Sign in

Senior Process Engineer, Hot Mill

Company:
Rice Consulting Group LLC
Location:
Kentucky, United States
Salary:
Commensurate
Posted:
November 21, 2016

Posted By Premium Recruiter

Description:

Key Deliverables:

• Products and materials

o General metallurgical knowledge about the products produced in the plant

o Detailed knowledge on thermo-mechanical & physical processing for assigned installations

• New product implementation

o Support Product Technology or to the R&D implementation department to ensure fast and robust introduction of new specifications or products.

o Checks and refreshes the installation bible(s) and capabilities.

• Investments

o Start up and commissioning support of new instillations and processes

o Detects the need for new investments or processes to improve quality or robustness.

o Defines process requirements, prepares and follows up the startup of, and verifies results from new investments or processes.

• Systems, methods & concepts for the installations assigned

o Good knowledge of all general systems used in the Duffel plant : CICS, study and claim database, Oracle Discoverer, MES, MIW, VALCAST.

o Good knowledge of all (level 2) preset systems.

o Good knowledge of all (level 1) control systems used.

o Familiar with the IT architecture of the plant interconnecting the platforms mentioned above.

o Good knowledge of all common PC Office tools.

Required Qualifications

• Engineering degree required.

• Has a profound knowledge of all processes of assigned installation - Mechanical & hydraulics, Chemical, Physical, Electrical & controls, Measurement systems, IT platforms (level 1– 3), and Thermo-mechanical processing capabilities.

• Experience with the aluminum rolling process required.

• Six sigma green belt or black belt preferred.