Post Job Free
Sign in

Project Manager

Location:
Manila, NCR, Philippines
Posted:
August 11, 2013

Contact this candidate

Resume:

JAIME BARRION HERNANDEZ

San Rafael, Montalban, Rizal, Philippines

Res. Number: 022131992 (Phils.)

Mobile Number: +639**-******* (Phils.)

Email Address: ***************@*****.***

Position Applied For: CONSTRUCTION MANAGER, PROJECT MANAGER

Expertise: Knowledgeable of Integrated Project Delivery(IPD), BIM as a

Tool, Project Management, Consultancy, Vertical Construction such as

buildings, hospitals, warehouses, Rail Works, Horizontal Construction

such as Roads, Bridges and Pipelines, Fit out works, Others.

Project Management Professional (PMP) graduate. Well exposed in project

consultancy, management and implementation, contract administration, high

level interfacing(coordination), manpower supervision, quantity survey for

bidding and actual construction, project monitoring and scheduling, office

procedures and communications, seeking a senior management position to

augment the industry's management work force and contribute my expertise

for the comfort and development of mankind.

Mission Statement: To lead and complete any construction projects within

the budget and schedule maximizing profit with the highest level of safety,

quality, hard work, and creativity for the distinct and well built

creations of mankind.

Summary of Professional Experiences:

Date Position Name of Project Company

March 11, 2013 - Project Director Manila Bay Resorts Duotal / Hilmarc's

Present 7 Star Hotel - Construction Corp.

7,535.5 sq.m.

STP - 5,362.5 sq.m

Beach Club - 12,851.3

sq.m.

Podium/Casino -

38,209.1 sq.m.

Tunnel - 19,974.1

sq.m.

T O T A L - 83,511.4

sq.m.

October 6, 2011 40 Storey Building Megawide Construction

- March 10, 2013 Project Manager Grass Residence Tower Corporation

2 Project

December 6, 2010 Project Manager Three(3) Tower, 34 BF Construction

- October 2, Storey Manhattan

2011 Parkview

March 2010 - Consultant/ Dhaka - Chittagong Canarail Consultants,

July 2010 Facility Eng'r. Railway Development Inc.

Project

Jan. 2008 - Feb. Site Manager Dubai Metro Project Obayashi Corp., JTMJV

2010 (Building) (Underground and

Overground Stations)

July 2007 - Jan. Senior Project St. Lukes Medical MDC - First Balfour,

2008 Supdt. Center (Hospital) JV.

July 1999 - May Op erations Manager Difft. Infrastracture JB Hernandez Const.

2007 Project

Sept.1996 Project Engineer Soya Oil Refinery and Titan Ikeda

-June1999 Meal Plant Construction and Dev.

Corp.

Jan. 1994 - Aug. Operations Manager Difft. Infrastracture COMOCO, Inc. (Const.

1996 Project Div.)

Aug. 1991 - Oct Field Engineer Oil Gathering Center, BECHTEL / EEI, Kuwait

1993 Oil Refinery,

Warehouses

March 1988 - Project Engr. Medical Warehouse Clark Air Base, US

Aug. 1991 Airforce Proj.

Details of Professional Experiences:

March 11, 2013 - Present

PROJECT DIRECTOR

DUOTAL / HILMARC'S CONSTRUCTION CORP.

Name of Project: Manila Bay Resorts (Total of 83,932.5 sq.m of 7 Star

Hotel, Beach Club, Podium/Casino,Tunnel and STP)

Paranaque City, Philippiness

Duties and Responsibilities:

Adopting Integrated Project Delivery(IPD) using BIM as a tool:

. Plans, directs, and coordinates activities of designated project to

ensure that goals or objectives of project are accomplished within

prescribed time frame and funding parameters.

. Reviews project proposal or plan to determine time frame, funding

limitations, procedures for accomplishing project, staffing

requirements, and allotment of available resources to various phases

of project.

. Establishes work plan and staffing for each phase of project, and

arranges for recruitment or assignment of project personnel.

. Confers with project staff to outline work plan and to assign duties,

responsibilities, and scope of authority.

. Directs and coordinates activities of project personnel to ensure

project progresses on schedule and within prescribed budget.

. Reviews status reports prepared by project personnel and modifies

schedules or plans as required. Prepares project reports for

management, client, or others.

. Confers with project personnel to provide technical advice and to

resolve problems.

. Oversee budget and ensure financial accountability.

. Supervise program delivery, assess client needs.

. Recognize and solve potential problems and evaluate project/program

effectiveness.

. Established operating procedures for project/program. Ensure

procedures meet program goals.

. Provide program content expertise, which may include delivering in-

service training and direct programming.

October 6, 2011 - March 10, 2013

PROJECT MANAGER

MEGAWIDE CONSTRUCTION CORPORATION

Name of Project: Grass Residences,40 Storey High Rise Building

Quezon City, Philippines

Duties and Responsibilities:

. Over all in charge for construction and project management.

. Manage the construction site activities that will deliver the

project in accordance with the agreed targets on safety, quality,

cost and schedule, throughout project completion.

