CURRICULUM VITAE
PERSONNEL DATA:
SURNAME:
OKAFOR
OTHER NAMES: CHIDI
CHRISTOPHER
DATE OF BIRTH: 16th
OCTOBER 1969
SEX:
MALE
PLACE OF BIRTH: NRI
TOWN / LOCAL GOVT. AREA: NRI IN ANAOCHA L.G.A
STATE OF ORIGIN: ANAMBRA
STATE
MARITAL STATUS MARRIED
RELIGION:
CHRISTIAN
NATIONALITY: NIGERIAN
RESIDENTIAL ADDRESS: NO. 50 WAWUNA
STREET
RUMUIGBO, PORTHARCOURT
PHONE NUMBER: 080********
E - MAIL
************@*****.***
EDUCATIONAL BACK GROUND WITH DATES:
RIVERS STATE UNIVERSITY OF SCIENCE & TECHNOLOGY: 1983 - 1986
POLYTECHINIC CALABAR
1987 - 1989
FEDERAL UNIVERSITY OF TECHNOLOGY OWERRI: 1999 - 2000
RIVERS STATE UNIVERSITY OF SCIENCE & TECHNOLOGY: 2004
CERTIFICATES OBTAINED WITH DATES:
MASTER OF TECHNOLOGY IN MECHANICAL ENGINEERING: 2008
(OPTION PRODUCTION ENGINEERING)
POST GRADUATE DIPLOMA IN INDUSTRIAL INSTRUMENTATION 2004
HIGER NATIONAL DIPLOMA IN MECHANICAL ENGINEERING
(OPTIO PRODUCTION ENGINEERING).
1989
UNIVERSITY DIPLOMA IN MECHANICAL ENGINEERING 1986
(OPTION PRODUCTION ENGINEERING)
TRAININGS ATTENDED WITH CERTIFICATIONS OBTAINED:
. A COOPERATE MEMBER OF NIGERIA SOCEITY OF ENGINEERS. MEMBERSHIP NO.
21825
. A COOPERATE MEMBER OF INSTITUTE OF MECHANICAL ENGINEERS OF NIGERIA.
MEMBERSHIP NO. 000534.
. A COOPERATE MEMBER OF (COREN) COUNCIL REGULATING ENGINEERING IN
NIGERIA NO. R 20,760.
. CSWIP 3.0, (TWI TRAINED) REGISTRATION NUMBER 3108202 ENGLAND.
. BASIC CERTIFICATE OF COMPETENCE IN QUALITY CONTROL OF WELDS (TWI
TRAINED) CERTIFICATE NUMBER 95 / QC / 0009.
. METALLURGICAL FAILURE ANALYSIS (TWI TRAINED) CERTIFICATE NUMBER 96 /
ATC 40 / 041.
. VISUAL INSPECTION OF WELDS (TWI TRAINED) CERTIFICATE NUMBER 95 / D73
/ 094.
. INTERPRETATION OF RADIOGRAPHS (TWI TRAINED) CERTIFICATE NUMBER 00 /
RI / N056.
. QUALITY MANAGEMENT SYSTEM (ISO 9000) CERTIFICATION.
. HSE COMPETENCE DEVELOPMENT COURES LEVEL 3 CERTIFICATION.
. CERTIFICATE ON SCAFFOLD INSPECTION.
. INDUSTRIAL FIRST AID TRAINING WORKSHOP.
. TRADE TEST GRADE 2 & 3 ON WELDING AND FABRICATION. CERTIFICATE NO. PH
/ 12 / 07588.
WORKING EXPERIENCE:
1989 TO 1990:
TRAINED AS A PRODUCTION SUPERVISOR IN ASHLAND OIL COMPANY. CARRIED OUT
ROUNTINE WELL SURVEYS, INJECTION OF CHEMICALS TO THE WELLS / FLOW STATION
MANIFOLD HEADERS, BALANCING OF PRODUCTION FIGURES WITH HOURLY PRODUCTION
FIGURES OBTAINED. CARRIED OUT METER PROVING, CALIBRATION OF METERS ON
MONTHLY BASIS, SERVICING OF FLOW METERS, PNEUAMATIC PUMPS.
1991 TO 1992
GOT EMPLOYED BY: SGS (NIGERIA) LTD.SECONDED TO IZOMBE FLOW STATION: WORKING
AS PRODUCTION SUPERVISOR. CARRIED OUT ROUNTINE WELL SURVEY OF INDIVIDUAL
WELLS. CHECK WELL HEAD PRESSURE, OBSERVED THE WELL THAT DROP IN PRESSURE,
CARRIED OUT PRESSURE TESTING TO DETERMINE WHETHER THE WELL COULD BE
RECOMMENCED FOR SWABBING TO CUT WAX.
