|
Resume alert |
Resumes 1 - 4 of 4 |
Kavali, Andhra Pradesh, India
... Percentage: 64 Year of Passing: 2009 CO-CURRICULAR ACTIVITIES Attended the implant Safety Training at OEG india Private Limited, Power Plant in Ramanathapuram Attended the implant Safety Training at Meenakshi Mission Hospital, in Madurai. TRAINING ...
- 2021 Feb 15
Kavali, Andhra Pradesh, India
... In-depth understanding in reviewing engineering drawings, layouts, diagrams, technical specifications, cost estimates for erection & commissioning of the plant. Successfully completed B.E. in Mechanical Engineering from JNN Institute of Engineering, ...
- 2020 Sep 24
Kandukur, Andhra Pradesh, India
... (From Oct-2014 to Jan-2017) As a Execution Engineer & Billing Engineer (Civil Engineer now working is (2*300 MW Thermal Power Plant (Project - M/S TRN Energy Pvt. Ltd.) At Raigarh (Chhattisgarh)) Contract Awarded by BGR Energy System Ltd. M/S SN ...
- 2018 Sep 19
Kavali, AP, India
... Under Scheme of National Mineral Development corporation for Iron Ore Screening plant, Ware Houses, Iron Ore Stock pile in bunkers and Buildings Operation & Maintenance, Electrical works Including Cable design, Cable size calculations Installation, ...
- 2015 Aug 25