Post Job Free
Sign in

Project Manager Construction

Location:
Dover, PA, 17315
Posted:
August 20, 2012

Contact this candidate

Resume:

RESUME'

Name: Nadim Jaouni

Qualification : U.S. Army Engineering School Diploma /

Infrastructure/ heavy utilities equipment (1982) United States Army.

Date of Birth : March 13 1961

Languages (WRS) : English as a mother tongue, and Arabic, strong

background in Hebrew and German

Address : 48 Mayfield St.

Dover Pa. 17531

Contact number: Home: 717-***-**** Mobile: 717- 881-9265

Email: ******@*****.***

Details of my experience are enclosed herewith.

I have total experience of over 30 years in the field of Construction

Management, as follows:

Heavy infrastructure such as District Cooling, Water Treatment, Gas

and Oil projects, commercial, retail, industrial, residential, hi rise,

facilities management, hotels, hospitals, and refurbishment.

Supervision of 500 personnel plus. Emphasis on timely and quality in

delivery

USA

8+ years with United states Army

8 years with Property Developers

Gulf

Qatar and Saudi Arabia - 10 Years with General Contractors

4 years with Steel Construction and

Electromechanical Contractor

Dubai 7 years with General and Electromechanical Contractors and

design consultants

I am fully familiar with FIDIC and JCT contract editions, costing of the

Projects, monitoring of the Projects and local market.

I am a holder of valid Driver license.

I am confident that I will fulfill the requirements of the post.

EXPERIENCE

From November 2004 to July 2011

Drake & Scull Int. Dubai.

Post held Sr. Construction Manager

Duties: Coordination with all Lead Sector Contractors and

Consultants,

Supervision of Staff and Subcontractors. Monitoring progress and

cost. Project Management, Chairing the Progress & Technical

Coordination Meetings, Settling of EOT claims, Finalization of

Contractors Final Account and variations, Liaison with Client from

inception up to execution, Coordination of Client’s requirement with

design/drawing development

Works executed:

Managing the construction of a 60,000 refrigeration tons District

Cooling Plant, World Largest Station, for Jumeirah Beach Residence,

the largest in the world, including 11 kilometers of steel pre insulated

reticulation piping (42”) and around 50 energy transfer stations.

Reticulation line for District Cooling Plant on Jumeirah International

Staff Accommodations Project, approximately 10 kilometers of pre

insulated steel pipe. Preparation for Haddeed District cooling project

in Jubail, Saudi Arabia. Managing a design build 49,000 ton District

Cooling plants on the Palm Jumeirah Crown Trunk. Upgrading of two

District Cooling plants Discovery Gardens. Three Plants totaling

90,000 R.T for the expansion of Discovery Gardens. Dubai Sports City

PCCP Reticulation Network design and tender documents, Central

Cooling Plant design and tender documents, DAFZA Chiller Plant

modification design and supervision, and working on various other

District Cooling projects either in design or in construction. Four

cooling plants at the Palm Crescent totaling 120,000 R.T.

From 1994-2004

Company Contracco Engineering Works, Doha Qatar and Saudi

Industrial Contracting Co/ METSCCO Steel Construction Co. Riyadh.

Posts held : Projects Manager

Duties and works executed: Management of various projects in Oil

and Gas. Works with Armco, SECO, and other private industrial

Projects, including the total fit up of an ambitious state of the art

laundry facility for Al Rajhi group. Extensive works With Upgrading in

the Jeddah and Rabigh refinery. The second phase construction of

the Al-Uldeid Air Force Base in Qatar. Renovation of Doha

international Air Port. Full refurbishment of the historic Cleopatra

Building down Town Doha. Various other Commercial and residential

Projects, including the prestigious Al-Massilah Town Home

Compound in the Al- Rayyan area of Doha, and the armory building in

Al- Siliya Army Depot.

Project Manager for Doha West Sewer Affluent line refurbishment,

over thirty kilometer 40” pipe line, Project Manager for the

refurbishment of the ministry of interior sewer pumping station.

Project Manager for refurbishment and additions for Hammad

hospital. Managing several projects simultaneously with total

satisfaction to company, consultant and client

From 1985-1989

Norsab Inc. Wheaton Maryland

Post Held: Project Superintendent/ Custom Home Division

Accomplishments includes but are not limited to, Highlands of

Darnstown, Brookville Estates, Hill Top Square and Norbeck Estates.

All are semi-custom home subdivisions in Maryland. Norsab was a

custom/ semi-custom home builder.

http://www.itp.net/491608-drake-scull-to-set-world-record-on-jbr-cooling-job

Excerpt:

All ITP newsletters »

Saturday, 4 June, 2005

Drake & Scull to set world record on JBR cooling job

Logistics

A major issue for the Drake and Scull team has been coordination and

logistics.

The contractor is installing its 1.5 m diameter district cooling network

right through the middle of the biggest building site in Dubai, and

there are a lot of other contractors that need to be kept on side.

The job of ensuring this all goes according to plan falls to Nadim Al-

Jaouni - a veteran of the US Army Corps of Engineers and

construction manager on the project.

It is his task to ensure Drake and Scull’s operations on the site

interface correctly with the ongoing building and civil work.

He also liaises with all the lead contractors and consultants to ensure

the job runs smoothly.

And that is a difficult logistical balancing act made even more

problematic by a shortage of suitably qualified labor.



Contact this candidate