Post Job Free

Resume

Sign in

Quality Control Manager

Location:
Moncton, NB, Canada
Posted:
July 28, 2013

Contact this candidate

Resume:

Randy S VanderWerff

***** ***** *** *****, ***** Valley, Ca 92284

Mobile Tel. 760-***-****

ab9m04@r.postjobfree.com

Professional Summary:

Proficient at implementing construction supervision, quality control and safety standards through more than

twenty three years of combined residential, commercial and industrial experience. Successful history of

working with federal, municipal and private entities in military (DoD), business, education and community

redevelopment sectors. Experienced in executing the three phase US Army Corps of Engineering Quality

Control System per contract requirements. Proven ability to achieve supervisory time and budget deadlines

from the kickoff to the punch out. Comprehensive training and working knowledge of OSHA and Navy /

Marine Corps jobsite safety practices. Computer skills include MS Office, Outlook, Project, Adobe Acrobat

programs and U.S.A.C.E. Resident Management System (RMS) experience.

Certifications:

• U.S.A.C.E. Construction Quality Management for Contractors, October, 2007 and renewed

September, 2012

• American Concrete Institute, Concrete Field Testing Technician Training, February, 2010

• American Concrete Institute, Concrete Strength Testing Training, February, 2010

• 30 Hour OSHA certification, December, 2007

• International CPR Institute, CPR/AED and Basic First Aid Certifications, April, 2011

• ECATTS – Personal Environmental Training, November, 2012

Education:

• Achieved a California Full Time Designated Subjects Teaching Credential in Construction

Technology, California State University San Bernardino, 2004

• The Superior Superintendent, Pacific Coast Builders Conference, 2004

• College studies include Economics, Marketing, English and History

November, 2012 to July, 2013

Quality Control Manager / Environmental Manager

Hal Hays Construction, Inc., Riverside, Ca.- Performed contract requirements for the Hash Mark Barracks

Buildings 1461 to 1467 Drainage Deficiencies project, 29 Palms MCAGCC. Demo, excavation, surveying,

grading, concrete retaining walls, asphalt, CMU and MSE (modular block) walls were all part of the Scope of

Work for this $ 800,000+ Bid/build project with an executed modification for MSE wall completion.

February, 2012 to September, 2012

Superintendent / Quality Control Manager

Pyramid Services, Inc., Santa Ana, Ca.- Performed contract requirements for supervision and Three Phase

Quality Control per U.S. Army Corps standards for the design/build Bldg 1663, 29 Palms MCAGCC. 6000

gallon domestic hot water tanks, associated pumps, heat exchangers, valves, plumbing and concrete pads have

been demoed and new installations provided for service to four barracks. New multiple point Metasys Direct

Digital Controls (DDC) system also installed for flow and temperatures and commissioning performed in

partnership with the ROICC and PWD Offices for this $ 700,000 project.

Randy S. VanderWerff, resume pg II

July, 2011 to February, 2012

Quality Control Manager

Allen Engineering Contractor, Inc., San Bernardino, Ca.- Performed contract requirements of the U.S. Army

Corps of Engineering (USACE) Three Phase Control System for the extensive $ 4.6M barracks renovation,

BEQ 1464, 29 Palms MCAGCC, NAVFAC SW. Duties included performing daily electronic QC Reports and

inspections of materials for compliance and of work performed, preparing and leading Preparatory and Initial

Phase Meetings and Follow Up work and conducting weekly QC Meetings in the observance of the USACE

system and plans and specifications, scheduling and overseeing special inspectors on site, maintaining a

Testing Log and Rework Items List, generating RFIs, updating As-Built drawings and providing guidance to

the customer to in terms of change order modifications and how to best achieve “value added” to the project .

Also responsible for reviewing and preparing submittals and maintaining a Submittal Register and Log.

Ensuring OSHA / EM-385 1.1 Safety compliance is another facet of this position. The scope of work included

demolition, asbestos abatement, new mechanical and domestic water systems, HVAC, electrical, drywall,

doors and hardware, flooring and roofing. This project logged more than 20,000 man hours.

January, 2010 to November, 2010

Quality Control Manager

November, 2010 to January, 2011

Quality Control Manager, Superintendent & Safety Officer for Close Out of Project

Peter Vander Werff Const., Inc., El Cajon, Ca. –Honored with AAA Naval Contractor Rating.

Completed executing the USACE Three Phases of Control system for the concrete and structural steel $ 4M

high profile Weapons Dynamics RDT & E Center, Naval Air Weapons Station, China Lake, California.

Among numerous other contractual obligations, responsible for reviewing and preparing more than 200

submittals and maintaining a Submittal Register and Log. The scope of work included extensive excavation,

concrete, underground and overhead MEP, telecom, interior finishes and large scale structural steel and

insulated panels for this 82 foot tall ordinance testing facility. Safety procedures are demonstrated in

observance of AHAs (Activity Hazard Analysis) and the EM-385-1-1. An “Outstanding” Evaluation was

received for this unique technical project from NAVFAC SW. It was completed on time and there were

no lost time accidents for more than 18,000 man hours on site.

