Post Job Free
Sign in

Maintenance Electrical

Location:
Pune, MH, 411028, India
Salary:
27000 AED
Posted:
February 19, 2012

Contact this candidate

Resume:

Praveen Kumar Dubey

PERSONAL INFORMATION:

Date of Birth: 15th December, 1977

Mobile: +918*********(India)

Working As:- Lead Estimation Engineer-Airfield Lighting

Current Emp. Honeywell Automation India Ltd

Email:*******@*****.***

Interests: Handling Airfield Lightning inclusive Runway lighting projects and maintenance.

Passport: J3005721 Valid until 21ST October 2021.

Present Address: #Flat no.501,5th Floor Chandan Build. Kuber Sankul Gadital Hadaspar Pune India - 4110028.

Permanent Address: #B-114 DDA Pocket-2 Sector-7 Dwarka New Delhi India - 110075.

Languages: English, Hindi

Specialties

Skilled person with over Fourteen years experience in the Project Management, Designing, estimation, work execution, installation, testing, commissioning, operation and maintenance Airfield Lighting system and their control systems. In depth knowledge of VDGS (Visual Docking Guidance System), Solaris (Unix) Operating System based Control Monitoring Systems (CMS), PLC based control and monitoring system, Induction (Sensor) Loops, ISA2-DET Card, Phoenix Surge / Over Voltage Suppressor. Optical Fiber Cable Laying, OTDR Testing, Splicing and communication systems with OFC / TCP-IP (Ethernet).Design management, Safety Management System Information and Systems management Adapt at diagnosing and isolating malfunction in electrical control system using schematics, blue prints and appropriate test equipment.

AREAS OF EXPERTISE:

• Airfield Ground Lighting Designing, Estimation & Engineering.

• AGL Installation, Commissioning and Testing.

• Preparation of RFP, SOP, MOWP, NOTAM, BOQ, Estimates etc.

• ITC of Microprocessor Constant Current Regulator

• Basic Knowledge of Control Monitoring System and Single lamp control.

• Visual Docking Guidance System Installation, Testing & Commissioning.

• Maintenance of 400 Hz Ground Power supply Unit (GPU).

• LV Panels and Power Distribution

• Control Circuits of Runway Lighting

• 400 Hz Power Equipment(GPU)

• Microprocessor Constant Current Regulator(MCRs)

• Constant Current Regulator(CCRs)

• Maintenance of High masts (Flood Lights)

• Maintenance of Street Lighting

• Maintenance of Internal(Domestic) Lighting

• Internal Auditor for ISO 140001

• Worked with main key players of Airfield Lighting system, ADB, Safe-gate & Honeywell.

PROFESSIONAL QUALIFICATION/KNOWLEDGE:

• B. Tech in Electrical Engineering from J R N University Rajasthan India.

• Diploma In Electrical Engineering ,Government Polytechnic Moradabad Uttar Pradesh

(Board of Technical Education Lukhnow UP)

• Knowledge of Windows 7/XP/2000/NT/98, MS Dos , MS-WORD,MS-EXCEL,POWER POINT

ACADEMIC QUALIFICATION:

• Passed High School Examination (SSC) from state board of Uttar Pradesh India.

• Passed Intermediate examination from Intermediate board of Uttar Pradesh India.

TRAINING/Skills:

• Project Management Planning /PMI (11th to 15th Nov 2011)

• Training on Safe gate airfield lighting system at Sweden (11th April 11 to 15th April 11)

• Training on Honeywell airfield lighting system at Sweden (17th November 11 to 19th November 11)

• SAP Training ICT Department BIAL (26th Oct to 20th Nov 09)

• Basic Fire Fighting (29th September 2008 )Aircraft Rescue and Fire Fighting Department, BIAL, Bangalore India.

