Post Job Free
Sign in

Electrical Engineer

Location:
Abu Dhabi, AZ, United Arab Emirates
Posted:
September 10, 2013

Contact this candidate

Resume:

September *, ****

Dear Sir

I have been working in the oil and gas field for about 12 years. My

interest in oil & Gas industry started after my graduation when I began to

look for a carrier at an oil & Gas company.

The chance came when I was appointed as an electrical maintenance engineer,

Rashid petroleum Company in Egypt. I gained much experience in carrying out

the different activities appointed to me in the different plant facilities

in the onshore fields, offshore platforms, marine ports and metering &

exports terminals.

My responsibilities included participating and supervising the different

Operation and maintenance activities (preventive, predictive & corrective

maintenance) of the electrical equipments including generators, motors,

transformers, HVAC, lighting, gas turbines, diesel engines,

switchgears...etc then feeding back in our computerized maintenance

management system (CMMS). I was also responsible for supervising the

different taskforces, carrying out toolbox talks and risk assessment and

job safety analysis managing to optimize the required manpower and maintain

their own safety as well as securing the company's assets' integrity and

improve its equipment reliability.

After two years, I as appointed as a senior authorized electrical personnel

(SAEP) responsible for the maintenance and operation of the higher voltage

levels of the power system.

Then in 2004 I had the chance, as a part of the operation team, to

participate in the company's new project (Scarab/Saffron) the first gas

production from the deep water in the Middle East. The project was

implemented by the major design and construction companies in the world. I

was part of a team responsible for reviewing the project specifications,

preliminary design and follow up the construction works onsite and if

required raise the required punch lists and site queries on behalf of the

operation team. Then I had the chance to participate in the preparation of

the black start procedure of the plant. Finally, I was a part of a team

responsible for the preparation of the maintenance inspection work

instruction (MIWI) of the plant's electrical equipments.

Then in 2005 I had the chance to achieve the same role in the plant new

facilities in simian, sienna and sapphire then in the phase 2 of Rosetta

fields.

I had had the honor to be a part of the plant operation team reaching a

production record of more than 2500 MMSCF/D and a record of 9 million man

hours without ant lost time injury (LTI).

I was then transferred to the Egyptian LNG (A major multinational gas

liquefaction Co.) where I was appointed as an electrical engineer.

Finally, I shifted my career towards the Gulf region in the year 2008 to

join ZADCO as one of the major oil fields of ADNOC (UAE) as an electrical

engineer in the Maintenance support Department of ZIRKU Island producing

oil over 800,000 BPD.

I do believe that I can contribute to success of your reputable company.

Sincerely yours,

Tamer A. El Shazly

ELECTRICAL ENGINEER

CURRICULUM VITAE

TAMER AHMED MAHMOUD EL SHAZLY

BEHIND 75 EL GEISH WAY, SPORTING, ALEXANDRIA, EGYPT

TEL: + (971-**-******* / +(20-114-******* / + (20)35776234

**********@*****.***

CARRER OBJECTIVES

A challenging position in a remarkably reputed organization, which leads to

a well-planned career that utilizes my experience, upgrades my abilities

and stimulates my ambitions.

Key Skills

. Busy, High Volume Environments

. Excellent Written & Verbal Skills

. Excellent Report Writing

. Presentation skills

. Interpersonal Communication

. Mature Team Support & Leadership

. Regulatory Compliance Knowledge

. Time Management & Prioritisation

. Multi-tasking & Organisation

. Team working Capacity

. Positive Nature and Strong Work Ethic

EDUCATION

. BSc. Engineering

. Electrical Department.

. Faculty of Engineering.

. Alexandria University.

. Grade of Graduation: Very Good.

. Date of graduation: May 2000.

LANGUAGES

. Arabic: Mother Tongue

. English: Excellent

. French: Fair

COMPUTER SKILLS

Excellent user of Microsoft Windows, Microsoft Office (Word, Excel,

Access, PowerPoint Microsoft Outlook, Internet browsing,

Graphics programs (AutoCAD, Photoshop, Paint Shop-pro

Computerized Maintenance Management Systems (CMMS (Global Maintenance

Solutions, SAP, and MAXIMO).

Ability to interact with new software and good knowledge of computer

hardware and preliminary troubleshooting.

UNIVERSITY GRADUATION PROJECTS

ELECTRICAL POWER PROJECT: Rehabilitation and expansion of 66/11 kV

substation and distribution network in Alexandria with the following

tasks carried out: data collection, load analysis & load growth, load

flow, short circuit calculations, design of protection scheme and

relay coordination and reactive power compensation on the medium

voltage network.

