|
Resume alert |
Resumes 1 - 5 of 5 |
Khobar, Eastern, Saudi Arabia
... Physical Testing,Check the Particular sites physically for Sector and cables swap, orientation, Tilt, Type of Antenna and all Checking in BTS end. After Doing Drive Test for a particular site clockwise and anticlockwise to check Rx level, Rx quality ...
- 2022 Mar 09
Dammam, Eastern, Saudi Arabia
... -Well experienced in NSN 3G Equipments for Node-B Supreme and Flexi BTS - Installation & Integration, Commissioning and Software upgrade for 3G Nokia Equipment. -Maintenance and Troubleshooting & QA/QC for 3G Nokia BTS. -Trouble shooting for Nokia ...
- 2021 Nov 06
Dammam, Eastern, Saudi Arabia
... 2002 Job Experiences -- Installation, Commissioning and Maintenance of BTS stations (Motorola equipment). -Installation, Commissioning and Maintenance of PDH microwave links (Sagem, Sierra Com.) -Supervision project of Sagem Links Network. ...
- 2021 Sep 17
Dammam, Eastern, Saudi Arabia
... 2018 Business Technology Solution “BTS”, I had attended Data Integrity training. 28 -29, Aug. 2018 Agon Academy, I had attended Computerized System Software Validation training.
- 2020 Dec 13
Dammam, Eastern Province, Saudi Arabia
... AFRO – Egypt Company, Egypt Project Engineer June 2010 - October 2010 Vodafone Rollout and expansion project Installation and commissioning of Ericsson 2G BTS,RBS “2206, 2106, 2308, 2309, 2302”, Ericsson 3G RBSs Node B and,RRH “3206, 3106, 3418, ...
- 2020 Mar 22