• 400 Hz Ground Power Unit(Axa)(20th April, 2008)AXA Power APS-Bangalore International Airport Bangalore India

• Philips High masts- Maintenance(February 2007)Siemens India Ltd Bangalore International Airport India

• Bajaj Street Lighting- Maintenance(February 2007) Siemens India Ltd Bangalore International Airport India

• Effective Spare Parts Management (17 to 19th December 2007) National Productivity Council, Chennai, Tamilnadu India.

• Airfield Lighting Control System-Maintenance ( 10&11th December 2007)ADB Training Centre at Bangalore International Airport- Bangalore India.

• ADB Microprocessor Constant Current Regulator-Installation Maintenance(10&11thDecember07)ADB Training Centre at Bangalore International Airport- Bangalore India.

• ADB Sequence Flasher Lighting System-Installation Maintenance(10&11thDecember07)ADB Training Centre at Bangalore International Airport- Bangalore India.

• Programme Logic Control(PLC)-Step7 Basic Programming& Maintenance(21 to 24th November07)

Vasundhra Automation and Engineering Services PVT Bangalore India.

• Aircraft Docking Guidance System -Safegate (January 2005) Ama Pvt Ltd, IGI Airport New Delhi-India.

EMPLOYMENT HISTORY:

Lead Estimation Engineer- AIRFIELD LIGHTNING

Honeywell Automation India Ltd

Corporate Office: 56&57 Industrial area Hadaspar Pune Maharashtra India .

Website: www.honeywell.com

Period: Nov 2010 to till Date

Main Duties and Responsibilities:

• Responsible to Engineering design and estimate Airfield Ground Lighting Systems based on the ICAO / FAA standards, Tender specifications, Bill of Quantity, reading customer drawings.

• Working within the project Operation team, and translate customer requirements, drawings and specifications to create the lowest achievable installation cost estimate.

• Record all assumptions, exclusions and specification deviations for inclusion within the proposal.

• To use approved standard Estimating processes and tools (HIET) to create estimates using standard Work Breakdown Structures for subsequent import directly into the (SAP) Field Financial tool.

• Assistance with the creating highly professional technical and commercial proposals suitable for presentation to the highest levels of management.

• Assisting the sales team in understanding and assessing customer’s requirements; Selecting the proper combination of hardware, software, equipment, materials and services that will deliver the highest value to the customer while supporting overall Honeywell business objectives.

• Support of Project Managers, when requested, in the calculation of costs and sell prices for project Change Orders.

• Understand the type of Project and identify appropriate scope of work from Tender.

• Design AGL system based on ICAO standards, considering all other aspects like drawings, specification, BOQ etc from customer. This includes selection of appropriate products with all accessories, sensor loops, Single lamp controls using ASD.

• Prepare Electrical drawings, Estimate Power consumption.

• Ensure to collect the subcontractor cost (Field I & C) basis electrical design.

• Design CMS Architecture based of specifications – co-ordinate with domain expert to seek advice on same. Estimate the cost for CMS effort

• Prepare estimation for designed system using Honeywell Estimation tools.

• To collect the Civil work cost from Civil Contractor basis scope of work in tender

• Participate in Technical Risk review along with technical team and in eCAP review along with Sales member.

• Prepare customer presentations and assist sales rep to present the offer by the customer if required.

ASSISTANT MANAGER- AIRFIELD ELECTRICAL

Bangalore International Airport

Corporate Office: Admin Block, Bangalore International Airport Devenhalli Bangalore India .

Website: www.bengaluruairport.com

Period: Jul 2007 to Oct 10

The assignment consists of the maintenance of PLC based control and monitoring system,Runway and associated Taxiways lights, LT panels feeding Radar and Navigational Aids systems, Apron Flood Lights, GPU 400Hz feeding supply to Aircraft.

RW 09 - 27 having the total length of 4000m and facilitated with CAT- 1 approaches at both the end. The runway is equipped with Runway Edge and End lights, PAPI, Approach, Threshold and Threshold wing bar lights, Sequence flashing Lighting System, Runway Guard lights, Distance remaining signs and Runway exit Guidance signs.

