Post Job Free
Sign in

Engineer Project

Location:
Chennai, TN, 600044, India
Salary:
Rs.15.00 - Rs.18.00 Lakh PA
Posted:
August 04, 2013

Contact this candidate

Resume:

K RAMESH

Mobile: 91-944**-*****

Email: ***************@*****.**.**

Job Objective:

Seeking senior level assignments in project Execution & Coordination,

Estimation & Costing, Billing Quantity Surveying, Erection and

Commissioning, Resource management, operation and maintenance with a high

growth oriented organization of repute.

Professional Synopsis:

> Over 23 yrs of Cross cultural Experience in the areas of Planning and

Execution of Projects, QA/QC and Formwork Co-ordination, Quantity

surveying and billing, Resource Management and System implementation.

> A Strategic Planner with multi-discipline expatriation in execution of

high raised, heavy and critical concrete structures for Paper Mill,

Steel & Power Plant, Housing Apartments, Irrigation and Water supply

projects,canal projects, and various industrial projects.

> Experience of 23 Yrs with clients like DuPont, ITC, TATA, Sterilities,

M.N.Dastur & Co., Sri Sathya Sai Central Trust in India, Coromandel

International,NTPL & TOYO Engineering..

> Expertise in fulfilling client's requirement and working on their

suggestion and feedback with proven track records in Safety and

Quality.

> A keen planner and strategist with skills in troubleshooting, Team

building capability, excellent interpersonal relationship, proven

abilities in planning & managing resources and Public Relations.

Educational Qualification:

> D C E State Board of Technical Education -

Tamil Nadu. 1988

> D C Tech Annamalai University, Chidambaram

1989

> B.E., Civil ANNA UNIVERSITY, Guindy, Chennai.

2004

> Primavera P6 CADD Centre, Chennai

2011

Organization Experience:

> Tecton Engg. & Constn. (I) Pvt. Ltd., Sr.Manager

Sep'10 to Oct'11

> Hindustan Dorr-Oliver Ltd., Sr.Manager

Apr'09 to Jul'10

> Zuari Cement Limited, Italcementi Group Sr.Manager

Aug.08 to Mar' 09

> Larsen & Toubro Ltd. ECC Division Asst.Const.Manager

Sep' 95 to Aug' 08

> UNITECH Limited Jr. Constn.

Engineer May' 94 to Aug' 95

> Overseas Water Proofing Corporation. Site Engineer.

Apr' 93 to May' 94.

> Private Concerns & Building Work Site Engineer.

Aug'88 to Apr' 93.

PROFESSIONAL EXPERIENCE: 23 years in the field of Civil Engineering

> Presently working with M/s. Doshion Veolia Water Solutions Pvt.Ltd.,

Ahmadabad, as a AGM - Projects for Construction of RWTP, UF, RO Plant

at OMPL, Mangalore.

Tecton Engg & Constn. (I) Pvt. Ltd., - Chennai.

Designation: Senior Manager- Project Coordination Period: September,

2010 - October, 2011

Job Responsibilities:

> Planning and Monitoring of Monthly, Weekly and Daily Program in line

with Master Schedule to complete the task in time.

> Finalization of Required Resources for the project, Optimum

utilization of assigned Resources and demobilizing the same at right

time.

> Allocation of Sub - ordinates, Frontline supervisor and skilled

workmen in Right location according to their experience and caliber to

achieve maximum productivity.

> Overall Planning, Scheduling and management of civil projects,

ensuring completion of assignments within time.

> Monitoring project with respect to cost, resource deployment, time

overruns, Quality compliance and manpower planning to ensure timely

execution of projects.

> Expertise in Detailed Estimation and finalizing of quantities for EPC

projects with relevant to available drawings, specifications and

contract.

> Experienced in working-out quantities, measurement certification for

billing from clients Rate analysis, certification of sub contractor

measurements etc according to Project.

Hindustan Dorr-Oliver Limited - Vizag

Project: Construction of Horizontal Belt Filter Building for Coromandel

International Ltd., Vizag.

Designation: Senior Manager- Projects Period:

April, 2009 - June, 2010

Job Responsibilities:

Project Execution & Coordination for over all civil activities with Electro-

mechanical & Instrumentation works, Scope of works Planning & Monitoring

the daily activity and complete the project.