. Independently plan, execute, and finalize projects according to

strict deadlines, high quality standards and within budget.

. Coordinate work with client and sub-contractors to ensure

compatibility of work throughout the design and on site executions.

. Proactively manage changes in project scope, identify potential

crises and devise contingency plans.

. Acquire resources and coordinate efforts of team members, sub-

contractors, and/or consultants in order to deliver projects

according to plan.

. Review all drawings and methodologies before work execution, modify

and make adjustments if necessary.

. Initiate corrective action to maintain construction in progress.

. Organize project cost and master schedule.

. Closely monitor the project schedule and ensure that work

progress is in par with schedule.

. Define project milestones and ensure timely deliverables.

. Conduct inspection work on site and ensure the performance of the

work is in strict compliance with the plans and specifications.

. Responsible for budgeting, planning, worker management, recruitment

and training.

. Introduce and implement new policies to increase work

efficiencies.

January 10, 2011 - October 2, 2011

PROJECT MANAGER

BF CONSTRUCTION

Name of Project: Three Tower, 34 Storey, Manhattan Parkview

Araneta Center, Cubao, Quezon City, Philippines

Duties and Responsibilities:

. Overall responsibile for the successful planning, execution,

monitoring, control,closure of a project.

. In-charge in the development of the project plan.

. Manages the stake holders interest in the project.

. Manages the project team.

. In-charge in the management of the project risks.

. Responsible in managing the project schedule.

. Responsible in managing the project budget.

. Manages the project conflicts.

. Directly reporting to the Area Manager.

. Conduct inspection and review of the project on a regular basis.

. Conduct presentation to the owner and to all stake holders.

. Directly responsible for the overall interfacing of all trades and

disciplines involve in the project.

March 15, 2010 -July 2010

CONSULTANT/FACILITY ENGINEER

CANARAIL CONSULTANTS, INC.

Name of Project: Dhaka - Chittagong Railway Development Project

Dhaka, Bangladesh

Duties and Responsibilities:

. Survey and investigation for water supply and sewerage system and

their capacities at the existing stations and facilities in the

station buildings.

. Detailed design of water supply and distribution system, sewerage

system and other passenger facilities in the station building to be

built and renovated.

. Preparation and arrangement of drawings for facilities.

. Preparation of Construction Method and Sequence for station

Facilities.

. Preparation of Bill of Quantities for facility works.

. Preparation of Technical Specification for facility works.

. Construction Supervision for facility works.

. Commissioning process for works completed.

Jan. 12, 2008 - Feb. 25, 2010

SITE MANAGER (Building Department, Overground/Underground Stn.)

OBAYASHI Corporation - Dubai, UAE

Name of Project: Dubai Rapid Link (DURL)/Dubai Metro Project

Dubai, UAE

Duties and Responsibilities (Overground and Underground Stations):

. Overall site management, supervision and coordination.

. Project/Site programming and scheduling.

. Prepare and submit progress report.

. Supervise 2 Chief Engineer, 3 Site Engineers, 1 Site Coordinator 1

CADD Operator, 2 Surveyors, 1 Admin Officer and 3 Supervisors.

. Develop schedules and program of works, making sure works are in

schedule.

. Review design plans, working drawings and specifications; make

recommendations and suggestions for possible modifications to

improve efficiency and productions.

. Conduct high level work scope coordination for consolidation of

manpower, materials and equipment and distribution of work load.

. Interface with the owner, Systra Parsons, Atkins and sub-

contractors.

July 2007 - January 11, 2008

SENIOR PROJECT SUPERINTENDENT

MDC-First Balfour Joint Venture

Name of Project: 6B Pesos St. Lukes Medical Center Project, Global City,

Taguig, Philippines

Duties and Responsibilities:

. Supervise 2 Site Supervisors, 2 Re-bar Engineer, 2 Form works

Engineer, 2 Concrete Engineers and 2 Technical Support Engrs.

. Supervise about two hundred(200) numbers of workers.

. Interface with the Sub-contractors regarding the schedule of work

and production.

. Liason to the consultant and the General Contractor.

. Review design plans, working drawings and specifications; make

recommendations and suggestions for possible modifi cations to

improve efficiency and productions.

. Conduct project inspection and monitor progress of works.

. Supervise/Monitor the actual construction making sure the highest

engineering standard and safety are implemented.

. Conduct high level coordination with the clients.

July 1999 - May 2007

OPERATIONS MANAGER

JB Hernandez Construction/Trading

Projects Supervise and Completed:

. Construction of 4 kilometers 6 meters wide concrete road connecting

San Rafael to Wawa Dam located in Mont., Rizal, Phil.

. Installation/Construction of 3 km. of 100mm Concrete pipe drainage

along M.H. del Pilar Road between Montalban and San Mateo, Rizal.

. Construction/Erection of three(3) units of Health Care Centers.

Duties and Responsibilities

. Directly responsible in the negotiation and development of

contracts/projects.

