Sign in

Maintenance Engineer

Company:
Daikyo International Philippine Inc.
Location:
Calamba, CALABARZON, Philippines
Posted:
February 15, 2018
Description:

DUTIES AND RESPONSIBILITIES

Responsible for the overall support on engineering activities in the plant to ensure that all buildings, machines, and equipment are well-maintained with emphasis on total delivery, quality, cost optimization and cost reduction.

Facilitate all buildings and facilities maintenance on mechanical/electrical facilities equipment.

Assist on the installation, testing, operation, maintenance, and repair of facilities and equipment.

Facilitate the installation, testing, commissioning and qualification of new equipment and facilities.

Support engineering activities, engineering testing, maintenance, and repair.

Execute, monitor, control, and improve preventive and predictive maintenance plan.

Support the trial sample production of new items from production until the entire process is completed.

Support other department such as but be not limited to Quality and Sales Department for technical expertise such as material properties, processes, machine capabilities, etc.

Ensure the effective use of materials, equipment and resources in producing cost-effective quality products.

Perform other jobs that may be assigned by the immediate head.

MINIMUM JOB QUALIFICATIONS

Male/ Female

Engineering Graduate(preferably Electrical Engineering) and / or with at least 2 years relevant experience.

Preferably with professional license.

With background in Manufacturing Industry