1992 TO 1994:
CARRIED OUT HOURLY READING OF PRODUCTION FIGURE IN THE FLOW STATION. USED
THE FIGURES OBTAINED TO CALULATE THE VOLUME OF OIL. WATER AND GAS PRODUCED
USING ALREADY PRODUCTION CONSTANTS IN THE OFFICE. OBTAINED HOURLY SAMPLE
FOR BALANCING OF BSW OF HOURLY PRODUCTION.
1994 TO1995:
CARRIED OUT PROVING OF METERS ON MONTHLY BASIS TO DETERMINE NEW CONSTANTS
FOR BALANCING OF PRODUCTION FIGURES FOR THE MONTH. ENSURE THAT THE WORK IS
DONE SAFELY BASED ON JSA.
1995 TO 1996:
CARRIED OUT SERVICING OF PNENAMATIC PUMPS FOR INJECTION OF CHEMICAL TO THE
WELL HEADS AND FLOW STATION MANIFOLD HEADERS TO ENSURE PROPER SEPARATION IS
TAKING PLACE.
1996 TO 1998:
CARRIED OUT GAS RE - INJECTION TO WELLS THAT CAN NOT FLOW BY ITSELF AND
THIS ASSIST TO INCREASE PRODUCTION AND ALSO LOOK AT INDIVIDUAL WELLS RECORD
AND KNOW THE ONES THAT CAN BE FLOWN ON OPEN HOLE AND THE WELLS MAKING MUCH
WATER, WE REDUCE THE SIZE OF CHOKE TO ENABLE THE WELLS TO BUILD UP CRUDE.
1998 TO 2000:
CARRIED OUT SHUT DOWN FOR MODIFICATION OF LEAKING WELL HEAD HOOK UP RISER.
SUCCESSFULLY COMPLETED THE WORK AND RETURNED THE WELL TO PRODUCTION
ACTIVITES. ENSURE THAT WORK WAS COMPLETED SAFELY BASED ON JSA.
2000 TO 2002:
CARRIED OUT MONTHLY PIG LAUNCHING OF THE BULK LINE TO CLEAN UP THE LINE
FROM WAX BLOCKAGE. RECOVERS THE PIG AT THE SAVER PIT AND CLEAN UP THE SAVER
PIT TOO.
2002 TO 2009:
CARRIED OUT ROUTINE FLOW STATION CHECKS TO ENURE THAT THE SYSTEM IS RUNNING
OUT FINE. CHECK THE LEVEL OF CHEMICAL RE - INJECTION.
2010 TO DATE:
WORKING WITH ZB JOINT VENTURE LIMITED AS A SENIOR CONSTRUCTION ENGINEER FOR
CONSTRUCTION OF 45.6 KM 42''OML 58 GAS PIPE LINE FROM OBITE GAS PLANT TO
RUMUJI NODE. CARRIED OUT PRE - CONSTRUCTION SURVEY ACTIVITIES WITH SURVEY
CREW. STUDIED THE PIPE LINE ROUTE. IDENTIFIED AREA THAT REQUIRED SPECIAL
CONSTRUCTION TECHNIQUES, BORROW PITS, ROAD CROSSINGS, SEASONAL SWAMP AREAS
AND RIVER CROSSING. MONITORED 42'' 19.1MM LINE PIPE FOR DRY SECTION OF THE
PIPE LINE WORK ARRIVAL TO THE CONSTRUCTION SITE CHECKED THE PIPE CONDITIONS
AND 25.4MM PIPE LINE FOR SEASONAL SWAMP AREA SENT FOR CONCRETE COATING.
MOINTORED THE CONDITION. CARRIED OUT PROCEDURE QUALIFICATIONS FOR THE TAKE
OFF THE PIPE LINE CONSTRUCTION. CARRIED OUT RIGHT OF WAY RE - OPENING /
BUSH CLEARING WHICH IS COMPLETED TODATE, STRINGING OF LINE PIPES IS ONGOING
AND IS OVER 90% COMPLETED TO DATE WHILE WELDING OF LINE PIPES IS ALSO IN
PROGRESS AND IS ABOUT 60% COMPLETED TO DATE.WE HAVE VERY GOOD WORK
PROCEDURES DOCUMENTATIONS, OUR HSE RECORDS IS VERY GOOD AND AS A COREN
MECHANICAL ENGINEER, I AM ON TOP OF THE JOB SUPERVISING.
REFEREES:
. ENGR. A. O. AKINDELE (SPDC, BTIP BONNY TERMINAL).
. CHIEF ENGR. J. OKORO (SPDC, BTIP BONNY TERMINAL).
HOBBIES:
. SWIMMING
. READING