, smelters, mills, pit equipment
facilities, pump stations, acid plants, conveyors, wastewater
treatment plant, bag houses, bucket elevators and commercial recycling
smelter (New Construction).
o Responsible for implementing a system of quality control inspections
to ensure work performed in the field is of the highest quality and in
full compliance with the Quality Assurance Program.
o Consistently utilize proactive coordination/planning and communication
skills to mitigate possible stumbling blocks that could impasse
established milestones and construction schedules. I implement
strategic initiatives that focus in on the unique requirements of our
customers that ensure construction compliance with all technical
aspects for each project, and overall champion project teaming
collaboration/partnering efforts that help ensure milestones/schedules
and budgets are successfully achieved from project inception thru
construction closeout.
o Responsible for effective implementation of The Safety Program, Pre-
Bid Walk-downs, Estimating, preparation of CPM Project Schedule,
coordinate completion of punch list items and develop start-up
sequencing schedule, prepare weekly/monthly progress reports, and
coordinate the documentation of design conflicts and clarifications.
o Conduct daily/weekly schedule reviews with Field
Superintendents/General Foreman and sub-contractors for weekly/monthly
updates. Conduct employee reviews, make discipline and termination
decisions, determine training and development needs and conduct on-the-
job training.
o Mechanical, experiences include Pipeline Maintenance, new construction
and re-work on piping valves and pipeline, installation of pumps and
mechanical equipment, inspection of completed work performed in
compliance with ASME, API and ANSI codes and specifications.
o Projects included: Mining Acid Plant R&R Piping/Tanks, Mining Pump
Station, Power Plant Boiler Piping R&R, Mining Thickener R&R, Mining
Wastewater Treatment, Mining Conveyor repair, Mining general Pipeline
maintenance/repair/replacement/and cathartic protection, Mining
Smelter Bag house and Ball Mills, and Steel Recycling Smelter.
Senior Project
Manager/Engineer
2000 to 2008 - Nu-Wave Shielding Co. - Sierra Vista, Arizona
Are a leader and innovator in the construction/design/erection and
fabrication of EMI/RF Shielded Enclosures and specialized components for
clients in the Defense and Government sectors in a global market place. Nu-
Wave's home office located in Sierra Vista, AZ provides Design,
Engineering, Inspection, state-of-the-art patented products, manufacturing
and construction services that are second to none, they are a turnkey
operation, providing outstanding services from initial design thru final
contract closeout, with certified inspection and testing.
o Responsible for the implementation of all Safety Programs and Company
Safety Policies/Manual and insured compliance with all industry Safety
Standards including OSHA and Government Oversight.
o Supervise the construction/design/erection and fabrication of EMI/RF
Shielded Enclosures at US Military Installations, US Laboratories, US
Embassies and US Military Contractors Facilities in and outside the
United States.
o Responsible for effective implementation of The Safety Program, Pre-
Bid Walk-downs, Estimating, preparation of CPM Project Schedule,
coordinate completion of punch list items and develop start-up
sequencing schedule, prepare weekly/monthly progress reports, and
coordinate the documentation of design conflicts and clarifications.
o Supervised implementation of independent oversight activities required
by the Quality Assurance Plan and the Quality Assurance and Quality
Control Manual.
o Responsible for implementing a system of quality verifications
(audits, assessments, surveillances, performance monitoring,
inspections etc.) to measure and ensure compliance with approved plans
and applicable specifications, codes, ordinances and laws.
o Provide cross-functional team training, coaching, and mentoring.
o Provided periodic reports of Quality Control Inspection activities and
tracked qualifications and administered certification testing and
reviews of assigned QC Inspection Personnel.
o Responsible for implementing a system of quality control inspections
and materials testing to ensure work in the field is performed in a
professional quality manner, and ensures compliance with the Quality
Assurance Program.
o Promoted and established teamwork practices in all departments, which
help to ensure that our common goals are achieved, while also
promoting well-being, fulfillment, development and advancement on a
personal level.
o Conduct daily/weekly schedule reviews with Field
Superintendents/General Foreman and sub-contractors for weekly/monthly
updates. Conduct employee reviews, make discipline and termination
decisions, determine training and development needs and conduct on-the-
job training.
o A leader in project team coordination and implementation thru the use
of strategic initiatives that focus in on the unique requirements of
our customers and helps to ensure construction compliance with all
technical and construction aspects of each project, and also ensures
that milestones are successfully achieved from inception thru
construction closeout.
o Consistently utilize proactive coordination and communication skills
to mitigate possible stumbling blocks that could impasse established
milestones.
o Performed final QC inspections of completed construction projects
prior to turnover to the client.