. Approval & Finalization of Vendor & Specialized agencies.

. Preparation of Detailed Estimation and finalizing the BOQ. Estimating

and Costing, Rate analysis for each Item of works to finalization of

contracts and payment.

. Coordination with Internal departments and given civil front to

electromechanical work. Technical Assistance/guidance to contractor to

complete the work in scheduled time.

. Good rapport with Client's and completes the work & Payment in time.

. Re-bar & Structural detailing, Checking and Estimating the

quantity, Reconciliation of steel.

Zuari Cement Limited, Italcementi Group - Bangalore.

Project: Construction of New Burning Line II (5500 MTPA), Yerraguntala.

Designation: Senior Manager Period: Aug,

2008 - March, 2009

Job Responsibilities:

Project Execution & Coordination for over all civil activities with

Electro-mechanical & Instrumentation works, Scope of works Planning &

Monitoring daily activity.

. Planning and Monitoring of Monthly, Weekly and Daily Program in line

with Master Schedule to complete the task in time & Inspection of

Civil Structures as per approved drawing.

. Preparation of Detailed Estimation and finalizing the BOQ. Estimating

and Costing, Rate analysis for each Item of works to finalization of

contracts and payment.

. Continuous follow-up with vendor and Technical Assistance/guidance to

complete the work in scheduled time. Vendor bill checking and

reconciliation of materials structure wise.

. Re-bar & Structural detailing, Checking and Estimating the

quantity, Reconciliation of steel.

A LARSEN & TOUBRO LTD., ECC DIVISION - 13 YEARS EXPERIENCE

1. Project: L&T ECCD., - NSRDWS, Anantapur.

Designation: Asst. Construction Manager Period Aug

2007 - Aug 2008

Job Responsibilities:

. Site In charge for the Construction of Heavy duty pump house,

OHWST, UG Sump & OHSR over hill in various interior village

locations as per Client' requirement.

. Preparation of BOQ, Schedule of Quantities and Rate analysis

for finalization of Scope of work. Planning, Execution &

Monitoring of OHSR in Various Capacity of Tanks & Sumps, Heavy

Duty Pump House building work.

. Preparation of client bill & certification, according to that

Contractor bill payment

2. Project: L&T ECCD., - Alisagar Lift Irrigation

Project, Nizamabad.

Designation: Asst. Construction Manager Period:

May 2006 - July 2007

Job Responsibilities:

. Site In charge for Construction of Alisagar Lift Irrigation

Scheme - Stage III.

. Planning, Estimating, Procurement, Monitoring & Execution Heavy

Duty Pump House, Road Bridge & Railway Bridge, Canal excavation

& Lining, Pipe line Thrust Block, Air Valve Chamber construction

work.

. Railway Bridge (Pre-cast) was constructed by Box pushing method

without disturbing of the existing railway line & traffic.

. Preparation of client bill, certification & Technical Assistance

to contractor.

Preparation of BOQ, Schedule of Quantities and Rate

analysis

3. Project: L&T ECCD., - Construction of 22.5ML

Capacity MB Reservoir for HMWSSB.

Designation: Senior Engineer Period Jan 2005

- May 2006

Job Responsibilities:

. Preparation of scope of work & Schedule of quantity for Master

Balancing Reservoir for HMWSSB at Gungal, Hyderabad.

. Planning, Estimating, Procurement, Monitoring & Execution of

Reservoir.

. Reservoir Cover Slab 70 mtr. Dia & 6mtr High was casted with

Structural Steel Bracket system without vertical support &

staging.

. Preparation of client bill, certification & Technical

Assistance to contractor for the above shuttering system to

complete the work ahead the schedule.

. Preparation BBS of steel quantity and estimation.

4. Project: L&T ECCD., - Cogent. Power Plant for EID Parry

(I) Ltd, Pudukkottai.

Designation: Senior Engineer Period: May

2005 - Jan 2006 .

Job Responsibilities:

. Preparation of scope of work and construction of LT Panel, MCC

Room, and Raw water Tank cum Pump House & TG Building

construction work.

