Electrical Engineer Project Manager

Location:
Toronto, ON, Canada
Posted:
October 12, 2013

Contact this candidate

Resume:

Summary of Core Competencies and Attributes

Managed + $ 600 M power projects Stakeholder expectation management

Designed + 9000 MW Power Plants Contract administration & support

+10 yrs. consulting +14 EPC Risk, Claim and change Management

experience

Creates attainable project Technical and Sales Negotiation

objectives Skills

Skillfully manages the constraints Interpersonal &Presentation Skills

Balances Cost-Time-Quality-Scope-CS Leadership, Mentoring and Coaching

Summary of Professional Qualifications

. Excellent Project Management performance record by handing over 954

MW Power Plant ($400 million, 36 months, EPC) and Oil&Gas utility($200

million, 36 months, EPC) within agreed upon time and budget, with

higher quality, better profitability and the highest customer

satisfaction

. Have experience in Ontario largest Wind Power projects. South Kent

Wind farm with 123 wind turbines totaling 270 MW, including two

160MW/230 KV Collector Substations

. Honored with "plaque of honor" due to management of six million man-

hour of work executed in EPC project($200 million, 36 months) without

any disabling accident

. More than 14 years of design and execution experience in an

international EPC contractor, 9 conventional projects completed

(9x1000 MW, $ 3.6 billion) and 20X25 MW Wind Farms studied and

designed the electrical systems.

. More than 10 years of experience in an international consulting

engineers design review of drawings, detail design, calculations,

studies and technical documents of vendors, contractors site technical

support and oversaw installation and commissioning

. Proved proficiency in stakeholder expectation management and customer

satisfaction

. Experienced in proposal preparation: RFQ/RFP, Tendering, Contract

negotiation

. Professional is risk management, contact administration, claim and

change order management

. Strong leadership, coaching, mentoring, communication, problem

solving, initiative, and teamwork skills

. Worked in international projects environment and managed multi-

national contractors in projects and well known for valuing and

promoting diversity

. E.I.T( in process of P. Eng. License Ontario)

Summary of Work Experience

- Mobious Group http://mobiousgroup.com, Toronto, Canada Oct.

2012-Feb. 2013 & June 2013- Now

- Chief Electrical Engineer

- Off-Grid Renewable Energy Plant Study, Large Scale Energy Storage

System, Basic Design and Assist With Preparing Proposals, Technical

Negotiation, Preparation Of Business Case, Feasibility Study, Load

Flow, Short Circuit and Stability Study, Single Line Diagram,

Protection And Control, Connection To Grid Studies Impact Assessment

- Virelec www.virelec.com Toronto, Canada Feb.

2013- June 2013

- South Kent Wind Farm Project 270 MW, 230 KV -123xSWT2.3-101 Siemens

- MAPNA Company www.mapna.com, Iran

1998-2012

- Senior Electrical Engineer,

2007 - 2012

-Conducted Feasibility Study including Load Flow, Short Circuit and

Stability Study for connection to grid for nine 230 KV or 400 KV

Substations and relevant Power Plants and seven 33 KV Switchgear or

63 KV Substations and relevant utilizes, total capacity of which is

approximately as follows:

- 6000 MW Gas Turbine - 3000 MW Combined Cycle

- 500 MW Renewable Power (wind) - 100000 M3/day CHP (Power+

Water)

- Touss Power Plant Project Manager and Senior Electrical Engineer

2004 - 2007

6x159 MW V94.2 SIEMENS Gas Turbine Generators + 400 KV ABB

Substations

Independent Power Production project (BOO Scheme), 400 Million

Dollars

- South Pars Phase One Project Manager and Senior Electrical Engineer

2000-2004

- 4x 42 MW GE Gas Turbines + 3x2300 Cubic meters/hour KSB Sea Water

Pumps + 3x2000 T/Day Alfa Laval Desalination Plant+ 12000 Cubic

meters/Day Water Treatment Plant + 3x2000 T/Day Steam generation

Plant CCT+ 3x3250+1850 Cubic meters/hour Instrument/Plant Air

Generation Plant + 3x325 Cubic meters/hour Nitrogen Generation Plant

), Air Pack, 200 Million Dollars

- Electrical Engineer,

1998 - 2000

Basic Design, wrote Technical Specification and Performance

Specification for Electrical System and Equipment, Designed

Electrical System of Power Plants and relevant 230 KV or 400 KV

Substations and CHP utilizes and relevant 11 or 33 KV Switchgear or

63 KV Substations, including :

- Single Line Diagram - Layout - Bus Bar

- MV/LV Switchgear - Protection and Control - Transformer

- Cabling - Emergency Power - Battery System

- Lightning Protection - Grounding -

Lighting System

Accomplishments

- Recognized for high professionalism due to application of PMBOKR

guidelines in project management 954 MW Power Plant ($400 million, 36

months, EPC) and Oil&Gas utility($200 million, 36 months, EPC) which

are in commercial operation since 2007 & 2010, both finished with

higher project profitability than expected and within agreed upon

budget and time with higher quality

- Honored with "plaque of honor" due to management of six million man-

hour of work executed in EPC project($200 million, 36 months) without

any disabling accident

- Appreciated for Wining $1800 M international tenders by best proposal

strategy and preparing technical and commercial proposals for several

EPC (engineering, procurement, and construction) projects for power

generation and relevant High Voltage substation, and participated in

whole bidding process and technical and sales negotiations

- Assigned full responsibility for Feasibility Study and Designing

Electrical System of more than 9000 MW Simple Cycle and Combined Cycle

Power Plants (9 sites), 500 MW plus 100'000 cubic meter per day

desalinated water in Combined Water and Power Plants (CHP) and 500 MW

Winds Power Plants (20 sites). Recognized for the excellent using of

Value Engineering methodologies in the projects

Summary of Computer Software Skills

-ETAP - ASPEN - MS Word

-Expert Choice - Mind Manager

- Power Point

Education and Professional Development

- Master of Science Electrical Engineering 1980

- PMP 2013

- Value Engineering 2012

- Project Risk Analysis 2010

- Claim Management 2010

Professional Membership

- Member - American Project Management Institute (PMI)

- Member - Iranian Electrical and Electronic Engineer (IEEE-Iran)



Contact this candidate