Post Job Free

Drilling resumes in Eastlake, OH

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 41 - 47 of 47

Sales Manager

Cleveland, OH, 44129
... The unique feature of a mechanic's / maintenance length was introduced to help offer the user greater control when drilling with a hand drill. By 2003 Quad-Cut drill bit sales were over $7.5 million with an above industry average profit return. ... - 2010 Jul 20

Electrical Engineer Mechanical

Mentor, OH, 44060
... Equipment includes multiple spindle heads for drilling and tapping, work holding, and indexers. Machines vary from single axis feed units through integrating multiple axes. ( Design of panel enclosures, electrical, pneumatic and hydraulic schematics ... - 2010 Jul 14

Sales Engineer

Chardon, OH, 44024
... Design of automated hydraulic drilling equipment, hydraulic machinery, and systems. 1975 to 1983; Senior Product Design Engineer, Parker Hannifin Hydraflex Division, Mentor Ohio. Manager of the Engineering Department, and seven Designers. ... - 2010 May 10

Engineer Mechanical

Mentor, OH, 44060
... position - Adecco) Provided general technical and drafting support for product improvement, redesign, and restructuring of radiation detectors used in the oil and gas drilling industry - as requested by Manufacturing, Purchasing, or the customer. ... - 2010 May 08

Supply Chain Management

Cleveland, OH, 44113
... Accenture 2002 - 2007 Client: ConocoPhillips Designed and implemented common processes across upstream (exploration and drilling) and downstream (refineries) processes on the company's SAP platform. . Analyzed current processes across sites and ... - 2010 Mar 09

Project Manager Customer Service

Twinsburg, OH, 44087
... Designed and built tooling and fixtures for welding and pipe bending/machined parts and milling and drilling fixtures. Trained personnel, ordered tooling and materials. Reported to Plant Manager. Lufran, Inc., Macedonia, Ohio 1983 - 1986 Foreman, ... - 2010 Mar 09

Manager Engineer

Willoughby, OH, 44094
... Procured and installed (Sept.94) turning center and built the coupler cell with four (4) other machines (drilling and milling). 175k project. Procured, (Jan. 95) customized, built and installed secondary drilling machine for XIH cell. 16k project. ... - 2010 Mar 09
Previous 1 2 3 4 5