Chester, SD
... Create and maintain
WPS sheets and weld maps for current and new product. Review down time logs and look for root causes for weld related issues. Review welding and robotic programs and weld schedules for cost reductions and continuous improvements. ...
-
2012 Dec 06
India, Shivamogga, KA
... the welders and qualifying according to BSEN or AWS standards Ensuring welders are following
WPS welding quality requirements in the job Projects involved: Production: Project : Ras Az Zawar Aluminium Smelter Project Product : Superstructure-721 No. ...
-
2012 Dec 05
Singapore, JOHOR
... : BO-A CPP PLATFORM FABRICATOR : SIME DARBY ENGINEERING CLIENT : TALISMAN ENERGY RESPONSIBILITY : • Obtained All Relevant Documentation Or Ensure It Relevant Specification And Codes, Procedures Copies Such Like
WPS, WPQT, Inspection Test Program( I. ...
-
2012 Dec 04
Philippines, Quezon City
... Jubail 2 Kingdom of Saudi Arabia Position : Tig Welder/Arc Welder Project : Karan K One Fabrication Shop-Saudi Aramco Job Description: Carbon Steel Low temperature carbon steel process qualified 2" OD & over up to 11.08 All GTAW
wps #1/1-08 rev. ...
-
2012 Dec 04
United States
... FCAW) Flux Cord Arc Welding SAW) Submerged Arc Welding HDPE) Hy Density Poly Ethylene PQR ) procedure Qualification Record
WPS ) Welding Procedure Specification WQT ) Welding Qualification Test NDT ) Non Destructive Testing NDE ) Non Destructive ...
-
2012 Dec 03
Denver, CO
... Maintained
WPS procedures as well as update drawing. Over saw any weld repairs as well as clean up need to complete project. Exterran Energy, Houston TX 2011-2012 Quality Control Inspector Performed quality inspections of pressure vessels for ...
-
2012 Dec 03
India, Madurai, TN
... Preparation of ITP and selection of
WPS as per the Project requirements. Qualifying Welder for various materials in accordance with the approved
WPS 1 Maintaining welder’s performance report. Maintaining consumable control records. Receiving ...
-
2012 Dec 03
Baton Rouge, LA
... eZZrcorBUmCqIrT*VJdVo2Ib0M7MIeieNI9Qk5qvfwUQCmjp6eB/resume2008withcertshazmzt.wpsresume 2008 with certs hazmzt.
wps LOURINDA WOODhttp://api.ning.com:80/files/hnffIjRyVKWs89Nv1rS-ZK3yoVv5iQH173O1ZFwI*KjewNexI8UrqC*Vk6EtPDC*XBEU4j-Wjd ...
-
2012 Nov 30
United Arab Emirates, Abu Dhabi, AZ
... Handling most | | |of the critical system running in the bank ie Clearing, SWIFT, UAEFTS, | | |Core Banking, AML and
WPS. Liaising with Central Bank of UAE for new | | |requiremnts and production systems support. Supporting core banking | | ...
-
2012 Nov 30
Indonesia, Bekasi, West Java
... workper ASME/ ANSI B.31.1 • Inspection spool pipe Fit Up fabrication ( Dimension, Leveling, Beveling, Gap, Drawing ) • Verify
WPS and Welder Qualification • Line check • Punch list • Punch kill • Prepare and reviewed test package • Witness and ...
-
2012 Nov 30
United States
... 2006 Verifying welds in erection stage are produced in conformance with the approved
WPS. Identify defective works; prepare NCR and follow-up. Offer drawings, technical support and translate technical documentation to senior foreman, assuring these ...
-
2012 Nov 29
India, Faridabad, HR
... Proficient in preparing
WPS/ PQR/ WPQs. . Performing Root Cause Analysis and deciding upon the corrective and Preventive actions based on the RCA done. . Lateral thinking for problem solving newer ideas and their implementations. . Good ...
-
2012 Nov 28
India, Chennai, TN
... > Prepare PQR &
WPS, qualify the welders and prepare welder certificates and
WPS registers. Update welder performance and prepare weekly reports. > Implement and monitor the QA systems and QC procedures. Monitor welding activities and prepare weld ...
-
2012 Nov 28
India, Pondicherry, PY
... Preparation of PQR/
WPS as per code & client specification and conducting test for the same. 0. Ensures implementation/compliance with Project Quality Plan (PQP), Project Quality related procedures for document control, material control/inspection ...
-
2012 Nov 28
India, MH
... Carrying out documentation of quality documents like IMIR, Fit-up Weld visual,
WPS, WPR, WPQ, DPT, RT and Hydro Test reports. . To prepare Material Requirement Planning, DPR. . Handling of all critical equipments for material handling. |Major ...
-
2012 Nov 27
Indonesia
... make sure welding is carried out as per
WPS and welding schedule, perform visual welding inspection, Reviewed and signed MDR, Prepared Daily reports review NDT reports, and review film radiographic interpretation, attend project meeting. ...
-
2012 Nov 27
India, Hyderabad, AP
... 3Review of
WPS for various materials and size as per requirements. 4Witnessing of welders and Procedure Qualification Test, preparation of Test Piece and verifying compliance with appropriate standards and specifications. 5Control of welding ...
-
2012 Nov 27
Portsmouth, VA
... Randomly checked welding parameters according to approved
WPS (Ampere, Voltage, Travel Speed and Gas flow rate. Checking the adequacy of equipment for preheating, welding, heat treatments and weld examinations . Positions pieces to be welded into ...
-
2012 Nov 27
United Arab Emirates, Abu Dhabi, AZ
... Material receiving and inspection ( verification of heat number, material certificate and size) Preparing PQR and
WPS in applicable code Carrying out welder qualification test (WQT) in applicable code Verify the approval of original/repair ...
-
2012 Nov 25
Auburn, WA
... RoRo/ LoLo vessels -Awards received under every command -Experienced in staging yard operations -Loaded and unloaded cargo onto trucks, planes, ships -Experienced in 3D bar code inventory, using handheld scanners, on
WPS (Worldwide Port System). ...
-