PROJECT'S GRADE: Excellent

ELECTRICAL MACHINES PROJECT: Computerized design of induction motors

using Hand calculations & Matlab computerized programs.

PROJECT'S GRADE: Excellent

PREVIOUS TRAINING EXPERIENCES

MOBIL OIL: Complete training over the whole production line of Mobil

oil (Mex Terminal-Alexandria) including quality control, system

observation using automatic control systems, wiring, and PLC,

packing, storing system using Hi-Rise, pigeon holes and Cranes

controlled by a computerized system.

CURRENT AND PREVIOUS WORKING EXPERIENCES

ZAKUM Development Company (ZADCO) UAE (04/6/2008 till Now):

Worked in ZADCO (one of ADNOC companies, JV with Exxon Mobil) as an

electrical engineer in the Maintenance support Department on ZIRKU

Island where the main facility of the oil and gas processing exists

prior to oil and gas export.

Duties included giving required assistance the electrical maintenance

and operations team while carrying out major maintenance activities

of the various electrical equipments.

Also supervising the outsourced contractors during projects

implementation, Electrical Equipments installation testing and

commissioning as a part of the electrical power system complete

renovation and refurbishment, ensure proper and safe implementation

of the work done by the contractor as per company issued scope of

work as well as relevant standards and recommended work practices,

raise and coordinate PTW and preparation of JSA.

This includes projects of Packaged S/S replacement, transformers

replacement (Up to 25.6 MVA), New Switchgears, Distribution boards

and cabling installation, low voltage switchgears, UPS's, Battery

chargers replacement, power transformers replacement, analysis and

health check and oil replacement, PCB contaminated oil replacement,

generators refurbishment and repair, Cathodic Protection System

Renovation, Heaters Burner Management System Upgrade, installation

and testing of fire alarming and detection systems, H2S wireless

detection system, new RO units, lighting projects.

Regular feedback of the projects activities and work progress to job

officer and Team Leader in the HQ.

Egyptian LNG (From 20/5/2007 to 1/6/2008):

ELNG is a JV with British Gas (BG), PETRONAS and Gas De France,

Worked as an Electrical Specialist in the maintenance department. My

Duties includes performing as well as supervising the different

maintenance, troubleshooting and planning of all the electrical

related activities. It includes also planning and preparing for the

activities carried out during the process planned shutdown. The

Involved equipments included:

. 4 Gas Turbines (17.2 MVA ISO rated Each, Siemens, 11 KV)

. 8 Substations (11 KV, 3.3 KV and LV distribution switchboards,

ABB Unigear).

. 4 Emergency diesel generators (CUMMINS)

. 3.3 KV motors (for inst air compressors, LNG loading pumps,

Turbo compressors starter motors ...etc).

. About 500 LV motors driving fan coolers and pumps

. 38 step down transformers to the different utilization voltage

levels serving the 8 substations.

. UPS's (C.E.G. Italy) and Battery Chargers (ABB)

Duties also covered analysis of the equipments failure and history,

preparation of purchase requisitions for the 2 years spare parts,

updating the Maintenance work instruction when required and prepare

of maintenance checklist, defining and purchasing the required

electrical tools and special measurement and logging devices,

following up the permit to work system and isolation activities in

the HV switchgears.

I also took part in the team responsible for making a bid for the Gas

turbines service agreement between the OEM and competitive companies.

RASHID PET. CO. (RASHPETCO) EGYPT (From 6/2002 to 20/05/2007):

RASHPETCO is a joint venture with BG, Edison and PETRONAS, a gas

company producing about 40% of Egypt's gas production

Worked as a Senior Authorized Electrical Maintenance engineer (SAEP)

in the company electrical department. This includes maintenance,

troubleshooting and operation of the onshore and the offshore

terminals and facilities as well as the electrical equipments of the

remote export terminals; this covers the preventative, protective and

corrective maintenance of the following equipments:

Gas turbines & Generators:

> Speed controllers' software configuration and maintenance

> Caterpillar, Deutz and Perkins Emergency diesel generators,

control system and generators protection.

> Switchgear operation, protection system and maintenance

> Power and distribution transformers.

> Cathodic protection system

> UPS and chargers

> Other plant auxiliary electrical equipments

V Electric heaters for Natural Gas

V Distributed outlets and welding sockets.

V HVAC units

V Cathodic protection system (Impressed current system).

