Post Job Free

Tooling resumes in Richland, WA

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 1 - 8 of 8

Operations Manager

Richland, WA
... reduced screws production time by 17% and QC time by 14% Reduced reject rate for nails and screws by over 50% (3.3% to 1.5%) Achieved over $10,000 annual cost savings for tooling Directed completion of 24 new R&D parts in one year. (Best year in ... - 2019 Sep 23

Quality Control II, NQA-1

Pasco, WA, 99301
... Repaired and maintained various tools and tooling (On own initiative). Achieved savings of upwards of $20,000 through judicious use of freight brokerage and returns (On own initiative) of unneeded Project materials. Located and maintained computer ... - 2018 Mar 05

Engineering Management, Program Management, Project Management

Richland, WA
... Provided Procurement, Tooling, and Fringe Testing support to complete tasks on-schedule. Jan 1989-Feb 2001 Sr. Stress Engineer The Boeing Company - Seattle, WA Structural Analysis and Development Engineering Leadership - Led the stress analysis ... - 2017 Aug 18

Project Manager Maintenance

Kennewick, WA
... Increased throughput of CNC shop by 25% by focusing on reducing change over times and using 5S to make needed tooling more accessible and identifiable. Trained direct reports on Continuous Improvement methodologies. Operations/Production/Maintenance ... - 2014 Jun 30

Engineer Project

Richland, WA, 99352
... Designed manufacturing tooling, developed manufacturing process for the well-equipped heavy-duty machine shop making oil-drilling equipments. Performed Operations Research models for shop floor control process, product reliability evaluations, ... - 2013 Aug 09

Engineer Project

Richland, WA, 99354
... Responsibilities involved project management of DCAC/MRM Data Conversion activities specifically for the Renton Tooling organization. Mainly responsible for providing liaison between Tooling and the Core Data Conversion/Data Validation groups. Also ... - 2011 Jul 23

Supply Chain Project Manager

Kennewick, WA, 99337
... Developed global tooling strategy for stamping manufacturing to counter price dumping by competitors. Developed low cost private label manual and pneumatic clamps for select distributors to defeat aggressive foreign competition. Cut delinquent ... - 2010 Jul 19

Industrial / Manufacturing Engineer, Lean Six Sigma, Change management

Kennewick, WA, 99336
... Introduced new processes, equipment, and tooling used in production. Performed Risk Analysis. Developed business processes and work methods. Vice President, Production Operations (10/07 – 8/08) Omega Systems, Inc., Phoenix, AZ Responsible for ... - 2009 Aug 12