Akash Kumar Mob: +91-953******* / 943*******
Email: **************@*****.***
Career Headlines: Career Objective
Seeking assignments to work in a challenging
Mechanical Engineering with environment where I can get an opportunity to
distinction grade. learn and grow, both personally and
Practical knowledge of AUTOCAD professionally, while actively contributing to
AND CATIA the growth and development of the company.
Vocational training from C.P.P
NALCO. Academics
Vocational training from KTPP
Banjhediht DVC. Institution Name
Exceptional communication, Year
collaboration & team building % Marks
skills with proficiency at
grasping new technical concepts B.Tech. (Mechanical)
quickly and utilize the same in RGIT, koderma
a productive manner. 2013
DCA certified. 78.4%
Personal Data: 12th (SSC)
Barhi College, Barhi
DOB: 8th December 1992 2009
Sex: Male 74%
Marital Status: Single
Nationality : Indian 10th (HSC)
Languages : English, Hindi CCL High School, Ramgarh
2007
Traits: 71%
Vital team Player
Enthusiasm to work in varied Skill Set
environments Computer OS
Social and Ethical worker Windows XP, Vista, 7
Proactive
Quick leaner Favorite Subject
Power Plant
Hobbies:
Software
Internet Surfing, Listening MS Office (Word, Excel, Power point)
Music
Designing
Awards and Recognition: AUTOCAD, CATIA
Best academic award during 3rd
Year B.Tech Trainings Detail:-
Runner-up champion in badminton.
Organization :- NALCO CPP Duration:-
Best core committee member of 17th June 2011 to 16th July 2011
Technical event organizing team.
Brief Description: - NALCO CPP is a captive power
plant which produces electricity for its own
Permanent Address: uses. It has 10 units with capacity of 120 mega
watt each so total of 1200 mega watt. With help
Bishunpur Road, Jhumri Telaiya, of this electricity NALCO produces 99.9% pure
Koderma Jharkhand - 825409. Aluminium. The water for the Plant is drawn from
River Brahmani through a 7 km long double circuit
pipeline. The coal demand is met from a mine of
3.5 million tpa capacity opened up for Nalco at
Bharatpur in Talcher by Mahanadi Coalfields
Limited.
Roles and responsibilities:-
Analysis of electricity production process.
Study of Micro-processor based burner management
system for optimum thermal efficiency and
Computer controlled data acquisition system for
on-line monitoring
Overview of Automatic turbine run-up system
Got a chance to understand Specially designed
barrel type high pressure turbine
Study of Electrostatic precipitators with
advanced intelligent controllers
Organization :- DVC Duration:- 24th May
2012 to 20th June 2012
Brief Description: - Damodar Valley Corporation
is a thermal and hydro power generating public
organization of India. Entrusted with the
responsibilities of providing the vital input
power for industrial growth in the resource rich
Damodar Valley region, DVC has been practically
operating as a pioneer, using latest available
technologies to supply bulk power at reasonable
rates to the major industries. DVC has been
generating and transmitting power since 1953 and
has succeeded not only in meeting the needs of
consumers but has also helped to increase the
demand of power which itself is an index of
development.
Roles and responsibilities:-
Regular analysis of day-to-day power generation.
Assistance to power stations for maximization of
generation and availability with approach towards
zero forced outage under guidance of supervisor
engineer.
Study of Generation and overhaul scheduling
(Rolling Plan).
Collate and review O&M. budgets and cost
reduction initiatives.
Monitoring overhaul quality and other repair jobs
at outside works.
Project Summary
Project Name: The performance of heat pipe
Scope: A heat pipe is a device that can quickly transfer heat from one
point to another. They are often referred to as the "superconductors" of
heat as they possess an extra ordinary heat transfer capacity & rate with
almost no heat loss.
A heat pipe is a device that efficiently transports heat from its one end
to the other. It utilizes the latent heat of the vaporized working fluid
instead of the sensible heat. As a result, the effective thermal
conductivity may be several orders of magnitudes higher than that of the
good solid conductors.
Mainly we can say that the transfer of heat from one end to another is more
quickly than another pipe.
Responsibilities:
V Understanding functional and non-functional requirements.
V Analysis of requirement from different sources like google, Wikipedia
etc.
V Knowledge transition to team member.
Declaration: I hereby declare the above-furnished information is true
to the best of my knowledge.
Akash Kumar