V Plant earthing network.

> Electrical power analysis and Database tools:

V Power and Harmonic Analyzer

V Transient and power system disturbance analysis.

V Power Quality monitoring & Electrical Data Loggers.

V Electrical Distribution Supervisory system

EXXON-MOBIL EGYPT (from 1/2002 to 6/2002):

Worked as an electrical maintenance engineer for the production line

of Mobil oil (Mex Terminal-Alexandria) including quality control,

system observation using automatic control systems, wiring, and PLC,

packing, storing system using Hi-Rise monitored by an IBM server and

controlled by a SIEMENS PLC, pigeon halls and robots controlled by a

computerized system. Also as a maintenance and instrumentation

engineer in the Automatic Batch Blending (ABB), in-line blending

(ILB) and the In Line Grease Manufacturing Unit (ILGU).

SPECIAL ROLES AND ACHIEVEMENTS

COMPANY MAINTENANCE INSTRUCTIONS & MAINT. STRATEGY ESTABLISHMENT

> Taking part in preparing the MIWI (Maintenance Inspection Work

Instructions) and work method statement for all the electrical

equipments in the plant based on each equipments manufacturer

maintenance manuals and also upon the known electrical standards

and codes of practice (IEE, IEC this includes the steps and

procedures to be followed while carrying out the preventative

maintenance and their duration (Calendar based and running hours

based)

> Taking part in planning all the electrical activities to be

carried out during total plant planned shutdown preparing the

jobs procedures, duration and time frame, required tools and

additional manpower and coordination with the different

disciplines.

> Taking part in the preparation of the procedure required in

transferring the plant projects from temporary power generation

to permanent turbo-generator power supply with minimum process

interruption.

> Assessing and studying the engineering changes of the electrical

system in order to improve the system reliability through the

engineering management procedure and engineering investigation

reports raised to the technical managers.

> Taking part in ordering and following up the two years spare

parts for the plant's electrical equipments.

> Gathering the required documentation and ensuring the

availability of the required information of the electrical system

(Operation and maintenance manuals, drawings, wiring

diagrams...etc).

> Generate new ideas for the technical and department managerial

and manpower organizing issues for the sake of work environment

improvement and maintenance ease.

> Being a part of the plant safety team participating the different

plant safety programs STD (See, Think, do), SAP (Safety awareness

program) and BBS (Behavioral Based Safety).

> Being a part of the company's asset integrity team responsible

for preparing the asset integrity documentation and programs

during the audits.

> Assuring that all the electrical maintenance and corrective

activities are carried out in a safe manner through the permit to

work procedure (preparation of the job method statements, risk

assessment, toolbox talk, proper isolation, lockout and tag out

procedures and issuing electrical permit to works if required.)

> Being part of the electrical activities internal auditing team.

> Carry out on job training for the junior company staff as well as

the electrical performing authorities (Technicians and

supervisors).

> Being a part of the company's stretching emergency response team.

> Certified since 2004 as a senior Authorized Electrical Person

(SAEP).

> Certified by ABB to carry out maintenance and repair for

explosion proof equipments.

CONSTRUCTION ANF PROJECT EXPERIENCE

Shared and supervised the construction, commissioning, Start Up and

the preliminary operation of the BURULLUS project (SCARAB SAFRON

(Main contractor: Deep Marine Concession (DMC) Bechtel, Intec &

Cameroon) & SIMIAN/SIENNA & SAPPHIRE (Main Contractor: Technip)).

This includes:

V Review the early pant design, verify its relevance with the

working standards (IEEE, IEC) and raise required site queries.

V Attending the technical evaluation meeting of the packages

suppliers with the design firm.

V Attending the plant installation and construction works.

V Review the conformity of the plant design with the safety rules

and the related control measures and risk assessment to ensure

that all works are performed within safe conditions to

personnel, company assets and environment.

V Review installation of electrical equipment and raise required

punch lists.

V Reviewed the conformity of the electrical apparatus with

hazardous area classification.

V Attend and taking part in the first gas and start-up of the gas

plant by reviewing the commissioning checklists, clearing

category A items punch list clearing, livening up notice and

review interim and final handover.

V Attending the construction works of the simian/sienna platform

and jacket in petrojet yard in (El Meadeya) carried out by the

main contractor (TECHNIP)

V Attend and approve the Site Acceptance Test of the Electrical

systems ad issue the Livening Up Notice (LUN)

V Being a part of Rosetta plant integration with the new

facilities P2 and P3 and P4 and process tie-ins

V Attending and supervising the electrical activities

construction, start-up and operation of compression station P1A

using two 10 MW GE gas turbines driven 6 stage centrifugal

compressor

V Being a part of the de-bottlenecking project of scarab saffron

to achieve the highest design flow rates.

