Surat, Gujarat, India
... PERCENTAGE: 70% (7.4 CGPA) PROJECT COMPARATIVE STUDIES ON KINETICS AND MECHANISM OF IRON OXIDE REDUCTION BY COAL AND CHARCOAL. TRAINING OBSERVATION AND STUDY OF BOKARO STEEL PLANT © SENTRING PLANT © COKE OVEN PLANT e BLAST FURNACE e@ L-D FURNACE
- Apr 18
Kolkata, West Bengal, India
J*ARUN KUMAR SENGUPTA I am a professional having vast knowledge and experience in Electrical Installation, like 33 KV Substation, 33 K.V overhead line, underground electrical installation which includes different types of pumps, drill machines, coal ...
- Apr 14
Jaipur, Rajasthan, India
... LTD.-Feb.1987-Dec.1994,Supervisor Erection, commissioning of 2X 110 &210 (M.Watt) 04 Units, coal based, Thermal Power with BHEL-erection of Boiler Drum, Headers, pressure Vessels, Steam Pipes-MSL.HRH,CRH, Economizer,Structural Part with Alignment ...
- Apr 14
Mumbai, Maharashtra, India
... Coal Mine Netizen Engineering Pvt Ltd. C/O Sasan Coal Mine (Reliance Power Ltd) Singrauli, M.P. Jul.2021 – Feb. 2023 Growth-path: Electrical Supervisor : Area- SME Plant Responsible for the overall operation and maintenance of all equipment's which ...
- Apr 11
Rawatpura Toos, Rajasthan, India
... 2022 UPES 3.0 PROFESSIONAL QUALIFICATION: ● First Class Mines Manager’s Certificate (Coal) ● First Class Mines Manager’s Certificate (Metal) 4.0 WORK EXPERIENCE: 4.1 Assistant Manager/ Safety Officer,North Eastern CoalFields Limited, M/s. ...
- Apr 11
Kolkata, West Bengal, India
... Designing of high velocity and medium velocity water spray system for oil filled transformers, cable cellars, coal conveyors, fuel oil tanks etc., as per NFPA 15 & IS 15325 standards. Designing of low and medium expansion fixed / semi-fixed foam ...
- Apr 03
Anuppur, Madhya Pradesh, India
... Sub-Critical, PF Boiler, coal based Thermal Power Plant. Duration : From 1st Nov 2019 to till date…(approx 4 years) Current Designation : Senior Engineer Job Responsibility : BTG Desk Operation Work Outline- ● Worked as a Desk Engineer BTG (Boiler, ...
- Mar 28
Lucknow, Uttar Pradesh, India
... Vertical Roller Mills of Loesche, Pfeiffer and OK Mill and UBE JAPAN Raw meal grinding 46.2+2, Cement grinding 56.3+3, Coal Mill 28.2 & Ball Mills, Hydraulic and Pneumatic Systems, FLSmidth make Kiln, Cooler & Preheater systems,LIMESTONE IMPACT ...
- Mar 28
Chennai, Tamil Nadu, India
... 2)KCSURENDRAN Designation : Site In charge - Projects Project : Shore Unloader and Stacker –Cum- Reclaimer (kamarajar Port) Site : Kamarajar Port and Chettinad International Coal Terminal Ltd.., Duration : April 2018 to May-2022. 2)Gulf Engineers ...
- Mar 24
Mumbai, Maharashtra, India
... SSC Amravati 2009 50.76% WORKING EXPERIENCE : Coal fire Boiler, Briket Fire Boiler, Waste Heat Boiler ( SO2 Fire )FO fire Boiler, Gas fire Boiler and Electric fire Boiler. I have worked experience of Durga Shakti foods Pvt. ltd. Khamgoan as a Boiler ...
- Mar 23