June 2009 to November 2009

Quality Control Manager and Site Safety & Health Officer

Soltek Pacific Construction, Inc., San Diego, Ca.

Performed both of these roles for the construction of one laboratory and two testing facilities at the NAWS,

China Lake, California for NAVFAC SW with a total valuation of $ 16M. The scope of work included site

preparation, underground MEP (low and high voltage, fiber optic lines, water main, fire main, sewer) and

concrete forming, reinforcement and placement. There were no lost time incidences or violations recorded.

August 2008 to February 2009

Quality Control Manager

Halbert Construction, Inc., El Cajon, Ca.

Completed the Seismic Upgrade to Warehouses 402, 404 and 4 at the Marine Corp Logistics Base Barstow,

California. Exercised the USACE Quality Control system, with its three phases of control for NAVFAC SW.

Conducted bi-weekly QC Meetings and executed daily electronic QC Reports and inspections along with

updating logs and as-built drawings. Project work included 370,000 square foot PVC membrane reroof,

asbestos panel (transite) abatement, demolition and extensive interior seismic framing upgrades. An

“Outstanding” evaluation was received for this nearly $ 2,000,000 project with no lost time accidents.

Randy S. VanderWerff, resume pg III

November 2007 to June 2008

Superintendent / Safety Officer and Quality Control Manager

Peter Vander Werff Const, Inc., El Cajon, Ca. Honored with AAA Naval Contractor Rating

Successfully performed the three functions of Superintendent, Safety Officer and Quality Control Manager for

the two wing addition to the Yermo Fire Station, Marine Corp Logistics Base Barstow, California. Performed

procurement duties in acquiring low bids from subcontractors and provided start to finish supervision. Also

provided electronic daily reports and held QC and production meetings for these three distinct job functions.

The building was occupied 24/7 and a great deal of coordination was necessary with the customer. An

“Outstanding” evaluation for this design- build project was received from NAVFAC SW. It was also

completed on time and within budget with no lost time accidents.

August 2002 to July, 2007

Construction Manager/Project Manager

Boys and Girls Club Building Horizons Program, Palm Desert, Ca

2003 Coachella Valley Non- Profit of the Year Award recipient, providing vocational training in

construction trades and producing new affordable housing. Duties included blueprint revision and

submittals, permit processing, developing schedules and program media, broadening the donor base, public

speaking at groundbreakings and graduations, overseeing all construction, working in conjunction with

Riverside County Regional Occupation Program (ROP), various city agencies, subcontractors and vendors.

Additionally, graduates were assisted in obtaining job and/or higher education opportunities through the

established BIA Scholarship Fund. A few of the donors included Louisiana-Pacific Corp., Granite

Construction, Angelus Block, Guy Evans Inc., Eagle Roofing Products, WhiteCap and Milgard Windows.

August 2002 to June 2007

Instructor of Construction Technology

Riverside County Office of Education, Regional Occupational Program (ROP) Indio, Ca.

Completed five years of instruction and constructed five high quality affordable homes with students.

Emphasis was placed upon respect, safety and teamwork to develop skills, self esteem and a high quality

product. Duties included developing, organizing and teaching curriculum, mentoring, and overseeing the

construction process to deliver homes on schedule and on budget. In my five years taught more than 100

students with varying abilities. Overall, was proudly involved with the development and completion of

twelve homes and one commercial building and worked with well over 150 students from three school

districts in the Palm Springs area.

1985 to 1999

Laborer/Carpenter, C. VanderWerff & Sons Construction, Bonita, Ca,

Honored with AAA Naval Contractor Rating - A family owned business specializing in Southern California

Navy Construction for NAVFAC SW. New construction and tenant improvement projects include:

• 32nd St Warehouse Tenant Improvements, National City, 1985, $ 1.1M

• Tenant Improvements to Top Gun Hangers 1 & 2, Miramar NAS, San Diego, 1986, $ 1.2M

• Special Warfare Command Building for Seal Team 5, Naval Amphibious Base, Coronado, Ca, 1987,

$ 2.5M

• Admiral Kidd Officers Yacht Club (wood frame/stucco), Pt. Loma, San Diego, 1988, $ 1.1M

• Base housing (multi-family wood frame), Camp Pendleton, Ca., 1992, $ 880,000

• Amphibious Vehicle Delivery Station, Naval Amphibious Base, Coronado, Ca., 1988, $ 1.9M

• Mess Hall Renovation, MCAS Yuma, Az., 1989, $ 700,000

• Multiple BEQ/BOQ (barracks), Warehouse and Office Tenant Improvements at Camp Pendleton, Pt.

Loma, National City and Miramar NAS between 1987 and 1999, $ 10M+

• Computer Facilities Building, El Toro Marine Base, California 1990, $ 2.3M

• Bachelors Officers Quarters, March Air Force Base, Riverside, California 1991, $ 1.3M



Contact this candidate