V Assess and modify, when required, the design philosophy and

equipments specification along the operations lifetime of the

plant electrical system. The engineering modifications are

raised via the Engineering Investigation reporting System (EIR).

V Completing the different project for upgrading and replacement

of major electrical equipments in ZIRKU Island (ZADCO) due to

obscelence, degradation and EOL.

ADDITIONAL QUALIFICATIONS AND ATTENDED COURSES

Being involved in the selection and installation of electrical

apparatus and equipments to be installed in hazardous area locations

i.e. explosion proof electrical equipments (equipments and protecting

systems intended for use in industrial facilities with explosive

atmosphere hazard EX) in classified areas (zones 0 and 1), as well as

judging its conformity with the area in which they are installed

according to relevant international standards and codes of practice.

Attended a 5 days duration course in the selection, maintenance,

failure analysis and condition monitoring of SKF type bearings,

including an additional day for practical practice in SKF workshop.

Attended 6 a days on site training course on the gas turbines theory

of operation, maintenance and troubleshooting held by (the Egyptian

Canadian company).

Attended a 5 days training course in the (Risk assessment) held by

Dr. Hany Raafat (HSE assistant director in Aston University).

Attended a training course in the Arab Academy of Science and

Technology in the following topics: Fire prevention and fighting

onboard offshore units.

Medical first aid.

Personal survival techniques on board offshore units.

Offshore helicopter safety.

Attended an onsite training course in the scarab saffron Subsea

control system (MCS) held by Kvaerner Oilfield Company.

Attended an onsite training course in the pipeline simulation system

(PSS) held by Fantoft process technologies.

Attended an onsite training course in the operation, maintenance and

troubleshooting of Typhoon gas turbines held by Alstom gas turbines.

Attended a training course in the lightning protection of

installations and structures.

Attended a 5 days course in the maintenance and troubleshooting of

PLCs.

Attended a 3 days training in the first aid in the Egyptian Red

Crescent center.

Attended a 3 days training course on the Behavioral based Safety

(BBS).

Attended a 3 days practical training course in the fire fighting

(Suez Petroleum Co.)

Attended a 5 days training course in the design and sizing of

industrial electrical equipment (Held by the northern Alberta

institute of technology)

Attended a 5 days training course in design and installation of

electrical equipment in hazardous areas.

Attended a 5 days training course in the maintenance management and

computerized maintenance management system (CMMS).

Attended a 4 days training course in incident investigation held by

Randy smith Training.

Attended a 2 days training course for the service and repair of EX

motors and generators held in ABB Egypt Premises.

Attended 5 days training course in the industrial fire and gas system

Attended an In-house training in the Safety Management for line

supervisors (Held by DUPONT company)

Attended a 5 days training course in the preventive, predictive and

proactive maintenance and project management basics on Oil & Gas

Training Center.

Attended a 2 days Training course in the technical Report Writing in

IMI Training solution center.

Attended a 3 days training course in the maintenance and

troubleshooting of the Un-interruptible Power Supplies (UPS) held by

MGE UPS.

Attended a 2 days' workshop in the Time Management (FOCUS) held by

LTC Egypt (Franklin Covey)

The Above mentioned courses certificates and relevant document are

available upon your request

MAXIMO 6 Training course (In-house in ZIRKU Island, Abu Dhabi)

Bosiet offshore training (UAE/Abu Dhabi).

Dynamic operational risk assessment and incident command system

(UAE/Abu Dhabi)

PERSONAL INFORMATION

NAME: Tamer Ahmed Mahmoud El Shazly.

ADDRESS: Behind 75 El Geish Way, Sporting, Alexandria, EGYPT.

E-MAIL: **********@*****.***

PHONE NUMBERS:

EGYPT: + (20-114-*******

Work (UAE): +971-**-*******

Home (Egypt): +20 3 5776234.

MARITIAL STATUS: Married with 2 children.

HOBBIES: Reading, Travelling & Sports

[pic]

Tamer A. El Shazly

BEHIND 75 EL GEISH WAY - SPORTING ALEXANDRIA - EGYPT

PHONE +971-**-******* / +20-114-*******

EMAIL **********@*****.***



Contact this candidate