The Taxiways is equipped with Taxiway Edge Lights. The Taxiways are also equipped with taxiway (Mandatory / Information) guidance signs.

Main Duties and Responsibilities:

• Compliance of airfield electrical activities with ICAO, DGCA, national and international standards

• Design, preparation of BOQ, Estimation and Tendering of Airfield Lighting system.

• Availability and proper storage of all identified key spare parts

• Documentation and Reporting of maintenance activities

• Quality Assurance

• Complete and up-to-date infrastructure documentation (handbooks, procedures, etc.)

• Project Management: efficiently and professionally manage assigned projects

• Ensure compliance of electrical maintenance procedures with national and international rules and regulations for preventive maintenance

• Ensure adherence to all safety regulations of the electro-technical infrastructure, according to BIAL's safety concept

• Quality assurance: track adherence to agreed service levels by contractors

• initiate quality and continuous improvement initiatives

• Documentation & Reporting:

o maintain records of scheduled maintenance procedures

o maintain complete records and report all system and infrastructure failures

• Planning and execution the electrical preventive and corrective maintenance and requirements needed for the day to day work in the airfield area.

PROJECT ENGINEER

Ama Pvt Ltd

Head Office Canada Building 224,Dr D N Road,Mumbai-400001, India.

Branch Office-88, Gurudwara bangle sahib Marg ,Cannought Circus New Delhi, -110001, India.

Period: June 2000 to Jul 2007

Main Duties and Responsibilities:

• Planning and Execution of projects and maintenance work of Runway Lighting including Tendering, Purchasing of materials and billing to client also.

• Installation, Testing and Commissioning Rotating Beacon, Aviation obstruction Lights and wind cone.

• Installation, Testing and commissioning of precision approach path indicator and Visual approach lights.

• Installation, Testing and Commissioning of docking guidance systems (laser guided docking guidance system) including coordination with system administrator for calibration of docking guidance system for all type of aircraft.

• Installation, testing, commissioning, and modifying of taxiway and runway guidance sign boards.

• Installation, Testing, Commissioning and maintenance of airfield lighting Cat-III system, electrical substation, Visual Docking Guidance System and constant current regulators.

• Carried out breakdown repair of airfield lighting systems and electrical equipments as well as supervising a team of Site engineers, electricians and maintenance assistants in completing the task.

• Interacting with Airport Authority of India team to Execution of projects and maintenance work of Runway Lighting including Tendering, Purchasing of materials and billing

• Co-ordinate with sub contractors in installation, testing, alignment and commissioning of airfield lighting systems and support equipments.

• Ensures safety of self and assistants in the airfield.

• Record the assigned preventive maintenance sheets, history cards and enter in the data logger.

INSTRUCTOR

Ishwar Das Technical Institute

Head office -Bahjoi (Moradabad) Uttar Pradesh

Period: August 1998 to May 2000

Main Duties and Responsibilities:

• Educating Theory & Practical of Electrical subjects including Mathematics and Applied Science.

• Reporting to Institute Principal.

• Maintaining the discipline.

• To prepare notes, this can help to improve the knowledge of student.

• To carry out the annual exam in discipline manner.

APPRENTICE JUNIOR ENGINEER

Uttar Pradesh State Electricity Board

Head Office Shakti Bhawan-Lukhnow-UP, India.

Branch Office-Electrical distribution Centre Chandausi UP .

Period: July 1997 to July 1998

Main Duties and Responsibilities:

• Carries out routine checks of 33 KVA, electrical substation, 37.5 MWA Transformer, Oil Circuit Breaker.

• Carries out breakdown repair and schedule preventive maintenance of 11KV/440 Volt distribution system and their electrical equipments as well as supervising a team of electrician and/or maintenance assistants in completing the task.

• Reporting to Sub divisional officer of UP State Electricity Board.