. Planning, Estimating, Execution & monitoring of all civil &

Structural work and preparation of bar bending schedule for the

above structure.

. Preparation of Clients & Subcontractor billings, Certification.

. Technical Assistance to contractor and complete the work in

time.

5. Project: L&T ECCD., - TATA Steel Project, Jamshedpur

Designation: Senior Engineer Period: March 2004 -

April 2005

Job Responsibilities:

. Construction of ECR Building 100m x 30m for New Rebar mill.

Planning, Estimating, Monitoring & Execution of ECR Building.

. Each Floor Slab was casted in a month by providing Structural

Steel Shuttering method without vertical support, Staging and

save the Cost & Time.

. Finalization of specialized agencies for various finishing item

of work, execution & supervision in time to and complete the

work in time.

. Construction of 33 KV Transformers - 2 Nos in the ECR Building.

. Preparation of structural steel & Rebar detailing, estimation

for the work

. Preparation of sub contractor & Client Billing and follow up the

payment.

6. Project: L&T ECCD., - CMWSSB Water Treatment Plant, Chennai

Designation: Senior Engineer Period: Jan

2003 to Feb 2004

Job Responsibilities:

. Preparation of scope of work for Kilpauk Water Treatment Plant,

Detailed Estimation for each building, clarifier, Chemical

House, Gravity sand filter building, Pump house. Preparation of

Bill of qualities, Finalization of Contract value.

. Preparation of cost estimation & client's bill certification.

Rebar detailing, Checking & bar bending schedule, Reconciliation

of Cement & Steel.

. Specialized agency finalization for chemical treatment and

waterproofing work.

7. Project: L&T ECCD., - Testing & commissioning of pipe line for

Chennai Metro Water.

Designation: Senior Engineer Period: June 1999 to

Dec 2002

Job Responsibilities:

. Doing Main condition survey for existing pipe line in area wise

and preparation of Estimate & finalization of Scope of work.

. Laying of New CI Pipe and replacing of old pipe.

Testing & commissioning

pipe line without any leakage.

. Client's bill certification and follow-up & Consumer

satisfaction.

. Good rapport with publics and complete the job successfully.

8. Project: L&T ECCD., - Construction of surge pond for Sterlite

project, Tutucorin.

Designation: Assistant Engineer Period: Dec1998 to May 1999

Job Responsibilities:

. Planning, Estimating, Surveying, Monitoring and Execution of

Surge Pond work.

. Preparation of subcontractors billing and reconciliation of

Cement & Steel.

. Preparation of Rebar detailing and bar bending schedule.

9. Project: L&T ECCD., - Bellary Steel & Alloys Ltd., Bellary

Designation: Assistant Engineer Period: August 1997

to Nov 1998

Job Responsibilities:

. Planning and Execution of Blast Furnace Foundation HRC

(2500 cum) concrete work done by manually.

. Preparing and Monitoring of Monthly, Weekly and Daily Program in

line with Master Schedule to complete the task in time.

. Finalization of Required Resources for the project, Optimum

utilization of assigned Resources and demobilizing the same at

right time.

. As a Planning/ Billing Engineer Preparation of Client's bill

for each building/Structure wise & getting certification from

consultant /Client. Sub-contractor bill preparation &

reconciliation of materials.

. Preparation of cost estimate and rate analysis, reconciliation

of Cement & Steel.

. Preparation of bar bending schedule, Structural steel detailing

and estimation for Steel Plant.

10. Project: L&T ECCD., - ITC Bhadrachalam Paper Ltd. Bhadrachalam

Designation: Jr. Engineer Period: Oct 1996 to

August 1997

Job Responsibilities:

. Surveying & Marking of Foundation Layout and

Construction of Bulk Tower,

Broke Tower, Final tower & Dump Tower of 20mt.dia &

30mtr Height.

. Construction of Tower by conventional doka method shuttering and

Mixing, placing of concrete by manually.

. Preparation of sub-contractor billing and reconciliation of

materials.

. Preparation of bar bending schedule and estimation.

11. Project: L&T ECCD., - Tapar DuPont Ltd. Gummudipoondi

Designation: Jr. Engineer Period: Sept 1995 to Oct 1996

Job Responsibilities:

. Re bar & structural Steel detailing, checking & preparation of

bar bending schedules as per drawing to entire project work and

reconciliation of Steel.

