|
Resume alert |
Resumes 1 - 10 of 14 |
Bareilly, Uttar Pradesh, India
... Functional expertise in handling the plant operations with key focus on bottom line profitability by ensuringoptimal utilization of resources. Adept in managing production activities involving resource planning, in-process inspection, team ...
- 2023 Jul 06
Bareilly, Uttar Pradesh, India
... sales Company: Ester india ltd Khatima -Uttaranchal Duration Mar.87-July 89 Designation Trainee chemist Job Profile plant Company: Zandu Pharmaceutical works Ltd Mumbai Duration Aug-89 Mar-93 Designation Medical Representative at BAREILLY Job ...
- 2022 Oct 11
Bareilly, Uttar Pradesh, India
... (KAKINADA) From20.05.2019 to 20.06.2019 KEY LEARNING: Overview of KGD6 plant and onshore terminal booster compressor. UNIT OPERATION: 1) Distillation 2) Blending 3) Desalting. REFINERY UNITS: 1) Steam generation 2) Wastewater Treatment 3) Power ...
- 2021 May 19
Bareilly, Uttar Pradesh, India
... New Delhi Project Manager Project – Sheeting Plant Project at Lalkuan, Dist. Nainital Planning and construction management for this time bound project requiring a Lab and in-situ soil tests and Quality Control. 1989–1990 Manas Sthali School Bareilly ...
- 2021 May 05
Mahanagar Colony, Uttar Pradesh, India
... Significant Highlights : Reduced 2 manpower / shift by implementing updated process layout with lean assembly layoutand horizontally deployed to other 3 assembly lines in the plant (total 8 manpower reduced per shift) Reduced 4 manpower / shift for ...
- 2020 Nov 10
Bareilly, Uttar Pradesh, India
... Plant-M.G.F,D.M.Plant,Pre-treatmentofrawwater, PreservationofBoilers,PreparationofalchemicalreagentsrelatingtoPowerPlantChemistry. Pre&PosttreatmentwithanalysisofBoilerWateratdifferentcapacity&pressure(sub-critica),coolingwater treatment, ...
- 2020 Oct 09
Bareilly, Uttar Pradesh, India
... of urea crystals at a large scale from Ammonia and carbon dioxide gas Engineered problem related to urea and ammonia plant, purification of waste water and gases, water cooling and cooling and of the urea crystals POSITION OF RESPONSIBLITIES ...
- 2020 Jul 01
Bareilly, Uttar Pradesh, India
... -- AutoCad Layout of Dairy Plant. -- AutoCad Drawing of Milk Silos and Tanks. -- Boiler Installation. 1 Year experience of Teaching Auto Cad in A-Tech Computer Institute Bareilly. 4 Month experience as a Service Advisor in Raj Royals Hardoi. ...
- 2020 Jun 27
Bareilly, Uttar Pradesh, India
... I have 34 years of experience of Project, Erection & Commissioning and Maintenance in the fields of Electrical, Power-Electronics, Instrumentation & Automation in Continuous Polyester Film Plants, Continuous Synthetic Yarn Plants and Steel Plant ...
- 2020 Mar 08
Bareilly, Uttar Pradesh, India
... Industrial Visits: NARORA ATOMIC POWER PLANT RELIANCE THERMAL POWER PLANT Conference/ workshop Attended: LINE FOLLOWING ROBOT Extra Curricular Activities: I GOT THE FIRST PLACE IN PLC DESIGNING ORGANIZED BY TECHVYOM (SRMS). I HAD PARTICIPATED IN ...
- 2020 Feb 05