Kigali, Rwanda
... Operating and maintaining the Boiler, Turbine, Generator units and other auxiliaries to ensure the efficiency and reliability of the plant. Perform the electrical, basic instrument and control troubleshooting, maintaining, repairing, cleaning, ...
- Mar 11
Kigali, Rwanda
... Maintenance Engineer in MUNDI ltd February, 2017– May, 2019 Operate different pneumatic devices maintain and service boiler Installation and commissioning of CCTV systems. Troubleshoot, maintain and repair alarm systems. design electrical systems ...
- 2023 Dec 12
Kigali, Rwanda
... as a “Field Construction Manager” in the Sugar & Power plant project, handled the entire Civil Structures, Reservoirs, 21m dia with 8 m height of Steel Tanks, Boiler House, Mill House, Pump Stations, Road both Concrete and Asphalt and Piping works. ...
- 2023 Sep 30
Kigali, Rwanda
... publication Professional Internship, Brewery Company based in Rwanda (SKOL) Oct/2016 – Jan/2017 Preventive maintenance of boiler and other electrical machines from utility plant Preventive maintenance of production and packaging machines Support in ...
- 2023 Sep 05
Kigali, Rwanda
... I operated and maintained steam boiler for generating steam to be used for heating in Extruder. Nitrogen generators to produce nitrogen to be used in packaging to avoid oxygen in the product. I also operated and maintained 1.6 MW UPS and Backup ...
- 2023 Aug 31
Kigali, Rwanda
... Engineer/Commissioning March 2020-March 2021 Working at home for Assisting in Design review and commissioning high pressure boiler, other pressure vessels and steam turbine along with balance of 2X35MW Gisagara PEAT FIRED POWER PLANT Assisted in ...
- 2023 Aug 15
Kigali, Rwanda
... Duties and responsibilities In charge of boiler, Turbine, Generator Units, Pumps and other auxiliaries to Ensure the efficiency and reliability of the power plant Lead and/or participate in any plant Root Cause Failure Analysis(RCFA) and Modes ...
- 2023 Aug 14
Kigali, Rwanda
... Project Manager, Technology Consults Ltd Activities performed: Was involved in guiding the team, organising stakeholder workshops, desk research and report writing Name of assignment: Century Bottling Company Limited Boiler Failure Assessment Year: ...
- 2020 Aug 23
Kigali, Rwanda
... Since Jan, 2001 to September’2002 – Shree Ram Boiler, Tangi, Cuttack (Odisha) as Accounts Executive. Maintenance of Cash and Bank Book. Preparation of Bank Reconciliation statement. Preparation of Invoices. Preparation Monthly inventory report ...
- 2019 Dec 11