Aaron Hunt
*** ********* ***** • McMurray, PA ***17
724-***-**** • *********@*******.***
Lean Leader
Hands-on Lean manager with extensive experience in Lean Six Sigma transformations, successful
application of continuous improvement tools, personnel development, new product development and
coordinating multi-site technical teams. Extensive experience in customer-facing situations. Unique blend
of technical and interpersonal skills used to improve business performance.
Project Management • DMAIC • Lean Manufacturing • Heijunka • 5S • SPC • Kanban
Product Development • DFMA • Poka-Yoke • Pull Systems • JIT • Continuous Flow
Oracle ERP • SMED • Problem Solving • Kaizen Leadership • Training • Mentoring
Professional Experience
Accellent, Inc. • Houston, PA / Buffalo, NY • May 2003-May 2012
$500 million medical device contract manufacturer owned by KKR.
Engineering Manager/Project Manager
Mentored technical staff in New Product Development and Continuous Improvement engineering
roles. Spearheaded creation and development of Lean Transformation Plan with full ownership
and responsibility for achieving margin growth through continuous improvement activities.
Trained entire facility workforce in lean principles and facilitated 5-day Kaizen events to
aggressively pursue lead time reduction, 5S, SMED, and level scheduling.
Exceeded revenue target by 20% and EBITDA target by 50% in Q1 2012
Reduced NPD lead time by 50%, doubling realized NPD revenue in 2011
Achieved 20 point EBITDA improvement in 2010 at PA site
Achieved 15 point Op Profit improvements in 2007 – 2008 at Buffalo site
Visited potential customers to review designs and initiate manufacturing partnerships
Reduced set-up time by 99.8% in dedicated needle production cell producing 63 items
Reduced WIP by 95% and lead time by 96% in same cell
Reduced delivery lead time to strategic customer from 8 weeks to 1 day
Reduced lead time on highest volume product from 63 days to 7 days
Reduced set-up times by 85% in high mix machining department (900 items)
Benshaw Controls • Glenshaw, PA • Sept. 2006- Jan. 2007
Project Manager
Led design and start-up of manufacturing facility in Fort Smith, Arkansas. Identified facility,
managed contractors, hired and trained workforce, and installed continuous flow manufacturing
line in 5 months. Supervised project team that included design team in Pittsburgh, PA; technical
team and prototype builds in Pueblo, CO; production team and customer engineering team in
Fort Smith, AR. Delivered product twice daily to customer from day one of operations. Less
than 8 hours WIP between customer production line and Benshaw FGI.
• •
Aaron Hunt Page 2 *********@*******.***
PA Transformer • Canonsburg, PA • Nov. 2000- May 2003
Manufacturer of single and three phase power transformers and voltage regulators for the
investor-owned electrical utility, public power, municipal power, and industrial markets.
Power Test Technician
Steer Process Flow/Task Analysis Team to initiate the company’s Lean Journey. Member of
Lean Manufacturing Decision Making Team. Negotiate with union leaders during lean
implementation. Perform Quality testing on commercial utility transformers, execute regular
equipment calibration and electrical engineering design testing.
Sony Electronics • New Stanton, PA • July 1995- Sept. 2000
Multi-billion dollar electronics manufacturer. Assembled large screen TV’s for US
and international markets at Sony Technology Center-Pittsburgh.
Line Coordinator / Industrial Engineering Technician
Mentored under Taka Shimada (top Sony Lean expert) from 1996-2000 in Lean Manufacturing.
Six Sigma Greenbelt certified in 1996. Led 135 company members to record setting
achievements on multiple production lines and manufacturing cells. Participated in Sony’s 1st
lean cell in the United States in 1995. Trained all direct reports in performance metrics. After
training and mentoring, one 90 person team exceeded all performance metrics for 8 months
without direct supervision by utilizing standard work and level pull systems.
Designed and executed implementation of the assembly area for six manufacturing cells.
Achieved 20% capacity improvement on fastest production line through standardized
work, generating $200k increase in daily production revenue capacity.
Increased productivity by 400% on high-end XBR line by utilizing cellular flow and
standardized work
Consolidated 4 types of screw and 2 washers into 1 screw through application of DOE
Education and Training
Bachelor of Science, Technical Project Management
Associate, Electronics Engineering Technology
ITT Technical Institute
Biology and English – 2 years completed
Bethany College, Bethany, WV
Professional References for Aaron Hunt
William (Bill) Howell
Former Chief Information Officer – Accellent
35 Andover Country Club Lane
Andover, MA. 01810
(H) 978-***-****
(M) 610-***-****
*******.******@******.****.***
Chad Werts
Executive Vice President of Operations – Immco Diagnostic
Former Director of Operations – Accellent
19 Pawtucket Row
Orchard Park NY, 14127
(H) 716-***-****
(M) 716-***-****
*******@*****.***
Jane Sanders
Account Manager at Life Search Technologies
11350 McCormick Road
Executive Plaza III, Suite 604
Hunt Valley, Maryland 21030
(M) 410-***-****
********@**************.***