|
Resume alert |
Resumes 1 - 9 of 9 |
Madhurapudi, Andhra Pradesh, 533102, India
... Job responsibilities: Erection & Commissioning of 6 X 8.25 MW Vertical KAPLAN Turbines, Generators, Hydraulic system like OPU, Cooling water system and its Auxiliaries. Power house Stair case Fabrication and Erection. Erection of Sluice gates, D.T ...
- 2023 Oct 10
Rajahmundry, Andhra Pradesh, India
... Client: Foster Wheeler – UK Project Scope of Work: Construction of power house, RCC Framed building, water tanks, Erection of pre cast structures like L beam, single tee, and double tee slabs, Demolition of existing structures, floors, foundations, ...
- 2020 Sep 24
Samalkot, Andhra Pradesh, India
... Aparna enterprises pvt.ltd, 2016-18 Working as electrical technician in ceramic erection plant 'Aparna enterprises pvt.ltd', in samalkot. Present working in 'Tera software pvt.ltd' as a splicer cum supervisor. ACHIEVEMENTS AND PARTICIPATIONS I ...
- 2020 Aug 06
Rajahmundry, Andhra Pradesh, India
... stabilization of C MODEL in Chemicals optimization and chemicals SUPER BATCH DIGESTERS handling Involved in cooling tower erection in chemical plant Resource management skills Involed in VAM and THERMAX chillers trouble shooting Experienced in all ...
- 2020 Jul 21
Rajahmundry, Andhra Pradesh, India
... proper revised document from qc deparment for attending puch points Studying and analyzing the erection drawings and planning the required T&P and explaining to the erection gang with distribution of efficient man power as per job requirement. ...
- 2018 Nov 27
Samarlakota, AP, India
... Erection and commissioning of new projects. Responsible for safe plant operation, trouble shooting and emergency supply restoring. Trained the staff to acquaint with the systems I was also involved in Major overhauling and testing of 4.4MW Turbo ...
- 2018 May 21
Samarlakota, AP, India
... Monthly Maintenance of MPCB’S,Electricals connections at motor side, PT100 calibrations and CT cabrations etc (maintenance) Expertise in erection of various large size motors, daily checking earthings and motor condition. To analyze the performance ...
- 2018 Mar 11
AP, 533101, India
... Responsibilities: Maintained plant & utility equipments, checked fabrication & welding job and managed overall activities related to erection, testing, commissioning and maintenance of varied electrical equipments Handled basic engineering ...
- 2016 Jun 30
anaparthi, AP, 533342, India
... Experience in Detail: • Experienced in Erection and commission of 9MW and 20MW water treatment Related works. • Analyze of Boiler water. • Control & Monitoring of all the preservation activities related to DM Plant & HRSG • Monitoring the CW ...
- 2012 Jun 30