. Supervise/Prepare Bill of Materials, Program of Works and

manpower/equipment scheduling. Check/Supervise in the ordering of

materials, tools and equipments.

. Review working drawings and specifications, make recommen dations

for more efficient and cost saving methods of construc tion making

sure the highest engineering standard and safety are implemented.

. Conduct high level coordination with clients.

September 1996 - June 1999

PROJECT ENGINEER

Titan Ikeda Construction and Development Corporation

Projects Supervise and Completed:

. Construction of 9 hectares Bataan Soya Oil Refinery and Soya meal

plant, an industrial complex.

. Construction of Pampanga-Bataan National Diversion Roads and

Bridges.

. Construction of Yow Meng Plant at Subic Industrial Park.

Duties and Responsibilities

. Prepare Daily to Monthly accomplishment reports for billing

purposes.

. In-charge of the implementation of the projects.

. Coordinate with the sub-contractors and site staffs regarding

scope/schedule of works.

. Prepare Rebar and formwork cutting lists schedules.

. Prepare bill of materials for procurement.

. Prepare documents for change orders and variations.

. Ensure that the highest standard of safety is meets at the

construction site.

January 1994 - August 1996

OPERATIONS MANAGER

COMOCO, INC. (Construction Division)

Projects Supervise and Completed:

. Construction of Sta Rosa, Laguna to South Express way 6 meter

concrete road diversion with 6 meter concrete bridge.

. Construction of 12 meters concrete bridge connecting Muntinlupa

city to San Pedro, Laguna.

. Installation of water proofing system at Panasonic Plant at Laguna

Tehno Park.

Duties and Responsibilities:

. Directly responsible in the overall implementation of the project.

. Supervise site engineers and office engineers, gather reports and

prepare progress reports.

. Conduct high level work scope coordination and meeting for

consolidation of manpower, materials, equipment, and distribution

of work load.

. Ensure implementation of company's engineering standard,

procedures, guidelines and general instructions.

. Review design plans, working drawings and specifications, make

recommendations for possible modifications to improve efficiency

and productions.

. Monitor and review cost estimates, purchasing of materials and

renting of equipments.

August 1991 - October 1993

FIELD ENGINEER

BECHTEL-EEI KUWAIT

Duties and Responsibilities:

Al-Awda Project

. Assigned in the Fire Fighting Group; responsible in supervising

the different nationalities supporting the fire fighters.

. Supervise in the construction of workshop and warehouses.

. Lead, convince and motivate the workers during the hard days of the

project.

Al-Tameer Project (December 1991-May 1992)

. Assigned in the Production Support (Flow Line) group; responsible

in raising work orders, put into system and issue for construction.

. Organize and secure excavation and hot or cold permit.

. In-charge of coordination between Kuwait Oil Company (KOC) and

flow line sub contractors.

May 1992 - December 1993

. Was transferred to Drilling Support; responsible in making site pre

survey to all new drilling locations and work over loations to

determine the rig assignment and identify underground service

conflicts.

. Organize survey of drill pads, rig roads, access roads and burn

pits.

. Monitor the quality of construction of drill pads, access roads and

burn pits of 13 rigs as to configuration, elevations, orientations,

compaction; making sure it is ready to accept the rig.

. Interface with the Design Engineering, Earthworks Dept., Sta. Fe,

KOC and sub contractors.

. Sorted out conflicts on locations, i.e, flowlines, gas/condensate

lines, water lines, power lines and others. Arrange and

coordinates to respective departments.

March 1988 - August 1991

PROJECT ENGINEER (US AIRFORCE PROJECT, CLARK AIR FIELD)

R2 BUILDERS

Project Supervised and Completed:

. Construction of 2000 sq. meters Medical Warehouse Faclility.

. Construcition of 6 kilometers concrete base perimeter road and 2

kilometers base perimeter fence.

. Construction of sadded swales.

Duties and Responsibilities:

. Supervise and check the office engineers in preparation of the Bill

of Materials for bidding and actual construction.

. Responsible in the supervision of field engrs. of each discipline

and overall implementation of the project.

. Represents the company in all United States Airforce Projects and

was authorized to bind the company.

. Supervise and check in the ordering of indented materials.

. Prepare the progress schedule, Bar chart and others.

Other Educational Credentials

. Project Management Professional (PMP)

. Construction Project Management

. Primavera 6 (P6) - Basic

. M.S. Project (Construction Planning and Scheduling)

. AUTO CADD

. MS Word and Excel

. Office Outlook

. Reserve Officers Training Course (ROTC), Class Valedictorian

References:

MR. NOEL V. YU (Philippines) Mobile No. +639*********,

+639*********

MR. SATOSHI UMEYAMA (Dubai) Mobile No. +971********* (Dubai, UAE)

Mr. Ian Nibloe (Dhaka) PM Mobile No

+88-018******** (Dhaka, Bangladesh)

Engr. Vener A. Teofe (Philippines) Mobile No. 090*-*******

JAIME B. HERNANDEZ

Mobile No. 092*-*******



Contact this candidate