HANDLED PRESTIGIOUS PROJECTS

In year 2000-2001

• Completed the project work of CAT III Lighting system at IGI Airport New Delhi i.e. installation of inset fittings, CCR’s, Sign boards and Relay panel, which was executed the first time in India

In year 2001-2003

• Completed the maintenance work of CAT III Lighting system at IGI Airport New Delhi

• Completed the time bound Dismantling and Reinstallation project of CAT II lighting system at C.S.I. Airport Mumbai.

• Completed the project of CAT III lighting system at Sahara Airport Lonawala Maharastra

In year 2003-2005

• Completed the project of “ C ” Taxi, “ R” Taxi & Bay 41 to 42 and“ R2 & R4” Taxi at IGI Airport New Delhi

• Completed the installation of precision approach path indicator at various Air force stations i.e. Srinagar Air force station, Leh Air force station, Bhatinda Air force station etc.

• Completed the installation of Visual Docking Guidance System(VDGS) at IGI Airport New Delhi.

• Completed the installation work of frangible mast in approach Lighting System at IGI Airport New Delhi, which was executed the first time in India

• Completed the installation of Rotating Beacon at Cuttuk Orrissa.

In year 2005-2007 as Project Incharge

• Completed the Cat I & Cat III Lighting installation project on Parallel Taxi at IGI Airport New Delhi.

• Designing, estimation and execution of Provision of Cat I Runway Lighting system at Safai Airport Etawah U.P.

• Site survey of various Air force station for modernization from Cat-I to Cat-II facilty.

• Completed the installation of Provision Approach path indicator at Indira Gandhi Udan Academy Raibraelly U.P.

• Completed the installation of internally illuminated wind cone at Sahara City Lukhnow U.P.

• Designing, estimation and execution of Cat I Runway Lighting project at Rajiv Gandhi International Airport Hyderabad.

In year 2007-till date

• Prepared the operation and maintenance manual for Airfield Electrical, including SOP, and EOP

• Completed the procurement of emergency lighting equipment.

• Success fully Taken over entire airfield electrical system from EPC and get the license from DGCA Bangalore airport including

• Prepared a comparison of installations with CIVIL AVIATION REQUIREMENT (CAR) to get airport License from DGCA.

• Completed the installation of 400 Hz Ground power units including designing, estimation and tendering at Bangalore International airport Bangalore.

• Estimation, tendering and procurement of suitable spares for Runway Lighting to carry out day to day maintenance activity.

• Handling the Annual maintenance contract for airfield Lighting including, ensuring the labour regulations in the contract, payment of wages

• Preparation of bills, maintaining all records with respect to maintenance contract

• Installation, testing and commissioning of Stand By Micro Processor controlled Constant Current Regulator (MCRs) including integration with Airfield Lighting Control System(ALCS).

• Designing, BOQ, estimation, tendering and execution of Provision of crossing stand by cable for emergency purpose.

• Designing, BOQ, estimation, tendering and execution of Provision of stand by LT supply for RADAR to meet emergency requirements.

• Prepared all required Document to get ISO 140001 Certificate.

• Prepared a book of technical specification for Airfield Lighting, equipment.

• Participated as a team member of SAP team to implement the SAP PM module to carry out day to day maintenance including integration of all Equipment in SAP.

• Designing, BOQ, estimation, tendering and execution of Provision of Stand Identification boards (SNI) at Apron.

• Modified PAPI angles from 3 degree 24 minutes to 3 degree.

• Estimation & designing of Abu Dhabi Air base for Cat-III system.

• Estimation & designing of Al Madinah Air port (Middle East)for Cat-III system.

• Estimation & designing of Ras Al Had Air port Oman (Middle East)for Cat-I system.

• Estimation & designing of Al Duqm Air port Oman (Middle East)for Cat-I system.

• Estimation & designing of Salalah Air port Oman (Middle East)for Cat-III system.

Location:- Pune (Praveen Kumar Dubey)



Contact this candidate