Senior Project Manager/Engineer
1998 to 2000 - TG Construction Co. - El Segundo, CA
A leader in the construction industry and is a Licensed and Registered
General Contractor in the states of Arizona and California. The company
provides Design/Engineering and Construction services for the
defense/government and public sectors. TG's annual sales volume in Arizona
is approximately Forty million.
o Responsible for the implementation of all Safety Programs and Company
Safety Policies/Manual and insured compliance with all industry Safety
Standards including OSHA.
o Supervise the construction/design/erection and fabrication of a Design
Build Clean Room Facility at Raytheon in Tucson, AZ, Re-modeling of
Grand Canyon High School, Re-modeling of US Forest Service Albright
Training Facility, and Utility Substation Maintenance Facility.
o Responsible for effective implementation of The Safety Program, Pre-
Bid Walk-downs, Estimating, preparation of CPM Project Schedule,
coordinate completion of punch list items and develop start-up
sequencing schedule, prepare weekly/monthly progress reports, and
coordinate the documentation of design conflicts and clarifications.
o Conduct daily/weekly schedule reviews with Field
Superintendents/General Foreman and sub-contractors for weekly/monthly
updates. Conduct employee reviews, make discipline and termination
decisions, determine training and development needs and conduct on-the-
job training.
o Supervised implementation of independent oversight activities required
by the Quality Assurance Plan and the Quality Assurance and Quality
Control Manual.
o Responsible for implementing a system of quality verifications
(audits, assessments, surveillances, performance monitoring,
inspections etc.) to measure and ensure compliance with approved plans
and applicable specifications, codes, ordinances and laws.
o Provide cross-functional team training, coaching, and mentoring.
o Provided periodic reports of Quality Control Inspection activities and
tracked qualifications and administered certification testing and
reviews of assigned QC Inspection Personnel.
o Responsible for implementing a system of quality control inspections
and materials testing to ensure work in the field is performed in a
professional quality manner, and ensures compliance with the Quality
Assurance Program.
o Promoted and established teamwork practices in all departments, which
help to ensure that our common goals are achieved, while also
promoting well-being, fulfillment, development and advancement on a
personal level.
o A leader in project team coordination and implementation thru the use
of strategic initiatives that focus in on the unique requirements of
our customers and helps to ensure construction compliance with all
technical and construction aspects of each project, and also ensures
that milestones are successfully achieved from inception thru
construction closeout.
o Consistently utilize proactive coordination and communication skills
to mitigate possible stumbling blocks that could impasse established
milestones.
o Performed final Building/QC inspections of completed construction
projects prior to turnover to the client.
o Leader in the implementation of project management teams objectives
that assure compliance with defense and government protocols and
regulations, and also to ensure full compliance with local, state and
city building codes.
Professional Experience
CONTINUED and SUMMARIZED
1992 to 1998 Senior Project Manager/Engineer
Nu-Wave Shielding Co. Sierra Vista, Arizona
A Construction Contractor and fabricator/manufacturer of EMI/RF Shielded
Enclosures and related components for Military Installations, Government
Facilities, US Embassies and Military Contractors.
Responsibilities:
Managed all aspects of design, manufacturing, and site construction
processes/projects:
proposal/estimating process, site setup and project execution strategies,
scope definition of major subcontracts, schedule and manpower planning and
site management systems (scheduling, progress reporting, time reporting,
billing, etc): Planed, directed, coordinated and implemented construction
projects while ensuring project proceeds on schedule and within budget.
Oversight of research and development, construction estimates, planning and
implementation of project objectives: Interfaced with engineers,
architects, physicists and team members. Security Clearance was Disco
Secret.
1990 to 1992 Project Superintendent
CRSS INC., Houston, TX assigned to new construction, The United States
Embassy in Sanna', Yemen
Responsibilities:
Managed aspects of site construction process for new construction of the
United States Embassy in Sanna', Yemen: Design/Engineering,
proposal/estimating process, site setup and project execution strategies,
scope definition of major subcontractors, and site management systems
(design review, engineering review, scheduling, progress reporting, time
report, billing, EMI/RFI testing, etc) Interfaced with owners, designers,
engineers, architects and team members. Security Clearance was Disco
Secret.
1987 to 1990 Project Superintendent
Energy Shielding Co., Passaic, New Jersey
A Construction Contractor and fabricator/manufacturer of EMI/RF Shielded
Enclosures and related components for Military Installations, Government
Facilities, US Embassies and Military Contractors.
Responsibilities:
Managed aspects of site construction process for new construction of
EMI/RFI Shielded Enclosures at United States Embassies, Military
Installations, Military Contractors, Banks, Hospitals, and Foreign
Governments: Design/Engineering, proposal/estimating process, site setup
and project execution strategies, scope definition of major subcontractors,
and site management systems (design review, engineering review, scheduling,
progress reporting, time report, billing, EMI/RFI testing, etc) Interfaced
with owners, designers, engineers, architects and team members. Security
Clearance was Disco Secret.