. Planning Execution & Monitoring of factory buildings, Cable

Trenches, Specialized Flooring work. Allocation of Excavators,

Roller, Trucks for site requirement.

. Supervision of Compound wall construction and grading of area

for sand Blast area.

B UNITECH LTD, Chennai.

Project: NOVA Projects & Indoor Stadium, Chennai

Designation: Jr. Construction Engineer Period: May

1994 to August 1995

Job responsibilities:

. As Planning Engineer preparation of detail Estimate, cost

estimation and finalize the BOQ. Preparation of client bill and

certification of payments.

. Preparing and Monitoring of Monthly, Weekly and Daily Program in

line with Master Schedule to complete the task in time.

. Rebar detailing, Estimation of steel & reconciliation of the

materials.

C OVERSEAS WATER PROOFING CORPORATION, New Delhi.

Project: Jindal corporate office, Delhi ITO Sub way, underground

car parking

Designation: Engineer Period:

April 1993 to May 1994

Job Responsibilities:

. Preparation of schedule and bill of quantities, updating of daily

progress report.

. Planning, Supervision, Monitoring & Execution of Water proofing

work like Terrace water proofing (BrickCoba) method, Box type

method for wall and Flooring .

. Preparation vendor & Client's Billing and certification.

D Private Builders & Building Works, Chennai.

I have worked as a Site Engineer for the Construction of Residential,

Commercial & Apartments Buildings including Surveying, Marking,

Supervising, & monitoring the daily activities.

Period : June 1988 to Nov 1989

& Feb 1990 to March 1993

Key Result Areas:

Project Execution:

> Finalization of construction Methodology with respect to contracts,

specifications, environment, within accepted cost limits and Ultimate

safety conscious to complete in time.

> Preparing and Monitoring of Monthly, Weekly and Daily Program in line

with Master Schedule to complete the task in time.

> Finalization of Required Resources for the project, Optimum

utilization of assigned Resources and demobilizing the same at right

time.

> Allocation of Sub - ordinates, Frontline supervisor and skilled

workmen in Right location according to their experience and caliber to

achieve maximum productivity.

Project Co-ordination:

> Overall Planning, Scheduling and management of civil projects,

ensuring completion of assignments within time.

> Monitoring project with respect to cost, resource deployment, time

overruns, Quality compliance and manpower planning to ensure timely

execution of projects.

Formwork Competency:

> Expertised in different type of formwork and shuttering system like

Doka, Acrow units and convention methods including mockups and

training to workman.

> Handled in finalizing methods of shuttering materials and manpower

required for the projects within the cost and approval from client.

Construction Equipment:

> Coordinated with Plant and Machinery Department for finalizing

required Man and Machineries for the project, Plant cost and

Maintenance Schedule to run the Plant within the Accepted cost.

> Worked with different types of Contract like Item Rate, EPC, Lumpsum

Package and Cost Plus with different clients.

> Spearheaded in finalizing Sub Contractor and vendors, Rate Analysis,

Negotiation and Placing of work order to the agencies.

Safety

> Co-Ordination with Safety Engineering Department in Implementing HSE

Policies at site level

> Maintaining a high level of safety and safe working plan and ensuring

all workmen are familiar with the employer safety guide confirm to

safe working practice at all time.

Quality

> Worked as Management Representative for implementing ISO- 9001 quality

Management system at site level.

> Implementing and finalizing PQP for the project, approving the client

and implementing the same at site.

Training Program Attended:

> Construction Management

> Supervisory Development Program

> User Awareness on construction equipment

Personal Details:

Father's Name : R. Krishnaiyan

Date of Birth : 15.04.1967

Sex : Male

Marital Status : Married

Nationality : Indian

Languages known : English, Hindi, Tamil, Telugu, Sourastra.

Communication Address : Plot No.2, Flat No.7 VARUN

TERRACE,

Venkateswara Cross Street,

Radha

Nagar,

Chrompet,

Chennai -

600 044.

Remuneration Package:

Present Salary : Rs.15.11 Lakh PA

Expected Salary: Negotiable

K. RAMESH



Contact this candidate