1981 to 1987 Lead Field Engineer and QA/QC Engineer - Power - Mechanical
Bechtel Construction Inc., San Francisco, CA. assigned to various Nuclear
Power Stations in the United States.
Assignments, Positions and duties are as follows:
- San Onofre Nuclear Power Station Unit 1, in San Onofre, California
(Outage)
QA/QC Engineer - Mechanical and Civil Discipline:
Duties: Performed inspections of Mechanical Equipment/Systems,
piping/pipe supports, NDE of piping welds and structural welds,
structural steel erection, managed an as-built program for
piping, piping supports and weldments. Level II Certifications.
- Diablo Canyon Nuclear Power Station, Unit 2, in San Luis Obispo,
California (New Construction)
Lead Field Engineer - Mechanical
Managed aspects of site construction process: project execution
strategies, scope definition of major subcontracts, schedule and
manpower planning and site management systems (scheduling,
progress reporting, engineering reviews, non-conformance
resolutions, provided construction engineering support by
preparing construction specifications, statements of work,
equipment specifications, schedules, cost estimates and field
management related to construction and necessary for project
implementation in a safe, effective, and efficient manner.
- South Texas Project Nuclear Power Station, Unit 1 and Unit 2, in Bay
City, TX (New Construction)
Mechanical Field Engineer
Duties: Oversees construction progress, field inspections, and
implementation of project objectives, provided construction
engineering support by preparing construction specifications,
statements of work, equipment specifications, schedules, and
field management related to construction necessary for project
implementation in a safe, effective, and efficient manner.
- San Onofre Nuclear Power Station Unit 2 and Unit 3, in San Onofre,
California (Outage)
Mechanical Field Engineer
Duties: Oversees construction progress, field inspections, and
implementation of project objectives, provided construction
engineering support by preparing construction specifications,
statements of work, equipment specifications, schedules, and
field management related to construction necessary for project
implementation in a safe, effective, and efficient manner.
1980 to 1981 QA/QC Engineer Level II - Mechanical - Nuclear Power Plant
Henry J. Kaiser Construction Co., assigned to Moscow, OH, - Nuclear Power
Station Unit 1
Duties: Performed inspections of Mechanical Equipment/Systems,
piping/pipe supports, NDE of piping welds and structural welds,
and structural steel erection. Held Level II Certifications.
1979 to 1980 QA/QC Engineer Level II - Mechanical/Civil - Nuclear Power
Plant
Brown & Root Inc., Houston Texas, assigned to South Texas Project Nuclear
Power Station
Unit 1 and Unit 2, Bay City, Texas.
Duties: Performed inspections of Mechanical Equipment/Systems,
piping/pipe supports, NDE of piping welds and structural welds,
and structural steel erection. Held Level II Certifications.
1975 to 1979
Evans Steel Company, Gilbert, Arizona
Manufacture and Erector of Structural Steel and Pressure Vessels U and R
Stamp
QA/QC Inspector:
Performed inspections of Mechanical Equipment/Systems,
piping/pipe supports, NDE of piping welds and structural welds,
structural steel erection, welder certifications and procedures
and performed hydrostatic testing of pressure vessels. Held AWS
CWI Certification.
Pipe Fitter/Welder and Structural Steel
Fitter/Welder
Duties: Fabrication and welding of piping/pipe supports and
pressure vessels. Fabrication and welding of structural steel
components and structural steel erection.
PROFESSIONAL CERTIFICATIONS AND SAFETY TRAINING
ANSI N45.2.6 Certifications/Qualifications for Nuclear Power Stations
Inspections:
Qualified QA/QC Nuclear Inspector Level II in the following:
Civil Structures, Concrete, Soils, and
Coatings Inspections
Mechanical Components, Piping and Pressure
Vessel Inspections
Electrical and Instrumentation Inspections
(I&C)
Qualified QA/QC Nuclear Inspector Level II Non-Destructive Examination
and Testing:
Visual - Welding AWS and ASME Examination VT-
1, VT-2, VT-3
Radiographic Testing and Interpretation
Ultrasonic Testing
Magnetic Particle Examination
Liquid Penetrate Examination
American Welding Society - Certified Welding Inspector - (CWI)
SAFETY TRAINING:
-MSHA TRAINING
-OSHA 10 HOUR TRAINING
-OSHA 30 HOUR SUPERVISORY TRAINING
-TRN 120 - SCAFFOLD SAFETY AND COMPLIANCE - OSHA and CAL/OSHA - COMPENTENT
PERSON
-NUCA EXCAVATION SAFETY and COMPETENT PERSON
-PERMIT REQUIRED CONFINED SPACE TRAINING
-RESPIRATOR FIT CERTIFIED
-SPECIALIZED SAFETY TRAINING FOR ACID PLANT CONSTRUCTION